EP1970949 - Method of manufacturing bonded wafer [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 26.01.2018 Database last updated on 06.07.2024 | |
Former | The patent has been granted Status updated on 17.02.2017 | ||
Former | Grant of patent is intended Status updated on 01.12.2016 | Most recent event Tooltip | 06.03.2020 | Lapse of the patent in a contracting state New state(s): TR | published on 08.04.2020 [2020/15] | Applicant(s) | For all designated states SUMCO Corporation 2-1, Shibaura 1-chome, Minato-ku Tokyo 105-8634 / JP | [2017/12] |
Former [2008/38] | For all designated states SUMCO Corporation 2-1, Shibaura 1-chome, Minato-ku Tokyo 105-8634 / JP | Inventor(s) | 01 /
Morimoto, Nobuyuki SUMCO CORPORATION 2-1, Shibaura 1-chome Minato-ku Tokyo 105-8634 / JP | 02 /
Endo, Akihiko SUMCO CORPORATION 2-1, Shibaura 1-chome Minato-ku Tokyo 105-8634 / JP | [2017/12] |
Former [2008/38] | 01 /
Morimoto, Nubuyuki SUMO CORPORATION 2-1, Shibaura 1-chome Minato-ku Tokyo 105-8634 / JP | ||
02 /
Endo, Akihiko SUMO CORPORATION 2-1, Shibaura 1-chome Minato-ku Tokyo 105-8634 / JP | Representative(s) | Godemeyer Blum Lenze Patentanwälte Partnerschaft mbB - werkpatent An den Gärten 7 51491 Overath / DE | [2017/12] |
Former [2013/52] | Godemeyer Blum Lenze - werkpatent An den Gärten 7 51491 Overath / DE | ||
Former [2012/02] | Polypatent An den Gärten 7 51491 Overath / DE | ||
Former [2010/02] | Polypatent Postfach 40 02 43 51410 Bergisch Gladbach / DE | ||
Former [2008/38] | Polypatent An den Gärten 7 51491 Overath / DE | Application number, filing date | 07024471.0 | 18.12.2007 | [2008/38] | Priority number, date | JP20070064482 | 14.03.2007 Original published format: JP 2007064482 | [2008/38] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP1970949 | Date: | 17.09.2008 | Language: | EN | [2008/38] | Type: | A3 Search report | No.: | EP1970949 | Date: | 22.06.2011 | [2011/25] | Type: | B1 Patent specification | No.: | EP1970949 | Date: | 22.03.2017 | Language: | EN | [2017/12] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 19.05.2011 | Classification | IPC: | H01L21/762, H01L21/02, H01L21/20, H01L21/306 | [2008/38] | CPC: |
H01L21/02052 (EP,US);
H01L21/20 (KR);
H01L21/2007 (EP,US);
H01L21/76256 (EP,US);
H01L27/12 (KR)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, PL, PT, RO, SE, SI, SK, TR [2017/12] |
Former [2008/38] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, PL, PT, RO, SE, SI, SK, TR | Title | German: | Verfahren zur Herstellung eines Verbundswafers | [2016/28] | English: | Method of manufacturing bonded wafer | [2008/38] | French: | Procédé de production de plaquette collée | [2016/28] |
Former [2008/38] | Verfahren zur Herstellung eines gebundenen Wafers | ||
