blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1921722

EP1921722 - Switching cabinet for an electrical installation distribution system [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  10.10.2014
Database last updated on 30.09.2024
Most recent event   Tooltip15.07.2016Lapse of the patent in a contracting state
New state(s): MT
published on 17.08.2016  [2016/33]
Applicant(s)For all designated states
ABB AG
Kallstadter Strasse 1
68309 Mannheim / DE
[N/P]
Former [2013/18]For all designated states
ABB AG
Kallstadter Str. 1
68309 Mannheim / DE
Former [2008/20]For all designated states
ABB PATENT GmbH
Wallstadter Strasse 59
68526 Ladenburg / DE
Inventor(s)01 / Lott, Günther
Am Waldhag 16
77839 Lichtenau / DE
 [2008/20]
Representative(s)Miller, Toivo
ABB Patent GmbH
Wallstadter Strasse 59
68526 Ladenburg / DE
[N/P]
Former [2008/20]Miller, Toivo
ABB Patent GmbH, Wallstadter Strasse 59
68526 Ladenburg / DE
Application number, filing date07020784.024.10.2007
[2008/20]
Priority number, dateDE2006105335810.11.2006         Original published format: DE102006053358
[2008/20]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP1921722
Date:14.05.2008
Language:DE
[2008/20]
Type: B1 Patent specification 
No.:EP1921722
Date:04.12.2013
Language:DE
[2013/49]
Search report(s)(Supplementary) European search report - dispatched on:EP03.03.2008
ClassificationIPC:H02B1/30
[2008/20]
CPC:
H02B1/30 (EP)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MT,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2008/20]
TitleGerman:Schaltschrank für eine elektrische Installationsverteilung[2008/20]
English:Switching cabinet for an electrical installation distribution system[2008/20]
French:Armoire électrique pour distribution électrique[2008/20]
Examination procedure29.09.2008Examination requested  [2008/46]
16.12.2008Despatch of a communication from the examining division (Time limit: M06)
04.08.2009Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time
24.08.2009Reply to a communication from the examining division
04.10.2012Despatch of a communication from the examining division (Time limit: M06)
12.04.2013Reply to a communication from the examining division
19.08.2013Communication of intention to grant the patent
09.10.2013Fee for grant paid
09.10.2013Fee for publishing/printing paid
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  16.12.2008
Opposition(s)05.09.2014No opposition filed within time limit [2014/46]
Request for further processing for:The application is deemed to be withdrawn due to failure to reply to the examination report
17.08.2009Request for further processing filed
17.08.2009Full payment received (date of receipt of payment)
Fees paidRenewal fee
27.10.2009Renewal fee patent year 03
25.10.2010Renewal fee patent year 04
20.10.2011Renewal fee patent year 05
23.10.2012Renewal fee patent year 06
24.10.2013Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU24.10.2007
BG04.12.2013
CY04.12.2013
CZ04.12.2013
DK04.12.2013
EE04.12.2013
ES04.12.2013
FI04.12.2013
IT04.12.2013
