blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1814283

EP1814283 - Accessing distributed services in a network [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  18.10.2019
Database last updated on 20.05.2024
FormerThe patent has been granted
Status updated on  09.11.2018
FormerGrant of patent is intended
Status updated on  12.07.2018
FormerExamination is in progress
Status updated on  25.01.2017
Most recent event   Tooltip09.07.2021Lapse of the patent in a contracting state
New state(s): HU
published on 11.08.2021  [2021/32]
Applicant(s)For all designated states
Corporation for National Research Initiatives
1895 Preston White Drive
Reston VA 20191 / US
[2007/31]
Inventor(s)01 / Reilly, Sean David
13301 John Taylor Memorial Highway
Charles City 23030, Virginia / US
 [2007/31]
Representative(s)Williams, Gareth Owen, et al
Marks & Clerk LLP
62-68 Hills Road
Cambridge CB2 1LA / GB
[2018/50]
Former [2011/12]Williams, Gareth Owen, et al
Marks & Clerk LLP 62-68 Hills Road Cambridge
CB2 1LA / GB
Former [2007/31]Ruffles, Graham Keith
Marks & Clerk 66-68 Hills Road
Cambridge CB2 1LA / GB
Application number, filing date07001609.225.01.2007
[2007/31]
Priority number, dateUS2006034023125.01.2006         Original published format: US 340231
[2007/31]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP1814283
Date:01.08.2007
Language:EN
[2007/31]
Type: B1 Patent specification 
No.:EP1814283
Date:12.12.2018
Language:EN
[2018/50]
Search report(s)(Supplementary) European search report - dispatched on:EP05.06.2007
ClassificationIPC:H04L29/08, H04L29/12
[2007/31]
CPC:
H04L67/1008 (EP,US); H04L61/4511 (EP,US); H04L67/1001 (EP,US)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2018/50]
Former [2007/31]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  NL,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
TitleGerman:Zugreifen auf verteilte Dienstleistungen in einem Netzwerk[2007/31]
English:Accessing distributed services in a network[2007/31]
French:Services distribués d'accès dans un réseau[2007/31]
Examination procedure25.01.2007Examination requested  [2007/31]
22.02.2008Despatch of a communication from the examining division (Time limit: M06)
03.09.2008Reply to a communication from the examining division
16.01.2017Despatch of a communication from the examining division (Time limit: M06)
26.07.2017Reply to a communication from the examining division
13.07.2018Communication of intention to grant the patent
29.10.2018Fee for grant paid
29.10.2018Fee for publishing/printing paid
29.10.2018Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  22.02.2008
Opposition(s)13.09.2019No opposition filed within time limit [2019/47]
Fees paidRenewal fee
30.01.2009Renewal fee patent year 03
25.01.2010Renewal fee patent year 04
25.01.2011Renewal fee patent year 05
25.01.2012Renewal fee patent year 06
