blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1845126

EP1845126 - Dual cure resin composite system and method of manufacturing the same [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  20.06.2014
Database last updated on 27.07.2024
Most recent event   Tooltip20.06.2014No opposition filed within time limitpublished on 23.07.2014  [2014/30]
Applicant(s)For all designated states
GENERAL ELECTRIC COMPANY
1 River Road
Schenectady, NY 12345 / US
[2013/33]
Former [2008/38]For all designated states
GENERAL ELECTRIC COMPANY
1 River Road
Schenectady NY 12345 / US
Former [2007/42]For all designated states
General Electric Company
One River Road
Schenectady, NY 12345 / US
Inventor(s)01 / LIN, Wendy-Ling
/ 776 Saint David
Niskayuna, NY 12309 / US
02 / YANG, Wenliang Patrick
/ 8 Birch Hill Road
Ballston Lake, NY 12019 / US
 [2013/33]
Former [2007/42]01 / LIN, Wendy-Ling
776 Saint David
Niskayuna, NY 12309 / US
02 / YANG, Wenliang Patrick
8 Birch Hill Road
Ballston Lake, NY 12019 / US
Representative(s)Bedford, Grant Richard
GPO Europe
GE International Inc. The Ark
201 Talgarth Road
Hammersmith
London W6 8BJ / GB
[2013/33]
Former [2008/38]Bedford, Grant Richard
GE London Patent Operation 15 John Adam Street
London WC2N 6LU / GB
Former [2007/42]Bedford, Grant Richard
London Patent Operation GE International Inc 15 John Adam Street
London WC2N 6LU / GB
Application number, filing date07105592.504.04.2007
[2007/42]
Priority number, dateUS2006040367413.04.2006         Original published format: US 403674
[2007/42]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP1845126
Date:17.10.2007
Language:EN
[2007/42]
Type: A3 Search report 
No.:EP1845126
Date:20.05.2009
[2009/21]
Type: B1 Patent specification 
No.:EP1845126
Date:14.08.2013
Language:EN
[2013/33]
Search report(s)(Supplementary) European search report - dispatched on:EP21.04.2009
ClassificationIPC:C08J5/12
[2007/42]
CPC:
C08J5/12 (EP,US); B32B7/02 (BR); B32B27/00 (BR);
B32B27/08 (BR); B32B27/16 (BR); B32B37/00 (BR);
B32B37/06 (BR); B32B7/00 (BR); B32B7/04 (BR);
B32B7/10 (BR); B29C35/08 (BR); B32B27/26 (BR);
B32B38/18 (BR); C08F2/46 (BR); C08G18/08 (BR);
Y10T428/24058 (EP,US); Y10T428/249921 (EP,US); Y10T428/31536 (EP,US) (-)
Designated contracting statesDE,   DK,   ES,   GB,   NL [2010/04]
Former [2007/42]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MT,  NL,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
TitleGerman:Zweifach gehärtetes Harzverbundsystem und Herstellungsverfahren dafür[2007/42]
English:Dual cure resin composite system and method of manufacturing the same[2007/42]
French:Système composite de résine dual-cure et son procédé de fabrication[2007/42]
Examination procedure20.11.2009Examination requested  [2009/53]
21.11.2009Loss of particular rights, legal effect: designated state(s)
05.01.2010Despatch of communication of loss of particular rights: designated state(s) AT, BE, BG, CH, CY, CZ, EE, FI, FR, GR, HU, IE, IS, IT, LT, LU, LV, MC, MT, PL, PT, RO, SE, SI, SK, TR
27.01.2010Despatch of a communication from the examining division (Time limit: M06)
05.08.2010Reply to a communication from the examining division
21.02.2011Despatch of a communication from the examining division (Time limit: M06)
01.09.2011Reply to a communication from the examining division
24.02.2012Despatch of a communication from the examining division (Time limit: M04)
05.07.2012Reply to a communication from the examining division
20.03.2013Communication of intention to grant the patent
01.07.2013Fee for grant paid
01.07.2013Fee for publishing/printing paid
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  27.01.2010
Opposition(s)15.05.2014No opposition filed within time limit [2014/30]
Fees paidRenewal fee
04.05.2009Renewal fee patent year 03
03.05.2010Renewal fee patent year 04
02.05.2011Renewal fee patent year 05
02.05.2012Renewal fee patent year 06
02.05.2013Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[A]WO02098657  (SAINT GOBAIN PERFORMANCE PLAST [US], et al) [A] 1-10* claim - *;
 [X]WO03078477  (MUSHOVIC JOHN N [US]) [X] 1,3-5,8-10 * claim 1 * * example IV *;
 [X]WO2004035651  (BASF COATINGS AG [DE], et al) [X] 1,3-5,8-10 * claims 1,10,15,19 * * page 42, lines 13-22 * * example - *;
 [A]EP1645607  (LIU KUN-CHUNG [TW]) [A] 1-10 * figure 1 *
by applicantWO03078477
 WO2004035651
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.