EP1943364 - METHOD AND INSTALLATION FOR THE DRY TRANSFORMATION OF A MATERIAL STRUCTURE OF SEMIFINISHED PRODUCTS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.07.2020 Database last updated on 30.07.2024 | |
Former | The patent has been granted Status updated on 05.07.2019 | ||
Former | Grant of patent is intended Status updated on 26.03.2019 | Most recent event Tooltip | 09.07.2021 | Lapse of the patent in a contracting state New state(s): HU | published on 11.08.2021 [2021/32] | Applicant(s) | For all designated states Robert Bosch GmbH Postfach 30 02 20 70442 Stuttgart / DE | [2020/18] |
Former [2008/29] | For all designated states ROBERT BOSCH GMBH Postfach 30 02 20 70442 Stuttgart / DE | Inventor(s) | 01 /
MUELLER, Bernhard Adolfstr. 29 70469 Stuttgart / DE | [2008/29] | Application number, filing date | 06793788.8 | 25.09.2006 | [2008/29] | WO2006EP66678 | Priority number, date | DE20051051420 | 27.10.2005 Original published format: DE102005051420 | [2008/29] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2007048664 | Date: | 03.05.2007 | Language: | DE | [2007/18] | Type: | A1 Application with search report | No.: | EP1943364 | Date: | 16.07.2008 | Language: | DE | The application published by WIPO in one of the EPO official languages on 03.05.2007 takes the place of the publication of the European patent application. | [2008/29] | Type: | B1 Patent specification | No.: | EP1943364 | Date: | 07.08.2019 | Language: | DE | [2019/32] | Search report(s) | International search report - published on: | EP | 03.05.2007 | Classification | IPC: | C21D1/767, C21D1/62, C21D9/00, C21D1/613, C21D1/20 | [2008/29] | CPC: |
C21D1/20 (EP,US);
C21D1/613 (EP,US);
C21D1/62 (EP,US);
C21D1/767 (EP,US);
C21D9/00 (EP,US);
C21D2211/002 (EP,US)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR [2019/32] |
Former [2008/29] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR | Extension states | AL | Not yet paid | BA | Not yet paid | HR | Not yet paid | MK | Not yet paid | RS | Not yet paid | Title | German: | VERFAHREN UND ANLAGE ZUR TROCKENEN UMWANDLUNG EINES MATERIAL-GEFÜGES VON HALBZEUGEN | [2008/29] | English: | METHOD AND INSTALLATION FOR THE DRY TRANSFORMATION OF A MATERIAL STRUCTURE OF SEMIFINISHED PRODUCTS | [2008/29] | French: | PROCÉDÉ ET INSTALLATION POUR LA TRANSFORMATION À SEC D UNE STRUCTURE DE MATÉRIAU DE PRODUITS SEMI-FINIS | [2008/29] | Entry into regional phase | 27.05.2008 | National basic fee paid | 27.05.2008 | Designation fee(s) paid | 27.05.2008 | Examination fee paid | Examination procedure | 27.05.2008 | Examination requested [2008/29] | 01.09.2008 | Despatch of a communication from the examining division (Time limit: M06) | 02.03.2009 | Reply to a communication from the examining division | 16.03.2016 | Despatch of a communication from the examining division (Time limit: M06) | 16.09.2016 | Reply to a communication from the examining division | 27.03.2019 | Communication of intention to grant the patent | 25.06.2019 | Fee for grant paid | 25.06.2019 | Fee for publishing/printing paid | 25.06.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 01.09.2008 | Opposition(s) | 03.06.2020 | No opposition filed within time limit [2020/33] | Fees paid | Renewal fee | 30.09.2008 | Renewal fee patent year 03 | 30.09.2009 | Renewal fee patent year 04 | 30.09.2010 | Renewal fee patent year 05 | 30.09.2011 | Renewal fee patent year 06 | 01.10.2012 | Renewal fee patent year 07 | 30.09.2013 | Renewal fee patent year 08 | 30.09.2014 | Renewal fee patent year 09 | 30.09.2015 | Renewal fee patent year 10 | 30.09.2016 | Renewal fee patent year 11 | 02.10.2017 | Renewal fee patent year 12 | 01.10.2018 | Renewal fee patent