blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1907749

EP1907749 - INSULATED PIPE AND METHOD FOR PREPARING SAME [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  06.06.2014
Database last updated on 02.07.2024
Most recent event   Tooltip15.07.2016Lapse of the patent in a contracting state
New state(s): TR
published on 17.08.2016  [2016/33]
Applicant(s)For all designated states
Cabot Corporation
2 Seaport Lane Suite 1300
Boston MA 02210-2019 / US
[2008/15]
Inventor(s)01 / DINON, John, L.
236 Mount Vernon Street
Lawrence, MA 01843 / US
02 / KALKSTEIN, Hobart, C.
315 Cross Street
Carlisle, MA 01741 / US
03 / MAITY, Nirmalya
7 Jay Lane
Acton, MA 01720 / US
04 / PAINTAL, Ravijit
15 Idylwilde Road
Lexington, MA 02421 / US
05 / JOHNSON, Aaron, H.
274 Marrett Road
Lexington, MA 02421 / US
06 / DU PLESSIS, Andries
48 Winter Street
Woburn, MA 01801 / US
 [2008/15]
Representative(s)Grünecker Patent- und Rechtsanwälte PartG mbB
Leopoldstraße 4
80802 München / DE
[N/P]
Former [2013/31]Grünecker, Kinkeldey, Stockmair & Schwanhäusser
Leopoldstrasse 4
80802 München / DE
Former [2008/15]Grünecker, Kinkeldey, Stockmair & Schwanhäusser Anwaltssozietät
Maximilianstrasse 58
80538 München / DE
Application number, filing date06772244.706.06.2006
[2008/15]
WO2006US21864
Priority number, dateUS20050687672P06.06.2005         Original published format: US 687672 P
US2006033705021.01.2006         Original published format: US 337050
[2008/15]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report
No.:WO2006133155
Date:14.12.2006
Language:EN
[2006/50]
Type: A2 Application without search report 
No.:EP1907749
Date:09.04.2008
Language:EN
The application published by WIPO in one of the EPO official languages on 14.12.2006 takes the place of the publication of the European patent application.
[2008/15]
Type: B1 Patent specification 
No.:EP1907749
Date:31.07.2013
Language:EN
[2013/31]
Search report(s)International search report - published on:EP29.03.2007
ClassificationIPC:F16L59/153, F16L59/14
[2013/21]
CPC:
F16L59/143 (EP,US); F16L59/14 (KR); C04B30/00 (EP,US);
C04B38/08 (EP,US); F16L59/00 (KR); F16L59/028 (EP,US);
F16L59/153 (EP,US); Y10T29/49826 (EP,US) (-)
C-Set:
C04B30/00, C04B14/064 (EP,US);
C04B38/08, C04B14/06, C04B30/00, C04B38/0054 (US,EP)
Former IPC [2008/15]F16L59/14
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2008/15]
TitleGerman:ISOLIERTES ROHR UND HERSTELLUNGSVERFAHREN DAFÜR[2008/15]
English:INSULATED PIPE AND METHOD FOR PREPARING SAME[2008/15]
French:TUYAU ISOLE ET SON PROCEDE DE CONCEPTION[2008/15]
Entry into regional phase07.01.2008National basic fee paid 
07.01.2008Designation fee(s) paid 
07.01.2008Examination fee paid 
Examination procedure07.01.2008Amendment by applicant (claims and/or description)
07.01.2008Examination requested  [2008/15]
23.06.2010Despatch of a communication from the examining division (Time limit: M04)
29.10.2010Reply to a communication from the examining division
02.05.2012Despatch of a communication from the examining division (Time limit: M06)
01.10.2012Reply to a communication from the examining division
08.05.2013Communication of intention to grant the patent
20.06.2013Fee for grant paid
20.06.2013Fee for publishing/printing paid
Divisional application(s)EP08010622.2  / EP1975498
The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  23.06.2010
Opposition(s)02.05.2014No opposition filed within time limit [2014/28]
Fees paidRenewal fee
18.03.2008Renewal fee patent year 03
05.06.2009Renewal fee patent year 04
31.03.2010Renewal fee patent year 05
07.06.2011Renewal fee patent year 06
