blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1839798

EP1839798 - Apparatus for laser cutting and/or marking using fixed motors and transmission belt for moving a laser light emitter ; Method using such apparatus [Right-click to bookmark this link]
Former [2007/40]Apparatus and method for laser cutting and/or marking using fixed motors and transmission belt for moving a laser light emitter
[2012/18]
StatusNo opposition filed within time limit
Status updated on  26.07.2013
Database last updated on 24.04.2024
Most recent event   Tooltip17.07.2015Lapse of the patent in a contracting state
New state(s): HU, LU
published on 19.08.2015  [2015/34]
Applicant(s)For all designated states
SEI S.p.A.
Via R. Ruffilli 1
24035 Curno (BG) / IT
[N/P]
Former [2007/40]For all designated states
SEI S.p.A.
Via R. Ruffilli 1
24035 Curno BG / IT
Inventor(s)01 / Fustinoni, Ettore
Via G. DeGrassi, 39
24126 Bergamo / IT
 [2007/40]
Representative(s)Gislon, Gabriele, et al
Marietti, Gislon e Trupiano S.r.l.
Via Larga, 16
20122 Milano / IT
[N/P]
Former [2012/38]Gislon, Gabriele, et al
Marietti, Gislon e Trupiano S.r.l. Via Larga 16
20122 Milano / IT
Former [2007/40]Gislon, Gabriele, et al
Marietti, Gislon e Trupiano S.r.l. Via Larga, 16
20122 Milano / IT
Application number, filing date06425205.927.03.2006
[2007/40]
Filing languageIT
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP1839798
Date:03.10.2007
Language:EN
[2007/40]
Type: B1 Patent specification 
No.:EP1839798
Date:19.09.2012
Language:EN
[2012/38]
Search report(s)(Supplementary) European search report - dispatched on:EP18.09.2006
ClassificationIPC:B23K26/08, B23Q1/62, B23K26/38, B23Q5/34, F16H19/00, B25J9/10, B23K26/10
[2007/40]
CPC:
B23K26/10 (EP,US); B23K26/38 (EP,US); B23Q1/621 (EP,US);
B25J9/026 (EP,US); B25J9/104 (EP,US); Y10T74/18848 (EP,US)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2007/40]
TitleGerman:Vorrichtung zum Laserschneiden und/oder -markieren unter Verwendung von fixierten Antrieben und Antriebriemen zur Bewegung des Laserstrahlsenders ; Verfahren unter Verwendung einer solchen Vorrichtung[2012/20]
English:Apparatus for laser cutting and/or marking using fixed motors and transmission belt for moving a laser light emitter ; Method using such apparatus[2012/18]
French:Appareil de découpage ou marquage laser utilisant des moteurs fixes et une courroie de transmission pour déplacer l'émetteur laser ; Méthode utilisant un tel appareil[2012/18]
Former [2007/40]Vorrichtung und Verfahren zum Laserschneiden und/oder -markieren unter Verwendung von fixierten Antrieben und Antriebriemen zur Bewegung des Laserstrahlsenders
Former [2007/40]Apparatus and method for laser cutting and/or marking using fixed motors and transmission belt for moving a laser light emitter
Former [2007/40]Appareil et méthode de découpage ou marquage laser utilisant des moteurs fixes et une courroie de transmission pour déplacer l'émetteur laser
