EP1988631 - METHOD AND CIRCUIT OF THE ELECTRONIC HORN DRIVING SIGNAL FREQUENCY ADJUSTED BY CAPACITANCE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 13.08.2021 Database last updated on 20.12.2024 | |
Former | The patent has been granted Status updated on 04.09.2020 | ||
Former | Grant of patent is intended Status updated on 24.10.2019 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Wan, Yu No. 173, Ganshui Road Haerbin Heilongilang 150090 / CN | [2020/41] |
Former [2008/45] | For all designated states Wan, Yu No. 173, Ganshui Road Haerbin, Heilongilang 150090 / CN | Inventor(s) | 01 /
see applicant ... | [2008/45] | Representative(s) | Schmidt, Steffen Boehmert & Boehmert Anwaltspartnerschaft mbB Pettenkoferstrasse 22 80336 München / DE | [2020/41] |
Former [2008/45] | Grünecker, Kinkeldey, Stockmair & Schwanhäusser Anwaltssozietät Leopoldstraße 4 80802 München / DE | Application number, filing date | 06705638.2 | 13.02.2006 | [2008/45] | WO2006CN00217 | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2007093076 | Date: | 23.08.2007 | Language: | ZH | [2007/34] | Type: | A1 Application with search report | No.: | EP1988631 | Date: | 05.11.2008 | Language: | EN | [2008/45] | Type: | B1 Patent specification | No.: | EP1988631 | Date: | 07.10.2020 | Language: | EN | [2020/41] | Search report(s) | International search report - published on: | CN | 23.08.2007 | (Supplementary) European search report - dispatched on: | EP | 25.11.2010 | Classification | IPC: | H03J3/20, G10K9/12, B60Q5/00, G10K9/18 | [2010/52] | CPC: |
H03J3/20 (EP,KR,US);
H04R1/30 (KR);
B06B1/0253 (EP,US);
B60Q5/00 (KR);
H03F3/2171 (EP,US);
H03F2200/03 (EP,US);
|
Former IPC [2008/45] | H03J3/20 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR [2020/41] |
Former [2008/45] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR | Extension states | AL | Not yet paid | BA | Not yet paid | HR | Not yet paid | MK | Not yet paid | YU | Not yet paid | Title | German: | VERFAHREN UND SCHALTUNG EINER DURCH KAPAZITÄT EINGESTELLTEN ANSTEUERSIGNALFREQUENZ EINER ELEKTRONISCHEN HUPE | [2008/45] | English: | METHOD AND CIRCUIT OF THE ELECTRONIC HORN DRIVING SIGNAL FREQUENCY ADJUSTED BY CAPACITANCE | [2008/45] | French: | PROCÉDÉ ET CIRCUIT DE COMMANDE DE LA FRÉQUENCE D'UN KLAXON ÉLECTRONIQUE PAR RÉGLAGE DE LA CAPACITANCE | [2008/45] | Entry into regional phase | 30.07.2008 | Translation filed | 30.07.2008 | National basic fee paid | 30.07.2008 | Search fee paid | 30.07.2008 | Designation fee(s) paid | 30.07.2008 | Examination fee paid | Examination procedure | 13.04.2007 | Request for preliminary examination filed International Preliminary Examining Authority: CN | 30.07.2008 | Examination requested [2008/45] | 05.05.2011 | Amendment by applicant (claims and/or description) | 08.08.2013 | Despatch of a communication from the examining division (Time limit: M04) | 28.11.2013 | Reply to a communication from the examining division | 03.10.2017 | Date of oral proceedings | 12.10.2017 | Despatch of communication that the application is refused, reason: substantive examination {1} | 12.10.2017 | Minutes of oral proceedings despatched | 08.10.2019 | Cancellation of oral proceeding that was planned for 06.11.2019 | 25.10.2019 | Communication of intention to grant the patent | 06.11.2019 | Date of oral proceedings (cancelled) | 04.03.2020 | Fee for grant paid | 04.03.2020 | Fee for publishing/printing paid | 04.03.2020 | Receipt of the translation of the claim(s) | Appeal following examination | 21.12.2017 | Appeal received No. T0691/18 | 22.02.2018 | Statement of grounds filed | 01.08.2018 | Invitation to file observations in an appeal (Time limit: M02) [2018/31] | 26.02.2019 | Result of appeal procedure: continuation of examination procedure | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 