EP2082276 - OPTICAL FIBRE UNIT BLOWING INSTALLATION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.11.2017 Database last updated on 21.05.2024 | |
Former | The patent has been granted Status updated on 02.12.2016 | ||
Former | Grant of patent is intended Status updated on 25.11.2016 | Most recent event Tooltip | 06.03.2020 | Lapse of the patent in a contracting state New state(s): TR | published on 08.04.2020 [2020/15] | Applicant(s) | For all designated states Prysmian Cables & Systems Limited Chickenhall Lane Eastleigh Hampshire SO50 6YU / GB | [2009/31] | Inventor(s) | 01 /
GRIFFITHS, Ian Prysmian Cables & Systems UK Ltd Chickenhall Lane Eastleigh Hampshire SO50 6YU / GB | 02 /
HUBBARD, Paul Prysmian Cables & Systems UK Ltd Chickenhall Lane Eastleigh Hampshire SO50 6YU / GB | [2017/01] |
Former [2009/31] | 01 /
GRIFFITHS, Ian Prysmian Cables & Systems UK Ltd Chickenhall Lane Eastleigh Hampshire SO50 6YU / GB | ||
02 /
HUBBARD, Paul Prysmian Cables & Systems UK Ltd Chickenhall Lane Eastleigh Hampshire SO50 6YU / GB | Representative(s) | Whitlock, Holly Elizabeth Ann, et al Maucher Jenkins Seventh Floor Offices Artillery House 11-19 Artillery Row London SW1P 1RT / GB | [N/P] |
Former [2017/01] | Whitlock, Holly Elizabeth Ann, et al Maucher Jenkins 26 Caxton Street London SW1H 0RJ / GB | ||
Former [2009/48] | Whitlock, Holly Elizabeth Ann, et al R.G.C. Jenkins & Co 26 Caxton Street London SW1H 0RJ / GB | ||
Former [2009/31] | Whitlock, Holly Elizabeth Ann, et al R G C Jenkins, 26 Caxton Street London SW1H 0RJ / GB | Application number, filing date | 06808460.7 | 07.11.2006 | [2009/31] | WO2006GB04165 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2008056091 | Date: | 15.05.2008 | Language: | EN | [2008/20] | Type: | A1 Application with search report | No.: | EP2082276 | Date: | 29.07.2009 | Language: | EN | The application published by WIPO in one of the EPO official languages on 15.05.2008 takes the place of the publication of the European patent application. | [2009/31] | Type: | B1 Patent specification | No.: | EP2082276 | Date: | 04.01.2017 | Language: | EN | [2017/01] | Search report(s) | International search report - published on: | EP | 15.05.2008 | Classification | IPC: | G02B6/44 | [2009/31] | CPC: |
G02B6/4471 (EP);
G02B6/4428 (EP);
G02B6/4446 (EP);
G02B6/52 (EP)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR [2017/01] |
