blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1848365

EP1848365 - PROCEDURE FOR DESIGN AND PRODUCTION OF IMPLANT-BASED FRAMEWORKS FOR COMPLEX DENTAL PROSTHESES [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  06.06.2014
Database last updated on 08.10.2024
Most recent event   Tooltip15.07.2016Lapse of the patent in a contracting state
New state(s): TR
published on 17.08.2016  [2016/33]
Applicant(s)For all designated states
LayerWise N.V.
Kapeldreef 60
3001 Heverlee / BE
[2009/20]
Former [2007/44]For all designated states
K.U. Leuven Research and Development
Groot Begijnhof 58-59
3000 Leuven / BE
Inventor(s)01 / KRUTH, Jean-Pierre
F. Verbiestlaan 11
B-3001 Heverlee / BE
02 / NAERT, Ignace
Meesberg 67
B-3220 Holsbeek / BE
03 / VANDENBROUCKE, Ben
Flanders Fieldweg 18
B-8790 Waregem / BE
 [2007/44]
Representative(s)Bird, William Edward, et al
Bird Goën & Co
Wetenschapspark Arenberg
Gaston Geenslaan 9
3001 Heverlee / BE
[2013/31]
Former [2007/44]Bird, William Edward, et al
Bird Goën & Co. Klein Dalenstraat 42A
3020 Winksele / BE
Application number, filing date06705053.425.01.2006
[2007/44]
WO2006BE00005
Priority number, dateGB2005000146425.01.2005         Original published format: GB 0501464
[2007/44]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2006079188
Date:03.08.2006
Language:EN
[2006/31]
Type: A1 Application with search report 
No.:EP1848365
Date:31.10.2007
Language:EN
The application published by WIPO in one of the EPO official languages on 03.08.2006 takes the place of the publication of the European patent application.
[2007/44]
Type: B1 Patent specification 
No.:EP1848365
Date:31.07.2013
Language:EN
[2013/31]
Search report(s)International search report - published on:EP03.08.2006
ClassificationIPC:A61C13/00, B22F3/105
[2007/44]
CPC:
A61C13/0004 (EP,US); A61C13/0018 (EP,US); B22F10/25 (EP,US);
B22F10/28 (EP,US); B22F10/47 (EP,US); B29C64/153 (EP,US);
B33Y70/00 (EP,US); B33Y80/00 (EP,US); G05B19/4099 (EP,US);
A61C8/0048 (EP,US); B29C64/165 (EP,US); G05B2219/45167 (EP,US);
G05B2219/49018 (EP,US); G16H20/40 (US); Y02P10/25 (EP,US);
Y10T29/49567 (EP,US); Y10T29/49995 (EP,US) (-)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2007/44]
TitleGerman:AUSLEGUNGS- UND HERSTELLUNGSVERFAHREN FÜR RAHMEN AUF IMPLANTATGRUNDLAGE FÜR KOMPLEXE ZAHNPROTHESEN[2007/44]
English:PROCEDURE FOR DESIGN AND PRODUCTION OF IMPLANT-BASED FRAMEWORKS FOR COMPLEX DENTAL PROSTHESES[2007/44]
French:PROCÉDURE DE CONCEPTION ET DE RÉALISATION D'ARMATURES SUR IMPLANTS POUR PROTHÈSES DENTAIRES COMPLEXES[2013/07]
Former [2007/44]PROCEDURE DE CONCEPTION ET DE REALISATION D'ARMATURES SUR IMPLANTS POUR PROTHESES DENTAIRES COMPLEXES
Entry into regional phase27.08.2007National basic fee paid 
27.08.2007Designation fee(s) paid 
27.08.2007Examination fee paid 
Examination procedure26.10.2006Request for preliminary examination filed
International Preliminary Examining Authority: EP
27.08.2007Amendment by applicant (claims and/or description)
27.08.2007Examination requested  [2007/44]
18.04.2011Despatch of a communication from the examining division (Time limit: M04)
24.08.2011Reply to a communication from the examining division
13.11.2012Cancellation of oral proceeding that was planned for 11.12.2012
11.12.2012Date of oral proceedings (cancelled)
