blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1903900

EP1903900 - SHOE SOLE AND METHOD FOR THE PRODUCTION THEREOF [Right-click to bookmark this link]
Former [2008/14]SOLE, LAST, SHOE TOP, SHOE, AND METHOD FOR THE PRODUCTION THEREOF
[2018/51]
StatusNo opposition filed within time limit
Status updated on  10.07.2020
Database last updated on 16.07.2024
FormerThe patent has been granted
Status updated on  07.06.2019
FormerGrant of patent is intended
Status updated on  10.12.2018
FormerExamination is in progress
Status updated on  10.03.2017
Most recent event   Tooltip02.06.2023Lapse of the patent in a contracting state
New state(s): IT
published on 05.07.2023  [2023/27]
Applicant(s)For all designated states
Junior, Volker
Erienstr. 4
82166 Gräfelfing / DE
[2019/28]
Former [2008/14]For all designated states
Junior, Volker
Erienstr. 4
82166 Gräfelfing / DE
Inventor(s)01 / LEVER-O'KEEFE, Greg@Beeches Farm, The Twist
Wigginton, Tring, Herts
HP23 6DU / GB
02 / DOWDING PRIOR, Trevor
28 Connaught Avenue
Loughton, Essex IG 10 4 DS / GB
 [2019/28]
Former [2008/14]01 / LEVER-O'KEEFE, Greg Beeches Farm, The Twist
Wigginton, Tring, Herts
HP23 6DU / GB
02 / DOWDING PRIOR, Trevor
28 Connaught Avenue
Loughton, Essex IG 10 4 DS / GB
Representative(s)Beetz & Partner mbB
Patentanwälte
Prinzregentenstraße 54
80538 München / DE
[N/P]
Former [2019/28]Beetz & Partner mbB
Patentanwälte
Steinsdorfstraße 10
80538 München / DE
Former [2008/14]Pfeiffer, Axel
Beetz & Partner Patentanwälte Steinsdorfstrasse 10
D-80538 München / DE
Application number, filing date06753778.722.05.2006
[2008/14]
WO2006EP04845
Priority number, dateDE2005102347320.05.2005         Original published format: DE102005023473
[2008/14]
Filing languageDE
Procedural languageDE
PublicationType: A2 Application without search report
No.:WO2006122832
Date:23.11.2006
Language:DE
[2006/47]
Type: A2 Application without search report 
No.:EP1903900
Date:02.04.2008
Language:DE
The application published by WIPO in one of the EPO official languages on 23.11.2006 takes the place of the publication of the European patent application.
[2008/14]
Type: B1 Patent specification 
No.:EP1903900
Date:10.07.2019
Language:DE
[2019/28]
Search report(s)International search report - published on:EP19.04.2007
ClassificationIPC:A43C15/16, B33Y80/00, B33Y10/00, B29C64/153, B29C64/10, A43B13/18, A43D1/02, A43B13/22
[2018/51]
CPC:
A43D1/025 (EP); A43B13/186 (EP); A43B13/188 (EP);
A43B13/223 (EP); A43C15/16 (EP); A43C15/161 (EP);
A43C15/162 (EP); B29C64/10 (EP); B29C64/153 (EP);
B33Y10/00 (EP); B33Y80/00 (EP); A43D2200/60 (EP) (-)
Former IPC [2008/14]A43D1/02, A43B13/18
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2019/28]
Former [2008/14]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  NL,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