year 13 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 25.09.2006 | CY | 07.08.2019 | CZ | 07.08.2019 | DK | 07.08.2019 | EE | 07.08.2019 | ES | 07.08.2019 | FI | 07.08.2019 | IT | 07.08.2019 | LT | 07.08.2019 | LV | 07.08.2019 | MC | 07.08.2019 | NL | 07.08.2019 | PL | 07.08.2019 | RO | 07.08.2019 | SE | 07.08.2019 | SI | 07.08.2019 | SK | 07.08.2019 | TR | 07.08.2019 | AT | 25.09.2019 | IE | 25.09.2019 | LU | 25.09.2019 | BE | 30.09.2019 | CH | 30.09.2019 | LI | 30.09.2019 | FR | 07.10.2019 | BG | 07.11.2019 | GB | 07.11.2019 | GR | 08.11.2019 | IS | 07.12.2019 | PT | 09.12.2019 | [2021/32] |
Former [2021/26] | CY | 07.08.2019 | |
CZ | 07.08.2019 | ||
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
ES | 07.08.2019 | ||
FI | 07.08.2019 | ||
IT | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
MC | 07.08.2019 | ||
NL | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
SE | 07.08.2019 | ||
SI | 07.08.2019 | ||
SK | 07.08.2019 | ||
TR | 07.08.2019 | ||
AT | 25.09.2019 | ||
IE | 25.09.2019 | ||
LU | 25.09.2019 | ||
BE | 30.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
FR | 07.10.2019 | ||
BG | 07.11.2019 | ||
GB | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
PT | 09.12.2019 | ||
Former [2021/11] | CZ | 07.08.2019 | |
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
ES | 07.08.2019 | ||
FI | 07.08.2019 | ||
IT | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
MC | 07.08.2019 | ||
NL | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
SE | 07.08.2019 | ||
SI | 07.08.2019 | ||
SK | 07.08.2019 | ||
TR | 07.08.2019 | ||
AT | 25.09.2019 | ||
IE | 25.09.2019 | ||
LU | 25.09.2019 | ||
BE | 30.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
FR | 07.10.2019 | ||
BG | 07.11.2019 | ||
GB | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
PT | 09.12.2019 | ||
Former [2020/48] | CZ | 07.08.2019 | |
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
ES | 07.08.2019 | ||
FI | 07.08.2019 | ||
IT | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
MC | 07.08.2019 | ||
NL | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
SE | 07.08.2019 | ||
SI | 07.08.2019 | ||
SK | 07.08.2019 | ||
TR | 07.08.2019 | ||
IE | 25.09.2019 | ||
LU | 25.09.2019 | ||
BE | 30.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
FR | 07.10.2019 | ||
BG | 07.11.2019 | ||
GB | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
PT | 09.12.2019 | ||
Former [2020/37] | CZ | 07.08.2019 | |
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
ES | 07.08.2019 | ||
FI | 07.08.2019 | ||
IT | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
MC | 07.08.2019 | ||
NL | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
SE | 07.08.2019 | ||
SI | 07.08.2019 | ||
SK | 07.08.2019 | ||
TR | 07.08.2019 | ||
IE | 25.09.2019 | ||
LU | 25.09.2019 | ||
BE | 30.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
BG | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
PT | 09.12.2019 | ||
Former [2020/36] | CZ | 07.08.2019 | |
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
ES | 07.08.2019 | ||
FI | 07.08.2019 | ||
IT | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
MC | 07.08.2019 | ||
NL | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
SE | 07.08.2019 | ||
SK | 07.08.2019 | ||
TR | 07.08.2019 | ||
IE | 25.09.2019 | ||
LU | 25.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
BG | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
PT | 09.12.2019 | ||
Former [2020/35] | CZ | 07.08.2019 | |
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
ES | 07.08.2019 | ||
FI | 07.08.2019 | ||
IT | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
MC | 07.08.2019 | ||
