blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1856802

EP1856802 - EDGE RATE CONTROL FOR I2C BUS APPLICATIONS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  21.05.2010
Database last updated on 27.07.2024
Most recent event   Tooltip19.10.2012Lapse of the patent in a contracting state
New state(s): TR
published on 21.11.2012  [2012/47]
Applicant(s)For all designated states
NXP B.V.
High Tech Campus 60
5656 AG Eindhoven / NL
[2009/50]
Former [2009/14]For all designated states
NXP B.V.
High Tech Campus 60
5656 AG Eindhoven / NL
Former [2007/47]For all designated states
Koninklijke Philips Electronics N.V.
Groenewoudseweg 1
5621 BA Eindhoven / NL
Inventor(s)01 / ANDERSON, Alma
1109 McKay Drive, M/S-41SJ
San Jose, CA 95131-1706 / US
02 / RUTKOWSKI, Joseph
1109 McKay Drive, M/S-41SJ
San Jose, CA 95131-1706 / US
03 / OEHLER, Dave
1109 McKay Drive, M/S-41SJ
San Jose, CA 95131-1706 / US
 [2007/47]
Representative(s)Schouten, Marcus Maria, et al
NXP B.V.
Intellectual Property & Licensing
High Tech Campus 60
5656 AG Eindhoven / NL
[N/P]
Former [2009/42]Schouten, Marcus Maria, et al
NXP B.V. IP & L Department High Tech Campus 32
5656 AE Eindhoven / NL
Former [2009/28]Röggla, Harald
NXP Semiconductors Austria GmbH Intellectual Property Department Gutheil-Schoder-Gasse 8-12
1102 Vienna / AT
Former [2008/28]Röggla, Harald
NXP Semiconductors Intellectual Property Department Gutheil-Schoder-Gasse 8-12
1102 Vienna / AT
Former [2007/47]Röggla, Harald
NXP Semiconductors Austria GmbH IP Department Gutheil-Schoder-Gasse 8-12
1101 Vienna / AT
Application number, filing date06710969.424.02.2006
[2007/47]
WO2006IB50596
Priority number, dateUS20050656736P25.02.2005         Original published format: US 656736 P
US20050686843P01.06.2005         Original published format: US 686843 P
[2007/47]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2006090344
Date:31.08.2006
Language:EN
[2006/35]
Type: A1 Application with search report 
No.:EP1856802
Date:21.11.2007
Language:EN
The application published by WIPO in one of the EPO official languages on 31.08.2006 takes the place of the publication of the European patent application.
[2007/47]
Type: B1 Patent specification 
No.:EP1856802
Date:15.07.2009
Language:EN
[2009/29]
Search report(s)International search report - published on:EP31.08.2006
ClassificationIPC:H03K17/16
[2007/47]
CPC:
H03K17/166 (EP,US)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2007/47]
Extension statesAL25.09.2007
BA25.09.2007
HR25.09.2007
MK25.09.2007
YU25.09.2007
TitleGerman:FLANKENSTEILHEITSSTEUERUNG FÜR I2C-BUS-ANWENDUNGEN[2009/02]
English:EDGE RATE CONTROL FOR I2C BUS APPLICATIONS[2007/47]
French:REGULATION DE LA PENTE DU FLANC POUR APPLICATION AUX BUS I2C[2009/02]
Former [2007/47]ÄTZRATENSTEUERUNG FÜR I2C-BUS-ANWENDUNGEN
Former [2007/47]REGULATION DE DEBIT EN LIMITE POUR APPLICATION DE BUS I2C
Entry into regional phase25.09.2007National basic fee paid 
25.09.2007Designation fee(s) paid 
25.09.2007Examination fee paid 
Examination procedure25.09.2007Examination requested  [2007/47]
19.12.2007Despatch of a communication from the examining division (Time limit: M04)
05.06.2008Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time
29.07.2008Reply to a communication from the examining division
05.01.2009Communication of intention to grant the patent
06.05.2009Fee for grant paid
06.05.2009Fee for publishing/printing paid
Opposition(s)16.04.2010No opposition filed within time limit [2010/25]
Request for further processing for:The application is deemed to be withdrawn due to failure to reply to the examination report
29.07.2008Request for further processing filed
29.07.2008Full payment received (date of receipt of payment)
Fees paidRenewal fee
29.02.2008Renewal fee patent year 03
02.03.2009Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT15.07.2009