TitleGerman:SCHUHSOHLE UND HERSTELLUNGSVERFAHREN DAFÜR[2018/51]
English:SHOE SOLE AND METHOD FOR THE PRODUCTION THEREOF[2018/51]
French:SEMELLE DE CHAUSSURE ET PROCÉDÉ DE PRODUCTION CORRESPONDANT[2018/51]
Former [2008/14]SOHLE, LEISTEN, OBERSCHUH, SCHUH UND HERSTELLUNGSVERFAHREN HIERFÜR
Former [2008/14]SOLE, LAST, SHOE TOP, SHOE, AND METHOD FOR THE PRODUCTION THEREOF
Former [2008/14]SEMELLE, FORME, PARTIE SUPERIEURE DE CHAUSSURE, CHAUSSURE ET PROCEDE DE PRODUCTION APPROPRIE
Entry into regional phase20.12.2007National basic fee paid 
20.12.2007Designation fee(s) paid 
20.12.2007Examination fee paid 
Examination procedure13.12.2007Amendment by applicant (claims and/or description)
20.12.2007Examination requested  [2008/14]
15.01.2014Despatch of a communication from the examining division (Time limit: M06)
25.07.2014Reply to a communication from the examining division
16.06.2015Despatch of a communication from the examining division (Time limit: M06)
22.01.2016Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time
01.04.2016Reply to a communication from the examining division
28.02.2017Despatch of a communication from the examining division (Time limit: M06)
11.09.2017Reply to a communication from the examining division
08.11.2018Cancellation of oral proceeding that was planned for 15.11.2018
15.11.2018Date of oral proceedings (cancelled)
11.12.2018Communication of intention to grant the patent
11.04.2019Fee for grant paid
11.04.2019Fee for publishing/printing paid
11.04.2019Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  15.01.2014
Opposition(s)03.06.2020No opposition filed within time limit [2020/33]
Request for further processing for:The application is deemed to be withdrawn due to failure to reply to the examination report
01.04.2016Request for further processing filed
01.04.2016Full payment received (date of receipt of payment)
Request granted
15.04.2016Decision despatched
Fees paidRenewal fee
02.06.2008Renewal fee patent year 03
02.06.2009Renewal fee patent year 04
31.05.2010Renewal fee patent year 05
31.05.2011Renewal fee patent year 06
31.05.2012Renewal fee patent year 07
31.05.2013Renewal fee patent year 08
02.06.2014Renewal fee patent year 09
01.06.2015Renewal fee patent year 10
31.05.2016Renewal fee patent year 11
31.05.2017Renewal fee patent year 12
01.06.2018Renewal fee patent year 13
31.05.2019Renewal fee patent year 14
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU22.05.2006
CY10.07.2019
CZ10.07.2019
DK10.07.2019
EE10.07.2019
ES10.07.2019
FI10.07.2019
LT10.07.2019
LV10.07.2019
MC10.07.2019
PL10.07.2019
RO10.07.2019
SE10.07.2019
SI10.07.2019
SK10.07.2019
TR10.07.2019
BG10.10.2019
GR11.10.2019
IS10.11.2019
PT11.11.2019
AT22.05.2020
IE22.05.2020
IT22.05.2020