Examination procedure19.02.2008Examination requested  [2008/14]
28.03.2008Despatch of a communication from the examining division (Time limit: M06)
12.11.2008Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time
12.01.2009Reply to a communication from the examining division
13.05.2009Despatch of a communication from the examining division (Time limit: M06)
23.11.2009Reply to a communication from the examining division
30.09.2010Despatch of a communication from the examining division (Time limit: M06)
28.03.2011Reply to a communication from the examining division
19.04.2012Communication of intention to grant the patent
03.08.2012Fee for grant paid
03.08.2012Fee for publishing/printing paid
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  28.03.2008
Opposition(s)20.06.2013No opposition filed within time limit [2013/35]
Request for further processing for:The application is deemed to be withdrawn due to failure to reply to the examination report
12.01.2009Request for further processing filed
12.01.2009Full payment received (date of receipt of payment)
Fees paidRenewal fee
27.03.2008Renewal fee patent year 03
20.03.2009Renewal fee patent year 04
08.03.2010Renewal fee patent year 05
08.03.2011Renewal fee patent year 06
21.03.2012Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU27.03.2006
AT19.09.2012
BE19.09.2012
CY19.09.2012
CZ19.09.2012
DK19.09.2012
EE19.09.2012
FI19.09.2012
LT19.09.2012
LV19.09.2012
NL19.09.2012
PL19.09.2012
RO19.09.2012
SE19.09.2012
SI19.09.2012
SK19.09.2012
TR19.09.2012
BG19.12.2012
GR20.12.2012
ES30.12.2012
IS19.01.2013
PT21.01.2013
GB27.03.2013
IE27.03.2013
LU27.03.2013
CH31.03.2013
LI31.03.2013
MC31.03.2013
[2015/34]
Former [2015/32]AT19.09.2012
BE19.09.2012
CY19.09.2012
CZ19.09.2012
DK19.09.2012
EE19.09.2012
FI19.09.2012
LT19.09.2012
LV19.09.2012
NL19.09.2012
PL19.09.2012
RO19.09.2012
SE19.09.2012
SI19.09.2012
SK19.09.2012
TR19.09.2012
BG19.12.2012
GR20.12.2012
ES30.12.2012
IS19.01.2013
PT21.01.2013
GB27.03.2013
IE27.03.2013
CH31.03.2013
LI31.03.2013
MC31.03.2013
Former [2014/09]AT19.09.2012
BE19.09.2012
CY19.09.2012
CZ19.09.2012
DK19.09.2012
EE19.09.2012
FI19.09.2012
LT19.09.2012
LV19.09.2012
NL19.09.2012
PL19.09.2012
RO19.09.2012
SE19.09.2012
SI19.09.2012
SK19.09.2012
BG19.12.2012
GR20.12.2012
ES30.12.2012
IS19.01.2013
PT21.01.2013
GB27.03.2013
IE27.03.2013
CH31.03.2013
LI31.03.2013
MC31.03.2013
Former [2014/08]AT19.09.2012
BE19.09.2012
CY19.09.2012
CZ19.09.2012
DK19.09.2012
EE19.09.2012
FI19.09.2012
LT19.09.2012
LV19.09.2012
NL19.09.2012
PL19.09.2012
RO19.09.2012
SE19.09.2012
SI19.09.2012
SK19.09.2012
BG19.12.2012
GR20.12.2012
ES30.12.2012
IS19.01.2013
PT21.01.2013
IE27.03.2013
CH31.03.2013
LI31.03.2013
MC31.03.2013
Former [2014/07]AT19.09.2012
BE19.09.2012
CY19.09.2012
CZ19.09.2012
DK19.09.2012
EE19.09.2012
FI19.09.2012
LT19.09.2012
LV19.09.2012
NL19.09.2012
PL19.09.2012
RO19.09.2012
SE19.09.2012
SI19.09.2012
SK19.09.2012
BG19.12.2012
GR20.12.2012
ES30.12.2012
IS19.01.2013
PT21.01.2013
IE27.03.2013
