blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2006362

EP2006362 - PROCESS FOR PRODUCING GAS HYDRATE PELLET [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  08.08.2014
Database last updated on 15.08.2024
Most recent event   Tooltip08.08.2014Application deemed to be withdrawnpublished on 10.09.2014  [2014/37]
Applicant(s)For all designated states
Mitsui Engineering and Shipbuilding Co, Ltd.
6-4 Tsukiji 5-chome, Chuo-ku
Tokyo 104-8439 / JP
[2008/52]
Inventor(s)01 / KATOH, Yuichi
MITSUI ENGIN.&SHIPBUILDING CO., LTD. Chiba Works, 1, Yawatakaigandori
Ichihara-shi, Chiba 290-8601 / JP
02 / HORIGUCHI, Kiyoshi
MITSUI ENGIN.&SHIPBUILDING CO., LTD. Chiba Works, 1, Yawatakaigandori
Ichihara-shi, Chiba 290-8601 / JP
03 / IWASAKI, Toru
MITSUI ENGIN.&SHIPBUILDING CO., LTD. Chiba Works, 1, Yawatakaigandori
Ichihara-shi, Chiba 290-8601 / JP
04 / NAGAMORI, Shigeru
MITSUI ENGIN.&SHIPBUILDING CO., LTD. Chiba Works, 1, Yawatakaigandori
Ichihara-shi, Chiba 290-8601 / JP
 [2008/52]
Representative(s)WSL Patentanwälte Partnerschaft mbB
Kaiser-Friedrich-Ring 98
65185 Wiesbaden / DE
[2014/09]
Former [2008/52]Köppen, Manfred, et al
Weber Seiffert Lieke, Patentanwälte, Taunusstrasse 5a
65183 Wiesbaden / DE
Application number, filing date06730694.430.03.2006
[2008/52]
WO2006JP306746
Filing languageJA
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2007116456
Date:18.10.2007
Language:JA
[2007/42]
Type: A1 Application with search report 
No.:EP2006362
Date:24.12.2008
Language:EN
[2008/52]
Search report(s)International search report - published on:JP18.10.2007
(Supplementary) European search report - dispatched on:EP11.10.2010
ClassificationIPC:C10L3/10
[2013/07]
CPC:
C10L3/06 (EP,US); C10L3/108 (EP,US); C10L5/00 (EP,US);
C10L5/363 (EP,US)
Former IPC [2008/52]C10L3/06
Designated contracting statesDE,   DK,   FR,   GB,   NL [2009/19]
Former [2008/52]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  NL,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
TitleGerman:VERFAHREN ZUR HERSTELLUNG VON GASHYDRATPELLET[2008/52]
English:PROCESS FOR PRODUCING GAS HYDRATE PELLET[2008/52]
French:PROCEDE DE PRODUCTION DE PASTILLE D'HYDRATE DE GAZ[2008/52]
Entry into regional phase09.10.2008Translation filed 
09.10.2008National basic fee paid 
09.10.2008Search fee paid 
09.10.2008Designation fee(s) paid 
09.10.2008Examination fee paid 
Examination procedure09.10.2008Examination requested  [2008/52]
31.10.2008Loss of particular rights, legal effect: designated state(s)
10.12.2008Despatch of communication of loss of particular rights: designated state(s) AT, BE, BG, CH, CY, CZ, EE, ES, FI, GR, HU, IE, IS, IT, LT, LU, LV, MC, PL, PT, RO, SE, SI, SK, TR
03.05.2011Amendment by applicant (claims and/or description)
20.06.2011Despatch of a communication from the examining division (Time limit: M04)
10.10.2011Reply to a communication from the examining division
25.11.2011Despatch of a communication from the examining division (Time limit: M04)
28.03.2012Reply to a communication from the examining division
05.07.2012Despatch of a communication from the examining division (Time limit: M04)
29.10.2012Reply to a communication from the examining division
04.06.2013Communication of intention to grant the patent
25.07.2013Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
08.10.2013Communication of intention to grant the patent
19.02.2014Application deemed to be withdrawn, date of legal effect  [2014/37]
31.03.2014Despatch of communication that the application is deemed to be withdrawn, reason: fee for grant / fee for printing not paid in time  [2014/37]
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  20.06.2011
Fees paidRenewal fee
16.10.2008Renewal fee patent year 03
21.03.2009Renewal fee patent year 04
24.03.2010Renewal fee patent year 05
19.03.2011Renewal fee patent year 06
22.03.2012Renewal fee patent year 07
18.03.2013Renewal fee patent year 08
Penalty fee
Additional fee for renewal fee
31.03.201409   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[XI]EP1375630  (MITSUBISHI HEAVY IND LTD [JP]) [X] 1 * paragraph [0008] - paragraph [0015]; figures 1,3; claims 1-4 * * paragraph [0080] - paragraph [0087] * [I] 2-4;
 [A]US2004020123  (KIMURA TAKAHIRO [JP], et al) [A] 1-4 * paragraph [0038] - paragraph [0070]; figures 1,2 ** paragraph [0080] - paragraph [0087] *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.