08.08.2013 | Opposition(s) | 08.07.2021 | No opposition filed within time limit [2021/37] | Fees paid | Renewal fee | 30.07.2008 | Renewal fee patent year 03 | 26.02.2009 | Renewal fee patent year 04 | 26.02.2010 | Renewal fee patent year 05 | 25.02.2011 | Renewal fee patent year 06 | 28.02.2012 | Renewal fee patent year 07 | 26.02.2013 | Renewal fee patent year 08 | 26.02.2014 | Renewal fee patent year 09 | 25.02.2015 | Renewal fee patent year 10 | 25.02.2016 | Renewal fee patent year 11 | 24.02.2017 | Renewal fee patent year 12 | 06.03.2018 | Renewal fee patent year 13 | 13.02.2019 | Renewal fee patent year 14 | 28.08.2020 | Renewal fee patent year 15 | Penalty fee | Additional fee for renewal fee | 28.02.2018 | 13   M06   Fee paid on   06.03.2018 | 29.02.2020 | 15   M06   Fee paid on   28.08.2020 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 13.02.2006 | AT | 07.10.2020 | CY | 07.10.2020 | CZ | 07.10.2020 | DK | 07.10.2020 | EE | 07.10.2020 | ES | 07.10.2020 | FI | 07.10.2020 | IT | 07.10.2020 | LT | 07.10.2020 | LV | 07.10.2020 | MC | 07.10.2020 | NL | 07.10.2020 | PL | 07.10.2020 | RO | 07.10.2020 | SE | 07.10.2020 | SI | 07.10.2020 | SK | 07.10.2020 | TR | 07.10.2020 | BG | 07.01.2021 | GR | 08.01.2021 | IS | 07.02.2021 | PT | 08.02.2021 | GB | 13.02.2021 | IE | 13.02.2021 | LU | 13.02.2021 | BE | 28.02.2021 | CH | 28.02.2021 | FR | 28.02.2021 | LI | 28.02.2021 | [2024/29] |
Former [2023/27] | HU | 13.02.2006 | |
AT | 07.10.2020 | ||
CY | 07.10.2020 | ||
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
IT | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
SE | 07.10.2020 | ||
SI | 07.10.2020 | ||
SK | 07.10.2020 | ||
BG | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
GB | 13.02.2021 | ||
IE | 13.02.2021 | ||
LU | 13.02.2021 | ||
BE | 28.02.2021 | ||
CH | 28.02.2021 | ||
FR | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2023/24] | AT | 07.10.2020 | |
CY | 07.10.2020 | ||
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
IT | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
SE | 07.10.2020 | ||
SI | 07.10.2020 | ||
SK | 07.10.2020 | ||
BG | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
GB | 13.02.2021 | ||
IE | 13.02.2021 | ||
LU | 13.02.2021 | ||
BE | 28.02.2021 | ||
CH | 28.02.2021 | ||
FR | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2022/34] | AT | 07.10.2020 | |
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
IT | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
SE | 07.10.2020 | ||
SI | 07.10.2020 | ||
SK | 07.10.2020 | ||
BG | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
GB | 13.02.2021 | ||
IE | 13.02.2021 | ||
LU | 13.02.2021 | ||
BE | 28.02.2021 | ||
CH | 28.02.2021 | ||
FR | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2022/23] | AT | 07.10.2020 | |
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
IT | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
SE | 07.10.2020 | ||
SI | 07.10.2020 | ||
SK | 07.10.2020 | ||
BG | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
GB | 13.02.2021 | ||
IE | 13.02.2021 | ||
LU | 13.02.2021 | ||
CH | 28.02.2021 | ||
FR | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2022/10] | AT | 07.10.2020 | |
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
IT | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
SE | 07.10.2020 | ||
SI | 07.10.2020 | ||
SK | 07.10.2020 | ||
BG | 07.01.2021 | ||
GR | 08.01.2021 | ||
PT | 08.02.2021 | ||
GB | 13.02.2021 | ||
IE | 13.02.2021 | ||
LU | 13.02.2021 | ||
CH | 28.02.2021 | ||
FR | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2022/08] | AT | 07.10.2020 | |
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
IT | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
SE | 07.10.2020 | ||
SI | 07.10.2020 | ||
SK | 07.10.2020 | ||