MC31.03.2013
Former [2013/47]AT19.09.2012
BE19.09.2012
CY19.09.2012
CZ19.09.2012
DK19.09.2012
EE19.09.2012
FI19.09.2012
LT19.09.2012
LV19.09.2012
NL19.09.2012
PL19.09.2012
RO19.09.2012
SE19.09.2012
SI19.09.2012
SK19.09.2012
BG19.12.2012
GR20.12.2012
ES30.12.2012
IS19.01.2013
PT21.01.2013
MC31.03.2013
Former [2013/34]AT19.09.2012
BE19.09.2012
CY19.09.2012
CZ19.09.2012
DK19.09.2012
EE19.09.2012
FI19.09.2012
LT19.09.2012
LV19.09.2012
NL19.09.2012
PL19.09.2012
RO19.09.2012
SE19.09.2012
SI19.09.2012
SK19.09.2012
BG19.12.2012
GR20.12.2012
ES30.12.2012
IS19.01.2013
PT21.01.2013
Former [2013/31]AT19.09.2012
BE19.09.2012
CY19.09.2012
CZ19.09.2012
EE19.09.2012
FI19.09.2012
LT19.09.2012
LV19.09.2012
NL19.09.2012
PL19.09.2012
RO19.09.2012
SE19.09.2012
SI19.09.2012
SK19.09.2012
GR20.12.2012
ES30.12.2012
IS19.01.2013
PT21.01.2013
Former [2013/28]BE19.09.2012
CY19.09.2012
CZ19.09.2012
EE19.09.2012
FI19.09.2012
LT19.09.2012
LV19.09.2012
NL19.09.2012
PL19.09.2012
RO19.09.2012
SE19.09.2012
SI19.09.2012
SK19.09.2012
GR20.12.2012
ES30.12.2012
IS19.01.2013
PT21.01.2013
Former [2013/23]BE19.09.2012
CY19.09.2012
CZ19.09.2012
EE19.09.2012
FI19.09.2012
LT19.09.2012
LV19.09.2012
NL19.09.2012
PL19.09.2012
RO19.09.2012
SE19.09.2012
SI19.09.2012
SK19.09.2012
GR20.12.2012
ES30.12.2012
IS19.01.2013
Former [2013/22]BE19.09.2012
CY19.09.2012
CZ19.09.2012
EE19.09.2012
FI19.09.2012
LT19.09.2012
LV19.09.2012
NL19.09.2012
SE19.09.2012
SI19.09.2012
GR20.12.2012
ES30.12.2012
IS19.01.2013
Former [2013/20]BE19.09.2012
CY19.09.2012
FI19.09.2012
LT19.09.2012
LV19.09.2012
SE19.09.2012
SI19.09.2012
GR20.12.2012
Former [2013/12]CY19.09.2012
FI19.09.2012
LT19.09.2012
LV19.09.2012
SE19.09.2012
SI19.09.2012
GR20.12.2012
Former [2013/11]CY19.09.2012
FI19.09.2012
LT19.09.2012
LV19.09.2012
SI19.09.2012
GR20.12.2012
Former [2013/10]CY19.09.2012
FI19.09.2012
LT19.09.2012
Former [2013/09]FI19.09.2012
LT19.09.2012
Former [2013/08]LT19.09.2012
Documents cited:Search[XY]WO9637346  (GUARINI VITTORIO [IT]) [X] 1-5,7-10,13,14 * page 1, paragraph 3 - page 2, paragraph 2 * * page 6, paragraphs 1-3 * * page 8, paragraphs 1,2; figures 1-3 * [Y] 6,11,12;
 [Y]DE4444523  (REINECKE UWE DIPL ING [DE]) [Y] 6,13 * column 1, lines 11-28 * * column 4, lines 12-38; figure 1 *;
 [Y]US2785941  (SUTHERLAND MACKLEM F, et al) [Y] 11,12 * column 1, lines 25-36 * * column 1, line 53 - column 2, line 39; figure 1 *;
 [Y]WO9914011  (TRODAT WERKE WALTER JUST GMBH [AT], et al) [Y] 1-5,7-11,13,14 * abstract *;
 [Y]GB2391535  (BRENNAN JOHN MICHAEL [GB]) [Y] 1-5,7-11,13,14 * page 1, paragraph 2 * * page 1, paragraph 7 - page 2, paragraph 3; figure . *;
 [A]US6070480  (KERSCHNER RONALD K [US]) [A] 1-5,7-11,13,14 * column 2, line 38 - column 3, line 26; figures 1,2 *;
 [A]FR2564356  (BENEDITE CLAUDE LASER TECH [FR]) [A] 1-14 * abstract *
by applicantUS6772661
 US6192777
 WO2005113183
 WO9637346
 DE4444523
 US2785941
 WO9914011
 GB2391535
 US6070480
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.