BE15.07.2009
CY15.07.2009
CZ15.07.2009
DK15.07.2009
EE15.07.2009
FI15.07.2009
IT15.07.2009
LT15.07.2009
LV15.07.2009
NL15.07.2009
PL15.07.2009
RO15.07.2009
SE15.07.2009
SI15.07.2009
SK15.07.2009
TR15.07.2009
BG15.10.2009
GR16.10.2009
ES26.10.2009
IS15.11.2009
PT15.11.2009
HU16.01.2010
IE24.02.2010
LU24.02.2010
CH28.02.2010
LI28.02.2010
MC01.03.2010
[2012/47]
Former [2012/43]AT15.07.2009
BE15.07.2009
CY15.07.2009
CZ15.07.2009
DK15.07.2009
EE15.07.2009
FI15.07.2009
IT15.07.2009
LT15.07.2009
LV15.07.2009
NL15.07.2009
PL15.07.2009
RO15.07.2009
SE15.07.2009
SI15.07.2009
SK15.07.2009
BG15.10.2009
GR16.10.2009
ES26.10.2009
IS15.11.2009
PT15.11.2009
HU16.01.2010
IE24.02.2010
LU24.02.2010
CH28.02.2010
LI28.02.2010
MC01.03.2010
Former [2012/42]AT15.07.2009
BE15.07.2009
CY15.07.2009
CZ15.07.2009
DK15.07.2009
EE15.07.2009
FI15.07.2009
IT15.07.2009
LT15.07.2009
LV15.07.2009
NL15.07.2009
PL15.07.2009
RO15.07.2009
SE15.07.2009
SI15.07.2009
SK15.07.2009
BG15.10.2009
GR16.10.2009
ES26.10.2009
IS15.11.2009
PT15.11.2009
HU16.01.2010
IE24.02.2010
CH28.02.2010
LI28.02.2010
MC01.03.2010
Former [2012/37]AT15.07.2009
BE15.07.2009
CY15.07.2009
CZ15.07.2009
DK15.07.2009
EE15.07.2009
FI15.07.2009
IT15.07.2009
LT15.07.2009
LV15.07.2009
NL15.07.2009
PL15.07.2009
RO15.07.2009
SE15.07.2009
SI15.07.2009
SK15.07.2009
BG15.10.2009
GR16.10.2009
ES26.10.2009
IS15.11.2009
PT15.11.2009
IE24.02.2010
CH28.02.2010
LI28.02.2010
MC01.03.2010
Former [2011/17]AT15.07.2009
BE15.07.2009
CZ15.07.2009
DK15.07.2009
EE15.07.2009
FI15.07.2009
IT15.07.2009
LT15.07.2009
LV15.07.2009
NL15.07.2009
PL15.07.2009
RO15.07.2009
SE15.07.2009
SI15.07.2009
SK15.07.2009
BG15.10.2009
GR16.10.2009
ES26.10.2009
IS15.11.2009
PT15.11.2009
IE24.02.2010
CH28.02.2010
LI28.02.2010
MC01.03.2010
Former [2011/09]AT15.07.2009
BE15.07.2009
CZ15.07.2009
DK15.07.2009
EE15.07.2009
FI15.07.2009
LT15.07.2009
LV15.07.2009
NL15.07.2009
PL15.07.2009
RO15.07.2009
SE15.07.2009
SI15.07.2009
SK15.07.2009
BG15.10.2009
GR16.10.2009
ES26.10.2009
IS15.11.2009
PT15.11.2009
IE24.02.2010
CH28.02.2010
LI28.02.2010
MC01.03.2010
Former [2011/04]AT15.07.2009
BE15.07.2009
CZ15.07.2009
DK15.07.2009
EE15.07.2009
FI15.07.2009
LT15.07.2009
LV15.07.2009
NL15.07.2009
PL15.07.2009
RO15.07.2009
SE15.07.2009
SI15.07.2009
SK15.07.2009
BG15.10.2009
GR16.10.2009
ES26.10.2009
IS15.11.2009
PT15.11.2009
CH28.02.2010
LI28.02.2010
MC01.03.2010
Former [2010/26]AT15.07.2009
BE15.07.2009
CZ15.07.2009
DK15.07.2009
EE15.07.2009
FI15.07.2009
LT15.07.2009
LV15.07.2009
NL15.07.2009
PL15.07.2009
RO15.07.2009
SE15.07.2009
SI15.07.2009
SK15.07.2009
BG15.10.2009
ES26.10.2009
IS15.11.2009
PT15.11.2009
Former [2010/20]AT15.07.2009
DK15.07.2009
EE15.07.2009
FI15.07.2009
LT15.07.2009
LV15.07.2009
NL15.07.2009
PL15.07.2009
SE15.07.2009
SI15.07.2009
BG15.10.2009
ES26.10.2009
IS15.11.2009
PT15.11.2009
Former [2010/17]AT15.07.2009
FI15.07.2009
LT15.07.2009
LV15.07.2009
NL15.07.2009
PL15.07.2009
SE15.07.2009
SI15.07.2009
BG15.10.2009
ES26.10.2009
IS15.11.2009
PT15.11.2009
Former [2010/16]AT15.07.2009
FI15.07.2009
LT15.07.2009
LV15.07.2009
NL15.07.2009
PL15.07.2009
SE15.07.2009
SI15.07.2009
ES26.10.2009
IS15.11.2009
PT15.11.2009
Former [2010/14]AT15.07.2009
FI15.07.2009
LT15.07.2009
LV15.07.2009
NL15.07.2009
PL15.07.2009
SE15.07.2009
SI15.07.2009
ES26.10.2009
IS15.11.2009
Cited inInternational search[XA]US5559502  (SCHUTTE HERMAN [NL]) [X] 1-6,14-16 * column 5, lines 13-43; figure 9 * [A] 17;
 [XA]US2003107909  (NAKAMURA HIROTSUGU [JP]) [X] 1-6,14-16 * paragraphs [0029] - [0031]; figure 2 * * paragraph [0045]; figure 6 * [A] 17;
 [A]EP0368524  (NCR CO [US]) [A] 1,15,17 * column 2, line 46 - column 3, line 47; figure 1 *;
 [A]EP0596475  (TEXAS INSTRUMENTS DEUTSCHLAND [DE]) [A] 1,15,17 * column 3, line 51 - column 4, line 54; figures 1,2 *
by applicantUS5559502
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.