Former [2008/38] | Procédé de production de plaquette fixée | Examination procedure | 18.12.2007 | Examination requested [2008/38] | 05.11.2011 | Amendment by applicant (claims and/or description) | 25.03.2013 | Despatch of a communication from the examining division (Time limit: M06) | 26.09.2013 | Reply to a communication from the examining division | 07.04.2014 | Despatch of a communication from the examining division (Time limit: M04) | 11.07.2014 | Reply to a communication from the examining division | 19.07.2016 | Communication of intention to grant the patent | 24.10.2016 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 02.12.2016 | Communication of intention to grant the patent | 09.02.2017 | Fee for grant paid | 09.02.2017 | Fee for publishing/printing paid | 09.02.2017 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 25.03.2013 | Opposition(s) | 02.01.2018 | No opposition filed within time limit [2018/09] | Fees paid | Renewal fee | 11.12.2009 | Renewal fee patent year 03 | 15.12.2010 | Renewal fee patent year 04 | 12.12.2011 | Renewal fee patent year 05 | 11.12.2012 | Renewal fee patent year 06 | 12.12.2013 | Renewal fee patent year 07 | 11.12.2014 | Renewal fee patent year 08 | 10.12.2015 | Renewal fee patent year 09 | 13.12.2016 | Renewal fee patent year 10 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 18.12.2007 | AT | 22.03.2017 | CY | 22.03.2017 | CZ | 22.03.2017 | DK | 22.03.2017 | EE | 22.03.2017 | ES | 22.03.2017 | FI | 22.03.2017 | IT | 22.03.2017 | LT | 22.03.2017 | LV | 22.03.2017 | MC | 22.03.2017 | NL | 22.03.2017 | PL | 22.03.2017 | RO | 22.03.2017 | SE | 22.03.2017 | SI | 22.03.2017 | SK | 22.03.2017 | TR | 22.03.2017 | BG | 22.06.2017 | GR | 23.06.2017 | IS | 22.07.2017 | PT | 24.07.2017 | GB | 18.12.2017 | IE | 18.12.2017 | LU | 18.12.2017 | MT | 18.12.2017 | BE | 31.12.2017 | CH | 31.12.2017 | LI | 31.12.2017 | [2020/15] |
Former [2019/46] | HU | 18.12.2007 | |
AT | 22.03.2017 | ||
CY | 22.03.2017 | ||
CZ | 22.03.2017 | ||
DK | 22.03.2017 | ||
EE | 22.03.2017 | ||
ES | 22.03.2017 | ||
FI | 22.03.2017 | ||
IT | 22.03.2017 | ||
LT | 22.03.2017 | ||
LV | 22.03.2017 | ||
MC | 22.03.2017 | ||
NL | 22.03.2017 | ||
PL | 22.03.2017 | ||
RO | 22.03.2017 | ||
SE | 22.03.2017 | ||
SI | 22.03.2017 | ||
SK | 22.03.2017 | ||
BG | 22.06.2017 | ||
GR | 23.06.2017 | ||
IS | 22.07.2017 | ||
PT | 24.07.2017 | ||
GB | 18.12.2017 | ||
IE | 18.12.2017 | ||
LU | 18.12.2017 | ||
MT | 18.12.2017 | ||
BE | 31.12.2017 | ||
CH | 31.12.2017 | ||
LI | 31.12.2017 | ||
Former [2019/31] | HU | 18.12.2007 | |
AT | 22.03.2017 | ||
CZ | 22.03.2017 | ||
DK | 22.03.2017 | ||
EE | 22.03.2017 | ||
ES | 22.03.2017 | ||
FI | 22.03.2017 | ||
IT | 22.03.2017 | ||
LT | 22.03.2017 | ||
LV | 22.03.2017 | ||
MC | 22.03.2017 | ||
NL | 22.03.2017 | ||
PL | 22.03.2017 | ||