LU22.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
NL01.06.2020
[2023/27]
Former [2022/27]HU22.05.2006
CY10.07.2019
CZ10.07.2019
DK10.07.2019
EE10.07.2019
ES10.07.2019
FI10.07.2019
LT10.07.2019
LV10.07.2019
MC10.07.2019
PL10.07.2019
RO10.07.2019
SE10.07.2019
SI10.07.2019
SK10.07.2019
TR10.07.2019
BG10.10.2019
GR11.10.2019
IS10.11.2019
PT11.11.2019
AT22.05.2020
IE22.05.2020
LU22.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
NL01.06.2020
Former [2022/23]CZ10.07.2019
DK10.07.2019
EE10.07.2019
ES10.07.2019
FI10.07.2019
LT10.07.2019
LV10.07.2019
MC10.07.2019
PL10.07.2019
RO10.07.2019
SE10.07.2019
SI10.07.2019
SK10.07.2019
TR10.07.2019
BG10.10.2019
GR11.10.2019
IS10.11.2019
PT11.11.2019
AT22.05.2020
IE22.05.2020
LU22.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
NL01.06.2020
Former [2022/12]CZ10.07.2019
DK10.07.2019
EE10.07.2019
ES10.07.2019
FI10.07.2019
LT10.07.2019
LV10.07.2019
MC10.07.2019
PL10.07.2019
RO10.07.2019
SE10.07.2019
SI10.07.2019
SK10.07.2019
TR10.07.2019
BG10.10.2019
GR11.10.2019
IS10.11.2019
PT11.11.2019
AT22.05.2020
IE22.05.2020
IT22.05.2020
LU22.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
NL01.06.2020
Former [2021/37]CZ10.07.2019
DK10.07.2019
EE10.07.2019
ES10.07.2019
FI10.07.2019
LT10.07.2019
LV10.07.2019
MC10.07.2019
PL10.07.2019
RO10.07.2019
SE10.07.2019
SI10.07.2019
SK10.07.2019
TR10.07.2019
BG10.10.2019
GR11.10.2019
IS10.11.2019
PT11.11.2019
AT22.05.2020
IE22.05.2020
LU22.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
NL01.06.2020
Former [2021/24]CZ10.07.2019
DK10.07.2019
EE10.07.2019
ES10.07.2019
FI10.07.2019
LT10.07.2019
LV10.07.2019
MC10.07.2019
PL10.07.2019
RO10.07.2019
SE10.07.2019
SI10.07.2019
SK10.07.2019
TR10.07.2019
BG10.10.2019
GR11.10.2019
IS10.11.2019
PT11.11.2019
IE22.05.2020
LU22.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
NL01.06.2020
Former [2021/20]CZ10.07.2019
DK10.07.2019
EE10.07.2019
ES10.07.2019
FI10.07.2019
LT10.07.2019
LV10.07.2019
MC10.07.2019
PL10.07.2019
RO10.07.2019
SE10.07.2019
SI10.07.2019
SK10.07.2019
TR10.07.2019
BG10.10.2019
GR11.10.2019
IS10.11.2019
PT11.11.2019
IE22.05.2020
LU22.05.2020
CH31.05.2020
LI31.05.2020
NL01.06.2020
Former [2021/15]CZ10.07.2019
DK10.07.2019
EE10.07.2019
ES10.07.2019
FI10.07.2019
LT10.07.2019
LV10.07.2019
MC10.07.2019
PL10.07.2019
RO10.07.2019
SE10.07.2019
SI10.07.2019
SK10.07.2019
TR10.07.2019
BG10.10.2019
GR11.10.2019
IS10.11.2019
PT11.11.2019
LU22.05.2020
CH31.05.2020
LI31.05.2020
NL01.06.2020
Former [2021/12]CZ10.07.2019
DK10.07.2019
EE10.07.2019
ES10.07.2019
FI10.07.2019
LT10.07.2019
LV10.07.2019
MC10.07.2019
PL10.07.2019
RO10.07.2019
SE10.07.2019
SI10.07.2019
SK10.07.2019
TR10.07.2019
BG10.10.2019
GR11.10.2019
IS10.11.2019
PT11.11.2019
CH31.05.2020
LI31.05.2020
NL01.06.2020
Former [2021/08]CZ10.07.2019
DK10.07.2019
EE10.07.2019
