blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2054533

EP2054533 - A FERRO-ALLOY INSERTING APPARATUS WITH REDUCED ABSORPTION OF OXYGEN AND ABSORPTION OF NITROGEN AND INSERTING METHOD THEREOF [Right-click to bookmark this link]
StatusThe application has been withdrawn
Status updated on  25.11.2011
Database last updated on 22.08.2024
Most recent event   Tooltip25.11.2011Withdrawal of applicationpublished on 28.12.2011  [2011/52]
Applicant(s)For all designated states
Posco Co., Ltd.
1, Goidong-dong, Nam-gu, Pohang-shi
Kyungsangbook-do 790-300 / KR
[2009/19]
Inventor(s)01 / HONG, Ki Kun
Woobang Apt. 105-806, Yongheung-dong, Buk-gu
Pohang Kyungsangbuk-do 791-754 / KR
02 / CHO, Sung Woan
Green Apt. 227-702, Jigok-dong, Nam-gu
Pohang Kyungsangbuk-do 790-752 / KR
03 / LEE, Hee ho
LG Green Villa 348-101, Jigok-dong, Nam-gu
Pohang Kyungsangbuk-do 790-751 / KR
04 / KIM, Dong sik
875-1 Moolcheon-ri, Cheonbuk-myun
Gyeongju Kyungsangbuk-do 780-873 / KR
05 / PARK, Joo Hyun
Kyungsung Home Town 201-508 Deukryang-dong, Buk-gu
Pohang Kyungsangbuk-do 791-792 / KR
 [2009/19]
Representative(s)Zech, Stefan Markus, et al
Meissner Bolte Patentanwälte
Rechtsanwälte Partnerschaft mbB
Postfach 86 06 24
81633 München / DE
[N/P]
Former [2009/19]Zech, Stefan Markus, et al
Meissner, Bolte & Partner GbR Postfach 86 06 24
81633 München / DE
Application number, filing date06824112.412.12.2006
[2009/19]
WO2006KR05406
Priority number, dateKR2006007969223.08.2006         Original published format: KR 20060079692
KR2006007969323.08.2006         Original published format: KR 20060079693
[2009/19]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2008023863
Date:28.02.2008
Language:EN
[2008/09]
Type: A1 Application with search report 
No.:EP2054533
Date:06.05.2009
Language:EN
The application published by WIPO in one of the EPO official languages on 28.02.2008 takes the place of the publication of the European patent application.
[2009/19]
Search report(s)International search report - published on:KR28.02.2008
(Supplementary) European search report - dispatched on:EP30.11.2009
ClassificationIPC:C21C7/00, F27D3/16, F27D3/18
[2010/01]
CPC:
C21C7/0006 (EP); C21C7/0037 (EP); C21C7/0075 (EP);
F27D3/16 (EP); F27D3/18 (EP); C21C2300/06 (EP);
C21C5/5264 (EP); Y02P10/20 (EP); Y02P10/25 (EP) (-)
Former IPC [2009/19]C21C7/00
Designated contracting statesDE,   FR,   SE [2009/40]
Former [2009/19]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  NL,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
Extension statesALNot yet paid
BANot yet paid
HRNot yet paid
MKNot yet paid
RSNot yet paid
TitleGerman:EISENLEGIERUNGSINSERTIERUNGSVORRICHTUNG MIT VERRINGERTER ABSORPTION VON SAUERSTOFF UND ABSORPTION VON STICKSTOFF UND INSERTIERUNGSVERFAHREN DAFÜR[2009/19]
English:A FERRO-ALLOY INSERTING APPARATUS WITH REDUCED ABSORPTION OF OXYGEN AND ABSORPTION OF NITROGEN AND INSERTING METHOD THEREOF[2009/19]
French:APPAREILET PROCÉDÉ D'INSERTION D'UN FERRO-ALLIAGE À ABSORPTION RÉDUITE D'OXYGÈNE ET D'HYDROGÈNE[2009/19]
Entry into regional phase19.02.2009National basic fee paid 
19.02.2009Search fee paid 
19.02.2009Designation fee(s) paid 
19.02.2009Examination fee paid 
Examination procedure23.06.2008Request for preliminary examination filed
International Preliminary Examining Authority: KR
19.02.2009Amendment by applicant (claims and/or description)
19.02.2009Examination requested  [2009/19]
24.03.2009Loss of particular rights, legal effect: designated state(s)
11.05.2009Despatch of communication of loss of particular rights: designated state(s) AT, BE, BG, CH, CY, CZ, DK, EE, ES, FI, GB, GR, HU, IE, IS, IT, LT, LU, LV, MC, NL, PL, PT, RO, SI, SK, TR
08.09.2010Despatch of a communication from the examining division (Time limit: M06)
18.03.2011Reply to a communication from the examining division
16.11.2011Application withdrawn by applicant  [2011/52]
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  08.09.2010
Fees paidRenewal fee
19.02.2009Renewal fee patent year 03
29.12.2009Renewal fee patent year 04
30.12.2010Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[A]US2858125  (CLENNY II JAMES T, et al) [A] 1-9 * figures 1-3 * * claim 1 *;
 [A]DE1433464  (COMBUSTION ENG) [A] 1-9 * figure 4 ** claim 1 *;
 [I]US3880411  (VORONOVA NATALYA ALEXANDROVNA, et al) [I] 1,3-9 * figures 1-3 * * abstract * * claim 1 *
International search[A]US6136064  (NEWCOMB KEVIN C [US]);
 [A]US6409962  (LAWSON PAUL D [US]);
 [A]US5919283  (AREAUX LARRY D [US]);
 [A]JP2005002369  (SUMITOMO METAL IND)
by applicantJPH059552
 US5211744
 US3880411
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.