25.01.2013Renewal fee patent year 07
27.01.2014Renewal fee patent year 08
27.01.2015Renewal fee patent year 09
27.01.2016Renewal fee patent year 10
27.01.2017Renewal fee patent year 11
29.01.2018Renewal fee patent year 12
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU25.01.2007
AT12.12.2018
CY12.12.2018
CZ12.12.2018
DK12.12.2018
EE12.12.2018
ES12.12.2018
FI12.12.2018
IT12.12.2018
LT12.12.2018
LV12.12.2018
MC12.12.2018
NL12.12.2018
PL12.12.2018
RO12.12.2018
SE12.12.2018
SI12.12.2018
SK12.12.2018
TR12.12.2018
IE25.01.2019
LU25.01.2019
BE31.01.2019
CH31.01.2019
LI31.01.2019
BG12.03.2019
GR13.03.2019
IS12.04.2019
PT12.04.2019
[2021/32]
Former [2021/26]AT12.12.2018
CY12.12.2018
CZ12.12.2018
DK12.12.2018
EE12.12.2018
ES12.12.2018
FI12.12.2018
IT12.12.2018
LT12.12.2018
LV12.12.2018
MC12.12.2018
NL12.12.2018
PL12.12.2018
RO12.12.2018
SE12.12.2018
SI12.12.2018
SK12.12.2018
TR12.12.2018
IE25.01.2019
LU25.01.2019
BE31.01.2019
CH31.01.2019
LI31.01.2019
BG12.03.2019
GR13.03.2019
IS12.04.2019
PT12.04.2019
Former [2020/17]AT12.12.2018
CZ12.12.2018
DK12.12.2018
EE12.12.2018
ES12.12.2018
FI12.12.2018
IT12.12.2018
LT12.12.2018
LV12.12.2018
MC12.12.2018
NL12.12.2018
PL12.12.2018
RO12.12.2018
SE12.12.2018
SI12.12.2018
SK12.12.2018
TR12.12.2018
IE25.01.2019
LU25.01.2019
BE31.01.2019
CH31.01.2019
LI31.01.2019
BG12.03.2019
GR13.03.2019
IS12.04.2019
PT12.04.2019
Former [2020/09]AT12.12.2018
CZ12.12.2018
DK12.12.2018
EE12.12.2018
ES12.12.2018
FI12.12.2018
IT12.12.2018
LT12.12.2018
LV12.12.2018
MC12.12.2018
NL12.12.2018
PL12.12.2018
RO12.12.2018
SE12.12.2018
SI12.12.2018
SK12.12.2018
IE25.01.2019
LU25.01.2019
BE31.01.2019
CH31.01.2019
LI31.01.2019
BG12.03.2019
GR13.03.2019
IS12.04.2019
PT12.04.2019
Former [2020/04]AT12.12.2018
CZ12.12.2018
DK12.12.2018
EE12.12.2018
ES12.12.2018
FI12.12.2018
IT12.12.2018
LT12.12.2018
LV12.12.2018
MC12.12.2018
NL12.12.2018
PL12.12.2018
RO12.12.2018
SE12.12.2018
SI12.12.2018
SK12.12.2018
LU25.01.2019
BE31.01.2019
CH31.01.2019
LI31.01.2019
BG12.03.2019
GR13.03.2019
IS12.04.2019
PT12.04.2019
Former [2019/50]AT12.12.2018
CZ12.12.2018
DK12.12.2018
EE12.12.2018
ES12.12.2018
FI12.12.2018
IT12.12.2018
LT12.12.2018
LV12.12.2018
MC12.12.2018
NL12.12.2018
PL12.12.2018
RO12.12.2018
SE12.12.2018
SI12.12.2018
SK12.12.2018
LU25.01.2019
BE31.01.2019
BG12.03.2019
GR13.03.2019
IS12.04.2019
PT12.04.2019
Former [2019/48]AT12.12.2018
CZ12.12.2018
DK12.12.2018
EE12.12.2018
ES12.12.2018
FI12.12.2018
IT12.12.2018
LT12.12.2018
LV12.12.2018
MC12.12.2018
NL12.12.2018
PL12.12.2018
RO12.12.2018
SE12.12.2018
SK12.12.2018
LU25.01.2019
BG12.03.2019
GR13.03.2019
IS12.04.2019
PT12.04.2019
Former [2019/46]AT12.12.2018
CZ12.12.2018
EE12.12.2018
ES12.12.2018
FI12.12.2018
IT12.12.2018
LT12.12.2018
LV12.12.2018
MC12.12.2018
NL12.12.2018
PL12.12.2018
RO12.12.2018
SE12.12.2018
SK12.12.2018
LU25.01.2019