31.03.2012Renewal fee patent year 07
31.03.2013Renewal fee patent year 08
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU06.06.2006
AT31.07.2013
BE31.07.2013
BG31.07.2013
CY31.07.2013
CZ31.07.2013
DK31.07.2013
EE31.07.2013
ES31.07.2013
FI31.07.2013
IT31.07.2013
LT31.07.2013
LV31.07.2013
MC31.07.2013
NL31.07.2013
PL31.07.2013
RO31.07.2013
SE31.07.2013
SI31.07.2013
SK31.07.2013
TR31.07.2013
GR01.11.2013
IS30.11.2013
PT02.12.2013
[2016/33]
Former [2016/32]HU06.06.2006
AT31.07.2013
BE31.07.2013
BG31.07.2013
CY31.07.2013
CZ31.07.2013
DK31.07.2013
EE31.07.2013
ES31.07.2013
FI31.07.2013
IT31.07.2013
LT31.07.2013
LV31.07.2013
MC31.07.2013
NL31.07.2013
PL31.07.2013
RO31.07.2013
SE31.07.2013
SI31.07.2013
SK31.07.2013
GR01.11.2013
IS30.11.2013
PT02.12.2013
Former [2016/25]AT31.07.2013
BE31.07.2013
BG31.07.2013
CY31.07.2013
CZ31.07.2013
DK31.07.2013
EE31.07.2013
ES31.07.2013
FI31.07.2013
IT31.07.2013
LT31.07.2013
LV31.07.2013
MC31.07.2013
NL31.07.2013
PL31.07.2013
RO31.07.2013
SE31.07.2013
SI31.07.2013
SK31.07.2013
GR01.11.2013
IS30.11.2013
PT02.12.2013
Former [2015/09]AT31.07.2013
BE31.07.2013
CY31.07.2013
CZ31.07.2013
DK31.07.2013
EE31.07.2013
ES31.07.2013
FI31.07.2013
IT31.07.2013
LT31.07.2013
LV31.07.2013
MC31.07.2013
NL31.07.2013
PL31.07.2013
RO31.07.2013
SE31.07.2013
SI31.07.2013
SK31.07.2013
GR01.11.2013
IS30.11.2013
PT02.12.2013
Former [2014/24]AT31.07.2013
BE31.07.2013
CY31.07.2013
CZ31.07.2013
DK31.07.2013
EE31.07.2013
ES31.07.2013
FI31.07.2013
IT31.07.2013
LT31.07.2013
LV31.07.2013
NL31.07.2013
PL31.07.2013
RO31.07.2013
SE31.07.2013
SI31.07.2013
SK31.07.2013
GR01.11.2013
IS30.11.2013
PT02.12.2013
Former [2014/23]AT31.07.2013
BE31.07.2013
CY31.07.2013
CZ31.07.2013
DK31.07.2013
EE31.07.2013
FI31.07.2013
LT31.07.2013
LV31.07.2013
NL31.07.2013
PL31.07.2013
RO31.07.2013
SE31.07.2013
SI31.07.2013
SK31.07.2013
GR01.11.2013
IS30.11.2013
PT02.12.2013
Former [2014/22]AT31.07.2013
BE31.07.2013
CY31.07.2013
DK31.07.2013
FI31.07.2013
LT31.07.2013
LV31.07.2013
NL31.07.2013
PL31.07.2013
RO31.07.2013
SE31.07.2013
SI31.07.2013
GR01.11.2013
IS30.11.2013
PT02.12.2013
Former [2014/21]AT31.07.2013
BE31.07.2013
CY31.07.2013
DK31.07.2013
FI31.07.2013
LT31.07.2013
LV31.07.2013
NL31.07.2013
PL31.07.2013
SE31.07.2013
SI31.07.2013
GR01.11.2013
IS30.11.2013
PT02.12.2013
Former [2014/18]AT31.07.2013
BE31.07.2013
CY31.07.2013
FI31.07.2013
LT31.07.2013
LV31.07.2013
NL31.07.2013
PL31.07.2013
SE31.07.2013
SI31.07.2013
GR01.11.2013
IS30.11.2013
PT02.12.2013
Former [2014/14]CY03.07.2013
AT31.07.2013
BE31.07.2013
FI31.07.2013
LT31.07.2013
LV31.07.2013
NL31.07.2013
PL31.07.2013
SE31.07.2013
SI31.07.2013
GR01.11.2013
IS30.11.2013
PT02.12.2013
Former [2014/12]CY03.07.2013
AT31.07.2013
BE31.07.2013
FI31.07.2013
LT31.07.2013
LV31.07.2013
PL31.07.2013
SE31.07.2013
SI31.07.2013
GR01.11.2013
IS30.11.2013
PT02.12.2013
Former [2014/11]CY03.07.2013
AT31.07.2013
BE31.07.2013
FI31.07.2013
LT31.07.2013
PL31.07.2013
SE31.07.2013
IS30.11.2013
PT02.12.2013
Former [2014/10]CY03.07.2013
AT31.07.2013
BE31.07.2013
LT31.07.2013
SE31.07.2013
IS30.11.2013
PT02.12.2013
Former [2014/09]AT31.07.2013
BE31.07.2013
LT31.07.2013
SE31.07.2013
PT02.12.2013
Former [2014/08]LT31.07.2013
PT02.12.2013
Cited inInternational search[XAY]US4581804  (MCLAUGHLIN HUGH T [US]) [X] 1-6,8,10,11,16,17,21-32,34,36-40,42-44 * column 2,, lines 40-50 - column 3, lines 18-21; figures 1,3 * [A] 9,18-20,35,41 [Y] 7,12-15,33;
 [AY]US6132837  (BOES R ULRICH [DE], et al) [A] 1-44 * abstract * [Y] 7,12-15,33;
 [AY]WO03056230  (CABOT CORP [US]) [A] 1-44 * abstract *[Y] 7,12-15,33
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.