ES10.07.2019
FI10.07.2019
LT10.07.2019
LV10.07.2019
PL10.07.2019
RO10.07.2019
SE10.07.2019
SI10.07.2019
SK10.07.2019
TR10.07.2019
BG10.10.2019
GR11.10.2019
IS10.11.2019
PT11.11.2019
CH31.05.2020
LI31.05.2020
Former [2020/37]CZ10.07.2019
DK10.07.2019
EE10.07.2019
ES10.07.2019
FI10.07.2019
LT10.07.2019
LV10.07.2019
PL10.07.2019
RO10.07.2019
SE10.07.2019
SI10.07.2019
SK10.07.2019
TR10.07.2019
BG10.10.2019
GR11.10.2019
IS10.11.2019
PT11.11.2019
Former [2020/36]CZ10.07.2019
DK10.07.2019
EE10.07.2019
ES10.07.2019
FI10.07.2019
LT10.07.2019
LV10.07.2019
PL10.07.2019
RO10.07.2019
SE10.07.2019
SK10.07.2019
TR10.07.2019
BG10.10.2019
GR11.10.2019
IS10.11.2019
PT11.11.2019
Former [2020/25]CZ10.07.2019
DK10.07.2019
EE10.07.2019
ES10.07.2019
FI10.07.2019
LT10.07.2019
LV10.07.2019
PL10.07.2019
RO10.07.2019
SE10.07.2019
SK10.07.2019
TR10.07.2019
BG10.10.2019
GR11.10.2019
PT11.11.2019
IS24.02.2020
Former [2020/24]DK10.07.2019
EE10.07.2019
ES10.07.2019
FI10.07.2019
LT10.07.2019
LV10.07.2019
PL10.07.2019
RO10.07.2019
SE10.07.2019
TR10.07.2019
BG10.10.2019
GR11.10.2019
PT11.11.2019
IS24.02.2020
Former [2020/23]DK10.07.2019
EE10.07.2019
ES10.07.2019
FI10.07.2019
LT10.07.2019
LV10.07.2019
PL10.07.2019
RO10.07.2019
SE10.07.2019
TR10.07.2019
BG10.10.2019
GR11.10.2019
IS10.11.2019
PT11.11.2019
Former [2020/22]DK10.07.2019
EE10.07.2019
ES10.07.2019
FI10.07.2019
LT10.07.2019
LV10.07.2019
SE10.07.2019
TR10.07.2019
BG10.10.2019
GR11.10.2019
IS10.11.2019
PT11.11.2019
Former [2020/17]ES10.07.2019
FI10.07.2019
LT10.07.2019
LV10.07.2019
SE10.07.2019
TR10.07.2019
BG10.10.2019
GR11.10.2019
IS10.11.2019
PT11.11.2019
Former [2020/12]ES10.07.2019
FI10.07.2019
LT10.07.2019
LV10.07.2019
SE10.07.2019
BG10.10.2019
GR11.10.2019
IS10.11.2019
PT11.11.2019
Former [2020/10]FI10.07.2019
LT10.07.2019
SE10.07.2019
BG10.10.2019
PT11.11.2019
Former [2020/09]FI10.07.2019
LT10.07.2019
Former [2020/08]LT10.07.2019
Cited inInternational search[XA]US2002158358  (FRANZENE BRIAN J) [X] 1-8,10,14-16,20,21,30,40 * paragraph [0065]; figure - * [A] 11,12,22,41,43,46;
 [XA]DE4404695  (WALTER, DIETMAR, 73447 OBERKOCHEN, DE) [X] 1-4,8-10,14-16,18-20,40 * column 2, line 20 - column 3, line 30; figure - * [A] 11,12,22,41,43,46;
 [XAY]WO0167947  (FULLEN SYSTEMS, LLC; FULLEN, JERYL, G; FULLEN, GEORGE, R) [X] 1,2,8,10,14,15,20,40 * page 10 - page 15; figure -; claims 1,17 * [A] 11,12,22 [Y] 41,43,46;
 [YA]US5678448  (FULLEN ET AL) [Y] 41,43,46 * figure - * [A] 1,11,12,14,15,22,40;
 [XA]US2005071935  (SHAH BINITH RATILAL ET AL) [X] 11-13,15,17-30,40 * paragraph [0035] - paragraph [0045]; figure -; claim - * [A] 1,14,41,43,46;
 [XA]US3696456  (TOM DAVID DUNHAM ET AL) [X] 11-13,15,17-20,40 * column 2; figure - * [A] 1,14,22,41,43,46
ExaminationEP0426363
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.