RO | 22.03.2017 | ||
SE | 22.03.2017 | ||
SI | 22.03.2017 | ||
SK | 22.03.2017 | ||
BG | 22.06.2017 | ||
GR | 23.06.2017 | ||
IS | 22.07.2017 | ||
PT | 24.07.2017 | ||
GB | 18.12.2017 | ||
IE | 18.12.2017 | ||
LU | 18.12.2017 | ||
MT | 18.12.2017 | ||
BE | 31.12.2017 | ||
CH | 31.12.2017 | ||
LI | 31.12.2017 | ||
Former [2019/30] | AT | 22.03.2017 | |
CZ | 22.03.2017 | ||
DK | 22.03.2017 | ||
EE | 22.03.2017 | ||
ES | 22.03.2017 | ||
FI | 22.03.2017 | ||
IT | 22.03.2017 | ||
LT | 22.03.2017 | ||
LV | 22.03.2017 | ||
MC | 22.03.2017 | ||
NL | 22.03.2017 | ||
PL | 22.03.2017 | ||
RO | 22.03.2017 | ||
SE | 22.03.2017 | ||
SI | 22.03.2017 | ||
SK | 22.03.2017 | ||
BG | 22.06.2017 | ||
GR | 23.06.2017 | ||
IS | 22.07.2017 | ||
PT | 24.07.2017 | ||
GB | 18.12.2017 | ||
IE | 18.12.2017 | ||
LU | 18.12.2017 | ||
MT | 18.12.2017 | ||
BE | 31.12.2017 | ||
CH | 31.12.2017 | ||
LI | 31.12.2017 | ||
Former [2018/51] | AT | 22.03.2017 | |
CZ | 22.03.2017 | ||
DK | 22.03.2017 | ||
EE | 22.03.2017 | ||
ES | 22.03.2017 | ||
FI | 22.03.2017 | ||
IT | 22.03.2017 | ||
LT | 22.03.2017 | ||
LV | 22.03.2017 | ||
NL | 22.03.2017 | ||
PL | 22.03.2017 | ||
RO | 22.03.2017 | ||
SE | 22.03.2017 | ||
SI | 22.03.2017 | ||
SK | 22.03.2017 | ||
BG | 22.06.2017 | ||
GR | 23.06.2017 | ||
IS | 22.07.2017 | ||
PT | 24.07.2017 | ||
GB | 18.12.2017 | ||
IE | 18.12.2017 | ||
LU | 18.12.2017 | ||
MT | 18.12.2017 | ||
BE | 31.12.2017 | ||
CH | 31.12.2017 | ||
LI | 31.12.2017 | ||
Former [2018/50] | AT | 22.03.2017 | |
CZ | 22.03.2017 | ||
DK | 22.03.2017 | ||
EE | 22.03.2017 | ||
ES | 22.03.2017 | ||
FI | 22.03.2017 | ||
IT | 22.03.2017 | ||
LT | 22.03.2017 | ||
LV | 22.03.2017 | ||
NL | 22.03.2017 | ||
PL | 22.03.2017 | ||
RO | 22.03.2017 | ||
SE | 22.03.2017 | ||
SI | 22.03.2017 | ||
SK | 22.03.2017 | ||
BG | 22.06.2017 | ||
GR | 23.06.2017 | ||
IS | 22.07.2017 | ||
PT | 24.07.2017 | ||
GB | 18.12.2017 | ||
IE | 18.12.2017 | ||
LU | 18.12.2017 | ||
MT | 18.12.2017 | ||
BE | 31.12.2017 | ||
Former [2018/45] | AT | 22.03.2017 | |
CZ | 22.03.2017 | ||
DK | 22.03.2017 | ||
EE | 22.03.2017 | ||
ES | 22.03.2017 | ||
FI | 22.03.2017 | ||
IT | 22.03.2017 | ||
LT | 22.03.2017 | ||
LV | 22.03.2017 | ||
NL | 22.03.2017 | ||
PL | 22.03.2017 | ||
RO | 22.03.2017 | ||
SE | 22.03.2017 | ||
SI | 22.03.2017 | ||
SK | 22.03.2017 | ||
BG | 22.06.2017 | ||
GR | 23.06.2017 | ||
IS | 22.07.2017 | ||
PT | 24.07.2017 | ||
IE | 18.12.2017 | ||
LU | 18.12.2017 | ||
MT | 18.12.2017 | ||
Former [2018/43] | AT | 22.03.2017 | |
CZ | 22.03.2017 | ||
DK | 22.03.2017 | ||
EE | 22.03.2017 | ||
ES | 22.03.2017 | ||
FI | 22.03.2017 | ||
IT | 22.03.2017 | ||
LT | 22.03.2017 | ||
LV | 22.03.2017 | ||
NL | 22.03.2017 | ||
PL | 22.03.2017 | ||
RO | 22.03.2017 | ||
SE | 22.03.2017 | ||
SI | 22.03.2017 | ||