Former [2009/31] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR | Title | German: | GLASINSTALLATIONEN FÜR OPTISCHE FASEREINHEITEN | [2009/31] | English: | OPTICAL FIBRE UNIT BLOWING INSTALLATION | [2009/31] | French: | INSTALLATION DE SOUFFLAGE D'UNITÉ DE FIBRE OPTIQUE | [2009/31] | Entry into regional phase | 05.06.2009 | National basic fee paid | 05.06.2009 | Designation fee(s) paid | 05.06.2009 | Examination fee paid | Examination procedure | 05.06.2009 | Examination requested [2009/31] | 10.07.2009 | Amendment by applicant (claims and/or description) | 05.02.2010 | Despatch of a communication from the examining division (Time limit: M04) | 15.06.2010 | Reply to a communication from the examining division | 02.10.2013 | Despatch of a communication from the examining division (Time limit: M04) | 20.01.2014 | Reply to a communication from the examining division | 14.07.2016 | Communication of intention to grant the patent | 23.11.2016 | Fee for grant paid | 23.11.2016 | Fee for publishing/printing paid | 23.11.2016 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 05.02.2010 | Opposition(s) | 05.10.2017 | No opposition filed within time limit [2017/50] | Fees paid | Renewal fee | 05.06.2009 | Renewal fee patent year 03 | 25.11.2009 | Renewal fee patent year 04 | 24.11.2010 | Renewal fee patent year 05 | 23.11.2011 | Renewal fee patent year 06 | 26.11.2012 | Renewal fee patent year 07 | 27.11.2013 | Renewal fee patent year 08 | 26.11.2014 | Renewal fee patent year 09 | 30.11.2015 | Renewal fee patent year 10 | 28.11.2016 | Renewal fee patent year 11 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 07.11.2006 | AT | 04.01.2017 | CY | 04.01.2017 | CZ | 04.01.2017 | DK | 04.01.2017 | EE | 04.01.2017 | ES | 04.01.2017 | FI | 04.01.2017 | IT | 04.01.2017 | LT | 04.01.2017 | LV | 04.01.2017 | MC | 04.01.2017 | NL | 04.01.2017 | PL | 04.01.2017 | RO | 04.01.2017 | SE | 04.01.2017 | SI | 04.01.2017 | SK | 04.01.2017 | TR | 04.01.2017 | BG | 04.04.2017 | GR | 05.04.2017 | IS | 04.05.2017 | PT | 04.05.2017 | [2020/15] |
Former [2019/46] | HU | 07.11.2006 | |
AT | 04.01.2017 | ||
CY | 04.01.2017 | ||
CZ | 04.01.2017 | ||
DK | 04.01.2017 | ||
EE | 04.01.2017 | ||
ES | 04.01.2017 | ||
FI | 04.01.2017 | ||
IT | 04.01.2017 | ||
LT | 04.01.2017 | ||
LV | 04.01.2017 | ||
MC | 04.01.2017 | ||
NL | 04.01.2017 | ||
PL | 04.01.2017 | ||
RO | 04.01.2017 | ||
SE | 04.01.2017 | ||
SI | 04.01.2017 | ||
SK | 04.01.2017 | ||
BG | 04.04.2017 | ||
GR | 05.04.2017 | ||
IS | 04.05.2017 | ||
PT | 04.05.2017 | ||
Former [2019/31] | HU | 07.11.2006 | |
AT | 04.01.2017 | ||
CZ | 04.01.2017 | ||
DK | 04.01.2017 | ||
EE | 04.01.2017 | ||
ES | 04.01.2017 | ||
FI | 04.01.2017 | ||
IT | 04.01.2017 | ||
LT | 04.01.2017 | ||
LV | 04.01.2017 | ||
MC | 04.01.2017 | ||
NL | 04.01.2017 | ||
PL | 04.01.2017 | ||
RO | 04.01.2017 | ||
SE | 04.01.2017 | ||
SI | 04.01.2017 | ||
SK | 04.01.2017 | ||
BG | 04.04.2017 | ||
GR | 05.04.2017 | ||
IS | 04.05.2017 | ||
PT | 04.05.2017 | ||
