blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1897040

EP1897040 - ANALYSIS OF MULTIPLE ASSETS IN VIEW OF UNCERTAINTIES [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  28.10.2016
Database last updated on 20.11.2024
Most recent event   Tooltip17.08.2018Lapse of the patent in a contracting state
New state(s): BG
published on 19.09.2018  [2018/38]
Applicant(s)For all designated states
Landmark Graphics Corporation
10200 Bellaire Boulevard
Houston, Texas 77072 / US
[2015/49]
Former [2015/43]For all designated states
LANDMARK GRAPHICS CORPORATION
10200 Bellaire Boulevard
Houston, TX 77072 / US
Former [2008/11]For all designated states
LANDMARK GRAPHICS CORPORATION
2101 City West Boulevard, Building 1, Room 200
Houston, TX 77042-3021 / US
Inventor(s)01 / NARAYANAN, Keshav
1644 Lakeside Enclave Drive
Houston, Texas 77077 / US
02 / HEATH, David, E.
9691 Beacon Hill Court
Highlands Ranch, Colorado 80126 / US
03 / CULLICK, Alvin, Stanley
5736 Longmont
Houston, Texas 77057 / US
 [2008/11]
Representative(s)Hoffmann Eitle
Patent- und Rechtsanwälte PartmbB
Arabellastraße 30
81925 München / DE
[2015/52]
Former [2008/11]Heselberger, Johannes
Patent- und Rechtsanwälte Bardehle . Pagenberg . Dost . Altenburg . Geissler Postfach 86 06 20
81633 München / DE
Application number, filing date06751928.001.05.2006
[2008/11]
WO2006US16476
Priority number, dateUS20050676484P29.04.2005         Original published format: US 676484 P
US2005020381515.08.2005         Original published format: US 203815
US2005021573730.08.2005         Original published format: US 215737
[2008/11]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2006119119
Date:09.11.2006
Language:EN
[2006/45]
Type: A1 Application with search report 
No.:EP1897040
Date:12.03.2008
Language:EN
The application published by WIPO in one of the EPO official languages on 09.11.2006 takes the place of the publication of the European patent application.
[2008/11]
Type: B1 Patent specification 
No.:EP1897040
Date:23.12.2015
Language:EN
[2015/52]
Search report(s)International search report - published on:EP09.11.2006
ClassificationIPC:G06N5/00
[2008/11]
CPC:
G06N20/00 (EP,NO); G06N5/02 (EP,NO,US)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2015/52]
Former [2008/11]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  NL,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
TitleGerman:ANALYSE MEHRERER INSTRUMENTE IM HINBLICK AUF UNBESTIMMTHEITEN[2008/11]
English:ANALYSIS OF MULTIPLE ASSETS IN VIEW OF UNCERTAINTIES[2008/11]
French:ANALYSE DE MULTIPLES ACTIFS EN VUE D'INCERTITUDES[2008/11]
Entry into regional phase29.11.2007National basic fee paid 
29.11.2007Designation fee(s) paid 
29.11.2007Examination fee paid 
Examination procedure29.11.2007Examination requested  [2008/11]
23.06.2009Despatch of a communication from the examining division (Time limit: M06)
23.02.2010Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time
03.05.2010Reply to a communication from the examining division
14.12.2011Date of oral proceedings
30.12.2011Despatch of communication that the application is refused, reason: substantive examination {1}
30.12.2011Minutes of oral proceedings despatched
21.07.2014Despatch of a communication from the examining division (Time limit: M04)
01.12.2014Reply to a communication from the examining division
24.03.2015Despatch of a communication from the examining division (Time limit: M02)
18.05.2015Reply to a communication from the examining division
30.06.2015Communication of intention to grant the patent
22.10.2015Fee for grant paid
22.10.2015Fee for publishing/printing paid
22.10.2015Receipt of the translation of the claim(s)
Appeal following examination07.03.2012Appeal received No.  T1205/12
09.05.2012Statement of grounds filed
14.12.2012Result of appeal procedure: continuation of examination procedure
Divisional application(s)EP15202095.4  / EP3040914
The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  23.06.2009
Opposition(s)26.09.2016No opposition filed within time limit [2016/48]
Request for further processing for:The application is deemed to be withdrawn due to failure to reply to the examination report
03.05.2010Request for further processing filed
03.05.2010Full payment received (date of receipt of payment)