BG | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
GB | 13.02.2021 | ||
IE | 13.02.2021 | ||
LU | 13.02.2021 | ||
CH | 28.02.2021 | ||
FR | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2022/07] | AT | 07.10.2020 | |
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
IT | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
SE | 07.10.2020 | ||
SI | 07.10.2020 | ||
SK | 07.10.2020 | ||
BG | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
IE | 13.02.2021 | ||
LU | 13.02.2021 | ||
CH | 28.02.2021 | ||
FR | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2021/50] | AT | 07.10.2020 | |
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
IT | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
SE | 07.10.2020 | ||
SI | 07.10.2020 | ||
SK | 07.10.2020 | ||
BG | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
LU | 13.02.2021 | ||
CH | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2021/48] | AT | 07.10.2020 | |
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
IT | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
SE | 07.10.2020 | ||
SK | 07.10.2020 | ||
BG | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
LU | 13.02.2021 | ||
CH | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2021/47] | AT | 07.10.2020 | |
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
SE | 07.10.2020 | ||
SK | 07.10.2020 | ||
BG | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
LU | 13.02.2021 | ||
CH | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2021/41] | AT | 07.10.2020 | |
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
SE | 07.10.2020 | ||
SK | 07.10.2020 | ||
BG | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/37] | AT | 07.10.2020 | |
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
SE | 07.10.2020 | ||
SK | 07.10.2020 | ||
BG | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/36] | AT | 07.10.2020 | |
CZ | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
SE | 07.10.2020 | ||
SK | 07.10.2020 | ||
BG | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/35] | AT | 07.10.2020 | |
CZ | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
SE | 07.10.2020 | ||
SK | 07.10.2020 | ||
BG | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/34] | AT | 07.10.2020 | |
CZ | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
SE | 07.10.2020 | ||
BG | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/33] | AT | 07.10.2020 | |
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
SE | 07.10.2020 | ||
BG | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/25] | AT | 07.10.2020 | |
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
LV | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
SE | 07.10.2020 | ||
BG | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/24] | AT | 07.10.2020 | |
FI | 07.10.2020 | ||
LV | 07.10.2020 | ||
NL | 07.10.2020 | ||
SE | 07.10.2020 | ||
BG | 07.01.2021 | ||
GR | 08.01.2021 | ||
PT | 08.02.2021 | ||
Former [2021/23] | FI | 07.10.2020 | |
LV | 07.10.2020 | ||
NL | 07.10.2020 | ||
SE | 07.10.2020 | ||
GR | 08.01.2021 | ||
PT | 08.02.2021 | ||
Former [2021/21] | FI | 07.10.2020 | |
NL | 07.10.2020 | ||
PT | 08.02.2021 | ||
Former [2021/20] | FI | 07.10.2020 | Documents cited: | Search | [XI]JPH01146449 (MATSUSHITA ELECTRIC IND CO LTD) [X] 1,3,17,19,23 * the whole document * [I] 2,4-16,18,20-22; | [I]US5263197 (MANJO YOSHIHARU [US], et al) [I] 1-23 * figure 2 *; | [A]DE19802829 (EATON CORP [US]) [A] 1-23 * figures 1,2,4a,4b * | International search | [X]CN2204062Y (CHEN GANG [CN]); | [Y]CN1152159 (JIANG HUADONG [CN]) | Examination | US4384361 | - C E Pykett, "A COMPENDIUM OF ELECTRONIC ORGAN TECHNOLOGY Volume 1: Analogue Organs", (20030131), URL: http://www.pykett.org.uk/Compendium pt 1 v1.5.pdf, (20170921), XP055408595 | by applicant | US4384361 |