15.01.2013Communication of intention to grant the patent
15.05.2013Fee for grant paid
15.05.2013Fee for publishing/printing paid
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  18.04.2011
Opposition(s)02.05.2014No opposition filed within time limit [2014/28]
Fees paidRenewal fee
27.08.2007Renewal fee patent year 03
30.01.2009Renewal fee patent year 04
25.01.2010Renewal fee patent year 05
28.12.2010Renewal fee patent year 06
14.11.2011Renewal fee patent year 07
26.12.2012Renewal fee patent year 08
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU25.01.2006
AT31.07.2013
BG31.07.2013
CY31.07.2013
CZ31.07.2013
DK31.07.2013
EE31.07.2013
FI31.07.2013
LT31.07.2013
LV31.07.2013
MC31.07.2013
PL31.07.2013
RO31.07.2013
SI31.07.2013
SK31.07.2013
TR31.07.2013
GR01.11.2013
IS30.11.2013
PT02.12.2013
[2016/33]
Former [2016/32]HU25.01.2006
AT31.07.2013
BG31.07.2013
CY31.07.2013
CZ31.07.2013
DK31.07.2013
EE31.07.2013
FI31.07.2013
LT31.07.2013
LV31.07.2013
MC31.07.2013
PL31.07.2013
RO31.07.2013
SI31.07.2013
SK31.07.2013
GR01.11.2013
IS30.11.2013
PT02.12.2013
Former [2016/25]AT31.07.2013
BG31.07.2013
CY31.07.2013
CZ31.07.2013
DK31.07.2013
EE31.07.2013
FI31.07.2013
LT31.07.2013
LV31.07.2013
MC31.07.2013
PL31.07.2013
RO31.07.2013
SI31.07.2013
SK31.07.2013
GR01.11.2013
IS30.11.2013
PT02.12.2013
Former [2014/38]AT31.07.2013
CY31.07.2013
CZ31.07.2013
DK31.07.2013
EE31.07.2013
FI31.07.2013
LT31.07.2013
LV31.07.2013
MC31.07.2013
PL31.07.2013
RO31.07.2013
SI31.07.2013
SK31.07.2013
GR01.11.2013
IS30.11.2013
PT02.12.2013
Former [2014/23]AT31.07.2013
CY31.07.2013
CZ31.07.2013
DK31.07.2013
EE31.07.2013
FI31.07.2013
LT31.07.2013
LV31.07.2013
PL31.07.2013
RO31.07.2013
SI31.07.2013
SK31.07.2013
GR01.11.2013
IS30.11.2013
PT02.12.2013
Former [2014/22]AT31.07.2013
CY31.07.2013
DK31.07.2013
FI31.07.2013
LT31.07.2013
LV31.07.2013
PL31.07.2013
RO31.07.2013
SI31.07.2013
GR01.11.2013
IS30.11.2013
PT02.12.2013
Former [2014/21]AT31.07.2013
CY31.07.2013
DK31.07.2013
FI31.07.2013
LT31.07.2013
LV31.07.2013
PL31.07.2013
SI31.07.2013
GR01.11.2013
IS30.11.2013
PT02.12.2013
Former [2014/18]AT31.07.2013
CY31.07.2013
FI31.07.2013
LT31.07.2013
LV31.07.2013
PL31.07.2013
SI31.07.2013
GR01.11.2013
IS30.11.2013
PT02.12.2013
Former [2014/12]CY19.06.2013
AT31.07.2013
FI31.07.2013
LT31.07.2013
LV31.07.2013
PL31.07.2013
SI31.07.2013
GR01.11.2013
IS30.11.2013
PT02.12.2013
Former [2014/11]CY19.06.2013
AT31.07.2013
FI31.07.2013
LT31.07.2013
PL31.07.2013
IS30.11.2013
PT02.12.2013
Former [2014/10]CY19.06.2013
AT31.07.2013
LT31.07.2013
IS30.11.2013
PT02.12.2013
Former [2014/09]AT31.07.2013
LT31.07.2013
PT02.12.2013
Former [2014/08]LT31.07.2013
PT02.12.2013
Cited inInternational search[XY]US2002187458  (DOLABDJIAN HAIG [DE], et al) [X] 1,3-6,16-18,22 * paragraphs [0005] - [0007] - [0011] , [0016]; claim 6 * [Y] 7-9,11,12,19-21;
 [A]EP1364625  (TECH D USINAGE SINLAB INC [CA]) [A] 7-9,11* paragraphs [0033] - [0040]; figure 15 *;
 [Y]US2004031780  (HAGEMEISTER FRANK [DE], et al) [Y] 12,19-21 * paragraph [0013]; figure 1; claim 5 *;
 [Y]DE10300301  (SIRONA DENTAL SYSTEMS GMBH [DE]) [Y] 11 * paragraphs [0008] , [0010] , [0018] , [0045] , [0062] - [0064]; figures 1,4-6a *;
 [Y]US2004158342  (WOLF DIETRICH [DE], et al) [Y] 7-9 * paragraphs [0045] - [0047]; figure 1 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.