NL | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
SE | 07.08.2019 | ||
SK | 07.08.2019 | ||
TR | 07.08.2019 | ||
LU | 25.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
BG | 07.11.2019 | ||
GR | 08.11.2019 | ||
PT | 09.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/34] | CZ | 07.08.2019 | |
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
ES | 07.08.2019 | ||
FI | 07.08.2019 | ||
IT | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
MC | 07.08.2019 | ||
NL | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
SE | 07.08.2019 | ||
SK | 07.08.2019 | ||
TR | 07.08.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
BG | 07.11.2019 | ||
GR | 08.11.2019 | ||
PT | 09.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/27] | CZ | 07.08.2019 | |
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
ES | 07.08.2019 | ||
FI | 07.08.2019 | ||
IT | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
MC | 07.08.2019 | ||
NL | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
SE | 07.08.2019 | ||
SK | 07.08.2019 | ||
TR | 07.08.2019 | ||
BG | 07.11.2019 | ||
GR | 08.11.2019 | ||
PT | 09.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/25] | CZ | 07.08.2019 | |
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
ES | 07.08.2019 | ||
FI | 07.08.2019 | ||
IT | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
NL | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
SE | 07.08.2019 | ||
SK | 07.08.2019 | ||
TR | 07.08.2019 | ||
BG | 07.11.2019 | ||
GR | 08.11.2019 | ||
PT | 09.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/24] | DK | 07.08.2019 | |
EE | 07.08.2019 | ||
ES | 07.08.2019 | ||
FI | 07.08.2019 | ||
IT | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
NL | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
SE | 07.08.2019 | ||
TR | 07.08.2019 | ||
BG | 07.11.2019 | ||
GR | 08.11.2019 | ||
PT | 09.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/23] | DK | 07.08.2019 | |
EE | 07.08.2019 | ||
ES | 07.08.2019 | ||
FI | 07.08.2019 | ||
IT | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
NL | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
SE | 07.08.2019 | ||
TR | 07.08.2019 | ||
BG | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
PT | 09.12.2019 | ||
Former [2020/22] | DK | 07.08.2019 | |
EE | 07.08.2019 | ||
ES | 07.08.2019 | ||
FI | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
NL | 07.08.2019 | ||
SE | 07.08.2019 | ||
TR | 07.08.2019 | ||
BG | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
PT | 09.12.2019 | ||
Former [2020/17] | ES | 07.08.2019 | |
FI | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
NL | 07.08.2019 | ||
SE | 07.08.2019 | ||
TR | 07.08.2019 | ||
BG | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
PT | 09.12.2019 | ||
Former [2020/12] | ES | 07.08.2019 | |
FI | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
NL | 07.08.2019 | ||
SE | 07.08.2019 | ||
BG | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
PT | 09.12.2019 | ||
Former [2020/10] | FI | 07.08.2019 | |
LT | 07.08.2019 | ||
NL | 07.08.2019 | ||
SE | 07.08.2019 | ||
BG | 07.11.2019 | ||
PT | 09.12.2019 | ||
Former [2020/09] | FI | 07.08.2019 | |
LT | 07.08.2019 | ||
NL | 07.08.2019 | ||
Former [2020/08] | LT | 07.08.2019 | Cited in | International search | [X]US4009872 (MCCOY JOHN F) [X] 1,2 * column 2, line 65 - column 3, line 4; figure 1 *; | [X]EP0163906 (SCHMETZ INDUSTRIEOFENBAU UND V [DE]) [X] 1,2 * page 4, line 25 - line 32; figure 1; claims 1,2 *; | [X]US5362031 (HEILMANN PAUL [DE], et al) [X] 1-3 * column 3, line 61 - column 4, line 9 * * column 4, line 63 - column 5, line 12 *; | [X]EP0955384 (ALD VACUUM TECHN GMBH [DE]) [X] 1,2* paragraph [0022]; figure 1 * |