Former [2018/33] | AT | 04.01.2017 | |
CZ | 04.01.2017 | ||
DK | 04.01.2017 | ||
EE | 04.01.2017 | ||
ES | 04.01.2017 | ||
FI | 04.01.2017 | ||
IT | 04.01.2017 | ||
LT | 04.01.2017 | ||
LV | 04.01.2017 | ||
MC | 04.01.2017 | ||
NL | 04.01.2017 | ||
PL | 04.01.2017 | ||
RO | 04.01.2017 | ||
SE | 04.01.2017 | ||
SI | 04.01.2017 | ||
SK | 04.01.2017 | ||
BG | 04.04.2017 | ||
GR | 05.04.2017 | ||
IS | 04.05.2017 | ||
PT | 04.05.2017 | ||
Former [2018/14] | AT | 04.01.2017 | |
CZ | 04.01.2017 | ||
DK | 04.01.2017 | ||
EE | 04.01.2017 | ||
ES | 04.01.2017 | ||
FI | 04.01.2017 | ||
IT | 04.01.2017 | ||
LT | 04.01.2017 | ||
LV | 04.01.2017 | ||
NL | 04.01.2017 | ||
PL | 04.01.2017 | ||
RO | 04.01.2017 | ||
SE | 04.01.2017 | ||
SI | 04.01.2017 | ||
SK | 04.01.2017 | ||
BG | 04.04.2017 | ||
GR | 05.04.2017 | ||
IS | 04.05.2017 | ||
PT | 04.05.2017 | ||
Former [2017/50] | AT | 04.01.2017 | |
CZ | 04.01.2017 | ||
DK | 04.01.2017 | ||
EE | 04.01.2017 | ||
ES | 04.01.2017 | ||
FI | 04.01.2017 | ||
IT | 04.01.2017 | ||
LT | 04.01.2017 | ||
LV | 04.01.2017 | ||
NL | 04.01.2017 | ||
PL | 04.01.2017 | ||
RO | 04.01.2017 | ||
SE | 04.01.2017 | ||
SK | 04.01.2017 | ||
BG | 04.04.2017 | ||
GR | 05.04.2017 | ||
IS | 04.05.2017 | ||
PT | 04.05.2017 | ||
Former [2017/49] | AT | 04.01.2017 | |
CZ | 04.01.2017 | ||
EE | 04.01.2017 | ||
ES | 04.01.2017 | ||
FI | 04.01.2017 | ||
IT | 04.01.2017 | ||
LT | 04.01.2017 | ||
LV | 04.01.2017 | ||
NL | 04.01.2017 | ||
PL | 04.01.2017 | ||
RO | 04.01.2017 | ||
SE | 04.01.2017 | ||
SK | 04.01.2017 | ||
BG | 04.04.2017 | ||
GR | 05.04.2017 | ||
IS | 04.05.2017 | ||
PT | 04.05.2017 | ||
Former [2017/48] | AT | 04.01.2017 | |
CZ | 04.01.2017 | ||
ES | 04.01.2017 | ||
FI | 04.01.2017 | ||
LT | 04.01.2017 | ||
LV | 04.01.2017 | ||
NL | 04.01.2017 | ||
PL | 04.01.2017 | ||
SE | 04.01.2017 | ||
BG | 04.04.2017 | ||
GR | 05.04.2017 | ||
IS | 04.05.2017 | ||
PT | 04.05.2017 | ||
Former [2017/40] | AT | 04.01.2017 | |
ES | 04.01.2017 | ||
FI | 04.01.2017 | ||
LT | 04.01.2017 | ||
LV | 04.01.2017 | ||
NL | 04.01.2017 | ||
PL | 04.01.2017 | ||
SE | 04.01.2017 | ||
BG | 04.04.2017 | ||
GR | 05.04.2017 | ||
IS | 04.05.2017 | ||
PT | 04.05.2017 | Cited in | International search | [A]FR2337451 (TECHNILEC SARL [FR]) [A] 1 * abstract *; | [A]EP0187502 (CRITCHLEY LTD [GB]) [A] 1-27 * abstract *; | [A]EP0350245 (BICC PLC [GB], et al) [A] 1* abstract *; | [A]WO9220000 (FIBRE LITE CORP [US]) [A] 1 * abstract *; | [A]DE4406154 (ANT NACHRICHTENTECH [DE]) [A] 1 * abstract *; | [A]US5471555 (BRAGA DAVID J [US], et al) [A] 1-27 * abstract *; | [DA]US5610370 (FREMGEN DIETER [DE], et al) [DA] 1-27 * abstract *; | [A]US6176022 (GRIFFIOEN WILLEM [NL]) [A] 1-27 * abstract * |