LT04.12.2013
LV04.12.2013
MC04.12.2013
MT04.12.2013
NL04.12.2013
PL04.12.2013
RO04.12.2013
SE04.12.2013
SI04.12.2013
SK04.12.2013
TR04.12.2013
GR05.03.2014
IS04.04.2014
PT04.04.2014
[2016/33]
Former [2016/32]HU24.10.2007
BG04.12.2013
CY04.12.2013
CZ04.12.2013
DK04.12.2013
EE04.12.2013
ES04.12.2013
FI04.12.2013
IT04.12.2013
LT04.12.2013
LV04.12.2013
MC04.12.2013
NL04.12.2013
PL04.12.2013
RO04.12.2013
SE04.12.2013
SI04.12.2013
SK04.12.2013
TR04.12.2013
GR05.03.2014
IS04.04.2014
PT04.04.2014
Former [2016/28]BG04.12.2013
CY04.12.2013
CZ04.12.2013
DK04.12.2013
EE04.12.2013
ES04.12.2013
FI04.12.2013
IT04.12.2013
LT04.12.2013
LV04.12.2013
MC04.12.2013
NL04.12.2013
PL04.12.2013
RO04.12.2013
SE04.12.2013
SI04.12.2013
SK04.12.2013
GR05.03.2014
IS04.04.2014
PT04.04.2014
Former [2016/25]BG04.12.2013
CY04.12.2013
CZ04.12.2013
DK04.12.2013
EE04.12.2013
ES04.12.2013
FI04.12.2013
IT04.12.2013
LT04.12.2013
LV04.12.2013
MC04.12.2013
NL04.12.2013
PL04.12.2013
RO04.12.2013
SE04.12.2013
SI04.12.2013
SK04.12.2013
IS04.04.2014
PT04.04.2014
Former [2015/37]CY04.12.2013
CZ04.12.2013
DK04.12.2013
EE04.12.2013
ES04.12.2013
FI04.12.2013
IT04.12.2013
LT04.12.2013
LV04.12.2013
MC04.12.2013
NL04.12.2013
PL04.12.2013
RO04.12.2013
SE04.12.2013
SI04.12.2013
SK04.12.2013
IS04.04.2014
PT04.04.2014
Former [2015/27]CY04.12.2013
CZ04.12.2013
DK04.12.2013
EE04.12.2013
ES04.12.2013
FI04.12.2013
LT04.12.2013
LV04.12.2013
MC04.12.2013
NL04.12.2013
PL04.12.2013
RO04.12.2013
SE04.12.2013
SI04.12.2013
SK04.12.2013
IS04.04.2014
PT04.04.2014
Former [2015/14]CY04.12.2013
CZ04.12.2013
DK04.12.2013
EE04.12.2013
ES04.12.2013
FI04.12.2013
LT04.12.2013
LV04.12.2013
NL04.12.2013
PL04.12.2013
RO04.12.2013
SE04.12.2013
SI04.12.2013
SK04.12.2013
IS04.04.2014
PT04.04.2014
Former [2014/48]CY04.12.2013
CZ04.12.2013
DK04.12.2013
EE04.12.2013
ES04.12.2013
FI04.12.2013
LT04.12.2013
LV04.12.2013
NL04.12.2013
PL04.12.2013
RO04.12.2013
SE04.12.2013
SK04.12.2013
IS04.04.2014
PT04.04.2014
Former [2014/37]CY04.12.2013
CZ04.12.2013
EE04.12.2013
ES04.12.2013
FI04.12.2013
LT04.12.2013
LV04.12.2013
NL04.12.2013
PL04.12.2013
RO04.12.2013
SE04.12.2013
SK04.12.2013
IS04.04.2014
PT04.04.2014
Former [2014/36]CY04.12.2013
EE04.12.2013
FI04.12.2013
LT04.12.2013
LV04.12.2013
NL04.12.2013
SE04.12.2013
IS04.04.2014
Former [2014/26]CY04.12.2013
FI04.12.2013
LT04.12.2013
LV04.12.2013
NL04.12.2013
SE04.12.2013
Former [2014/25]FI04.12.2013
LT04.12.2013
LV04.12.2013
NL04.12.2013
SE04.12.2013
Former [2014/22]FI04.12.2013
LT04.12.2013
NL04.12.2013
SE04.12.2013
Former [2014/20]LT04.12.2013
Documents cited:Search[X]US5584406  (BESSERER HORST [DE], et al) [X] 1-15 * column 3, lines 3-15 * * column 4, lines 1-10; figure - *;
 [X]US2003146011  (THIELMANN BODO [DE], et al) [X] 1-15 * paragraph [0021]; figure - *;
 [A]DE20315619U  (TSAI CHIANG HAI [TW]) [A] 2-13* paragraph [0010]; figure - *;
 [X]EP1583192  (SCHNEIDER ELECTRIC IND SAS [FR]) [X] 1-15 * paragraphs [0009] , [0011]; figure - *
by applicantUS5584406
 US2003146011
 EP1583192
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.