SK | 22.03.2017 | ||
BG | 22.06.2017 | ||
GR | 23.06.2017 | ||
IS | 22.07.2017 | ||
PT | 24.07.2017 | ||
LU | 18.12.2017 | ||
MT | 18.12.2017 | ||
Former [2018/14] | AT | 22.03.2017 | |
CZ | 22.03.2017 | ||
DK | 22.03.2017 | ||
EE | 22.03.2017 | ||
ES | 22.03.2017 | ||
FI | 22.03.2017 | ||
IT | 22.03.2017 | ||
LT | 22.03.2017 | ||
LV | 22.03.2017 | ||
NL | 22.03.2017 | ||
PL | 22.03.2017 | ||
RO | 22.03.2017 | ||
SE | 22.03.2017 | ||
SI | 22.03.2017 | ||
SK | 22.03.2017 | ||
BG | 22.06.2017 | ||
GR | 23.06.2017 | ||
IS | 22.07.2017 | ||
PT | 24.07.2017 | ||
Former [2018/09] | AT | 22.03.2017 | |
CZ | 22.03.2017 | ||
DK | 22.03.2017 | ||
EE | 22.03.2017 | ||
ES | 22.03.2017 | ||
FI | 22.03.2017 | ||
IT | 22.03.2017 | ||
LT | 22.03.2017 | ||
LV | 22.03.2017 | ||
NL | 22.03.2017 | ||
PL | 22.03.2017 | ||
RO | 22.03.2017 | ||
SE | 22.03.2017 | ||
SK | 22.03.2017 | ||
BG | 22.06.2017 | ||
GR | 23.06.2017 | ||
IS | 22.07.2017 | ||
PT | 24.07.2017 | ||
Former [2017/51] | AT | 22.03.2017 | |
CZ | 22.03.2017 | ||
EE | 22.03.2017 | ||
ES | 22.03.2017 | ||
FI | 22.03.2017 | ||
IT | 22.03.2017 | ||
LT | 22.03.2017 | ||
LV | 22.03.2017 | ||
NL | 22.03.2017 | ||
PL | 22.03.2017 | ||
RO | 22.03.2017 | ||
SE | 22.03.2017 | ||
SK | 22.03.2017 | ||
BG | 22.06.2017 | ||
GR | 23.06.2017 | ||
IS | 22.07.2017 | ||
PT | 24.07.2017 | ||
Former [2017/50] | AT | 22.03.2017 | |
CZ | 22.03.2017 | ||
EE | 22.03.2017 | ||
ES | 22.03.2017 | ||
FI | 22.03.2017 | ||
IT | 22.03.2017 | ||
LT | 22.03.2017 | ||
LV | 22.03.2017 | ||
NL | 22.03.2017 | ||
PL | 22.03.2017 | ||
RO | 22.03.2017 | ||
SE | 22.03.2017 | ||
SK | 22.03.2017 | ||
BG | 22.06.2017 | ||
GR | 23.06.2017 | ||
IS | 22.07.2017 | ||
Former [2017/49] | AT | 22.03.2017 | |
CZ | 22.03.2017 | ||
EE | 22.03.2017 | ||
ES | 22.03.2017 | ||
FI | 22.03.2017 | ||
IT | 22.03.2017 | ||
LT | 22.03.2017 | ||
LV | 22.03.2017 | ||
NL | 22.03.2017 | ||
RO | 22.03.2017 | ||
SE | 22.03.2017 | ||
SK | 22.03.2017 | ||
BG | 22.06.2017 | ||
GR | 23.06.2017 | ||
IS | 22.07.2017 | ||
Former [2017/48] | CZ | 22.03.2017 | |
FI | 22.03.2017 | ||
LT | 22.03.2017 | ||
LV | 22.03.2017 | ||
NL | 22.03.2017 | ||
SE | 22.03.2017 | ||
BG | 22.06.2017 | ||
GR | 23.06.2017 | ||
Former [2017/41] | FI | 22.03.2017 | |
LT | 22.03.2017 | ||
LV | 22.03.2017 | ||
NL | 22.03.2017 | ||
SE | 22.03.2017 | ||
BG | 22.06.2017 | ||
GR | 23.06.2017 | Documents cited: | Search | [A]EP0676796 (CANON KK [JP]) [A] 1-9 * column 14, lines 6-8;15-17 *; | [A]US2004195656 (GHYSELEN BRUNO [FR], et al) [A] 1-9* paragraphs [0051] , [0 52] *; | [X]US2004209441 (MALEVILLE CHRISTOPHE [FR], et al) [X] 1-9 * paragraphs [0015] , [0 23] , [0 24]; claims 1, 7 *; | [A]US2006073644 (ATOJI TADASHI [JP], et al) [A] 1-9 * example 1 * | Examination | US6230720 | US2005079712 | US2006154442 |