BG12.03.2019
GR13.03.2019
IS12.04.2019
PT12.04.2019
Former [2019/45]CZ12.12.2018
EE12.12.2018
ES12.12.2018
FI12.12.2018
IT12.12.2018
LT12.12.2018
LV12.12.2018
MC12.12.2018
NL12.12.2018
PL12.12.2018
RO12.12.2018
SE12.12.2018
SK12.12.2018
LU25.01.2019
BG12.03.2019
GR13.03.2019
IS12.04.2019
PT12.04.2019
Former [2019/44]CZ12.12.2018
EE12.12.2018
ES12.12.2018
FI12.12.2018
IT12.12.2018
LT12.12.2018
LV12.12.2018
NL12.12.2018
PL12.12.2018
RO12.12.2018
SE12.12.2018
SK12.12.2018
LU25.01.2019
BG12.03.2019
GR13.03.2019
IS12.04.2019
PT12.04.2019
Former [2019/39]CZ12.12.2018
EE12.12.2018
ES12.12.2018
FI12.12.2018
IT12.12.2018
LT12.12.2018
LV12.12.2018
NL12.12.2018
PL12.12.2018
RO12.12.2018
SE12.12.2018
SK12.12.2018
BG12.03.2019
GR13.03.2019
IS12.04.2019
PT12.04.2019
Former [2019/37]CZ12.12.2018
EE12.12.2018
ES12.12.2018
FI12.12.2018
IT12.12.2018
LT12.12.2018
LV12.12.2018
NL12.12.2018
PL12.12.2018
RO12.12.2018
SE12.12.2018
BG12.03.2019
GR13.03.2019
PT12.04.2019
Former [2019/35]CZ12.12.2018
ES12.12.2018
FI12.12.2018
IT12.12.2018
LT12.12.2018
LV12.12.2018
NL12.12.2018
PL12.12.2018
SE12.12.2018
BG12.03.2019
GR13.03.2019
PT12.04.2019
Former [2019/34]ES12.12.2018
FI12.12.2018
IT12.12.2018
LT12.12.2018
LV12.12.2018
NL12.12.2018
SE12.12.2018
BG12.03.2019
GR13.03.2019
PT12.04.2019
Former [2019/33]ES12.12.2018
FI12.12.2018
LT12.12.2018
LV12.12.2018
NL12.12.2018
SE12.12.2018
BG12.03.2019
GR13.03.2019
PT12.04.2019
Former [2019/30]ES12.12.2018
FI12.12.2018
LT12.12.2018
LV12.12.2018
NL12.12.2018
SE12.12.2018
BG12.03.2019
GR13.03.2019
Former [2019/24]ES12.12.2018
FI12.12.2018
LT12.12.2018
LV12.12.2018
SE12.12.2018
BG12.03.2019
GR13.03.2019
Former [2019/23]ES12.12.2018
FI12.12.2018
LT12.12.2018
LV12.12.2018
BG12.03.2019
Former [2019/22]FI12.12.2018
LT12.12.2018
BG12.03.2019
Former [2019/21]FI12.12.2018
LT12.12.2018
Former [2019/20]LT12.12.2018
Documents cited:Search[X]EP0865180  (LUCENT TECHNOLOGIES INC [US]) [X] 1-18 * abstract * * column 1, line 41 - column 5, line 49; figures 1-3 * * column 6, line 35 - column 13, line 21; figures 4,5 *;
 [A]US2002002622  (VANGE MARK [CA], et al) [A] 1-18 * abstract * * paragraphs [0034] - [0048]; figures 1,2 * * paragraphs [0052] - [0076]; figure 3 *;
 [X]US2003033412  (SUNDARESAN SHARAD [US], et al) [X] 1-18 * abstract * * paragraphs [0006] - [0008] * * paragraphs [0024] - [0043]; figures 2,3 *;
 [X]WO2006002660  (SIEMENS AG [DE], et al) [X] 1-18 * abstract * * page 1, line 30 - page 4, line 9 * * page 7, line 26 - page 8, line 15; figures 1,2 * * page 9, line 32 - page 14, line 10; figures 3,4 *;
 [A]  - TUEXEN M ET AL, "Architecture for Reliable Server Pooling", IETF STANDARD-WORKING-DRAFT, INTERNET ENGINEERING TASK FORCE, IETF, CH, (20041024), vol. rserpool, no. 8, ISSN 0000-0004, XP015026896 [A] 1-18 * the whole document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.