Request granted
09.07.2010Decision despatched
Fees paidRenewal fee
18.03.2008Renewal fee patent year 03
07.05.2009Renewal fee patent year 04
31.03.2010Renewal fee patent year 05
10.05.2011Renewal fee patent year 06
21.03.2012Renewal fee patent year 07
26.03.2013Renewal fee patent year 08
26.03.2014Renewal fee patent year 09
07.05.2015Renewal fee patent year 10
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU01.05.2006
AT23.12.2015
BE23.12.2015
BG23.12.2015
CY23.12.2015
CZ23.12.2015
DK23.12.2015
EE23.12.2015
ES23.12.2015
FI23.12.2015
IT23.12.2015
LT23.12.2015
LV23.12.2015
MC23.12.2015
NL23.12.2015
PL23.12.2015
RO23.12.2015
SE23.12.2015
SI23.12.2015
SK23.12.2015
TR23.12.2015
GR24.03.2016
IS23.04.2016
PT26.04.2016
IE01.05.2016
LU01.05.2016
CH31.05.2016
LI31.05.2016
[2018/38]
Former [2018/29]HU01.05.2006
AT23.12.2015
BE23.12.2015
CY23.12.2015
CZ23.12.2015
DK23.12.2015
EE23.12.2015
ES23.12.2015
FI23.12.2015
IT23.12.2015
LT23.12.2015
LV23.12.2015
MC23.12.2015
NL23.12.2015
PL23.12.2015
RO23.12.2015
SE23.12.2015
SI23.12.2015
SK23.12.2015
TR23.12.2015
GR24.03.2016
IS23.04.2016
PT26.04.2016
IE01.05.2016
LU01.05.2016
CH31.05.2016
LI31.05.2016
Former [2018/28]HU01.05.2006
AT23.12.2015
BE23.12.2015
CY23.12.2015
CZ23.12.2015
DK23.12.2015
EE23.12.2015
ES23.12.2015
FI23.12.2015
IT23.12.2015
LT23.12.2015
LV23.12.2015
MC23.12.2015
NL23.12.2015
PL23.12.2015
RO23.12.2015
SE23.12.2015
SI23.12.2015
SK23.12.2015
GR24.03.2016
IS23.04.2016
PT26.04.2016
IE01.05.2016
LU01.05.2016
CH31.05.2016
LI31.05.2016
Former [2017/38]AT23.12.2015
BE23.12.2015
CZ23.12.2015
DK23.12.2015
EE23.12.2015
ES23.12.2015
FI23.12.2015
IT23.12.2015
LT23.12.2015
LV23.12.2015
NL23.12.2015
PL23.12.2015
RO23.12.2015
SE23.12.2015
SI23.12.2015
SK23.12.2015
GR24.03.2016
IS23.04.2016
PT26.04.2016
IE01.05.2016
LU01.05.2016
CH31.05.2016
LI31.05.2016
Former [2017/13]AT23.12.2015
BE23.12.2015
CZ23.12.2015
DK23.12.2015
EE23.12.2015
ES23.12.2015
FI23.12.2015
IT23.12.2015
LT23.12.2015
LV23.12.2015
NL23.12.2015
PL23.12.2015
RO23.12.2015
SE23.12.2015
SI23.12.2015
SK23.12.2015
GR24.03.2016
IS23.04.2016
PT26.04.2016
LU01.05.2016
CH31.05.2016
LI31.05.2016
Former [2017/07]AT23.12.2015
BE23.12.2015
CZ23.12.2015
DK23.12.2015
EE23.12.2015
ES23.12.2015
FI23.12.2015
IT23.12.2015
LT23.12.2015
LV23.12.2015
NL23.12.2015
PL23.12.2015
RO23.12.2015
SE23.12.2015
SK23.12.2015
GR24.03.2016
IS23.04.2016
PT26.04.2016
LU01.05.2016
CH31.05.2016
LI31.05.2016
Former [2017/04]AT23.12.2015
BE23.12.2015
CZ23.12.2015
DK23.12.2015
EE23.12.2015
ES23.12.2015
FI23.12.2015
IT23.12.2015
LT23.12.2015
LV23.12.2015
NL23.12.2015
PL23.12.2015
RO23.12.2015
SE23.12.2015
SK23.12.2015
GR24.03.2016
IS23.04.2016
PT26.04.2016
LU01.05.2016
Former [2017/03]AT23.12.2015
BE23.12.2015
CZ23.12.2015
DK23.12.2015
EE23.12.2015
ES23.12.2015
FI23.12.2015
IT23.12.2015
LT23.12.2015
LV23.12.2015
NL23.12.2015
PL23.12.2015
RO23.12.2015
SE23.12.2015
SK23.12.2015
GR24.03.2016
IS23.04.2016
PT26.04.2016
Former [2016/46]AT23.12.2015
CZ23.12.2015
DK23.12.2015
EE23.12.2015
ES23.12.2015
FI23.12.2015
IT23.12.2015
LT23.12.2015
LV23.12.2015
NL23.12.2015
PL23.12.2015
RO23.12.2015
SE23.12.2015
SK23.12.2015
GR24.03.2016
IS23.04.2016
PT26.04.2016
BE31.05.2016
Former [2016/38]AT23.12.2015
CZ23.12.2015
EE23.12.2015
ES23.12.2015
FI23.12.2015
IT23.12.2015
LT23.12.2015
LV23.12.2015
NL23.12.2015
PL23.12.2015
RO23.12.2015
SE23.12.2015
SK23.12.2015
GR24.03.2016
IS23.04.2016
PT26.04.2016
BE31.05.2016
Former [2016/36]AT23.12.2015
CZ23.12.2015
EE23.12.2015
ES23.12.2015
FI23.12.2015
IT23.12.2015
LT23.12.2015
LV23.12.2015
NL23.12.2015
PL23.12.2015
RO23.12.2015
SE23.12.2015
SK23.12.2015
GR24.03.2016
BE31.05.2016
Former [2016/35]CZ23.12.2015
ES23.12.2015
FI23.12.2015
LT23.12.2015
LV23.12.2015
NL23.12.2015
SE23.12.2015
GR24.03.2016
Former [2016/34]CZ23.12.2015
FI23.12.2015
LT23.12.2015
LV23.12.2015
NL23.12.2015
SE23.12.2015
GR24.03.2016
Former [2016/26]FI23.12.2015
LT23.12.2015
LV23.12.2015
NL23.12.2015
SE23.12.2015
GR24.03.2016
Former [2016/25]FI23.12.2015
LT23.12.2015
LV23.12.2015
SE23.12.2015
GR24.03.2016
Former [2016/24]FI23.12.2015
LT23.12.2015
SE23.12.2015
GR24.03.2016
Former [2016/20]LT23.12.2015
Cited inExaminationUS2004220790
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.