blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1884635

EP1884635 - Power transmission device for agricultural or industrial vehicles and method for operating such a power transmission device [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  12.07.2019
Database last updated on 16.09.2024
FormerThe patent has been granted
Status updated on  03.08.2018
FormerGrant of patent is intended
Status updated on  22.03.2018
FormerExamination is in progress
Status updated on  09.12.2016
Most recent event   Tooltip23.07.2021Lapse of the patent in a contracting state
New state(s): MT
published on 25.08.2021  [2021/34]
Applicant(s)For all designated states
Deere & Company
One John Deere Place
Moline, IL 61265 / US
[2018/36]
Former [2008/06]For all designated states
Deere & Company
One John Deere Place
Moline, IL 61265-8098 / US
Inventor(s)01 / Sobotzik Dr., Joachim
Bürgermeister-Wingerter-Str.26a
67245, Lambsheim / DE
 [2018/36]
Former [2008/06]01 / Sobotzik Dr., Joachim
Bürgermeister-Wingerter-Str.26a
67245, Lambsheim / DE
Representative(s)John Deere GmbH & Co. KG
Global Intellectual Property Services
John-Deere-Straße 70
68163 Mannheim / DE
[N/P]
Former [2018/36]Magin, Ludwig Bernhard, et al
John Deere GmbH & Co. KG
Global Intellectual Property Services
John-Deere-Strasse 70
68163 Mannheim / DE
Former [2008/12]Magin, Ludwig Bernhard, et al
Deere & Company European Office Global Intellectual Property Services John-Deere-Strasse 70
68163 Mannheim / DE
Former [2008/06]Bradl, Joachim
Deere & Company European Office Global Intellectual Property Services John-Deere-Strasse 70
68163 Mannheim / DE
Application number, filing date07113712.902.08.2007
[2008/06]
Priority number, dateDE2006103658904.08.2006         Original published format: DE102006036589
[2008/06]
Filing languageDE
Procedural languageDE
PublicationType: A2 Application without search report 
No.:EP1884635
Date:06.02.2008
Language:DE
[2008/06]
Type: A3 Search report 
No.:EP1884635
Date:03.08.2011
[2011/31]
Type: B1 Patent specification 
No.:EP1884635
Date:05.09.2018
Language:DE
[2018/36]
Search report(s)(Supplementary) European search report - dispatched on:EP30.06.2011
ClassificationIPC:F01P7/04, F02B67/08, // F01P11/10
[2011/30]
CPC:
F01P7/048 (EP,US); F02B67/08 (EP,US); F01P11/10 (EP,US)
Former IPC [2008/06]F01P7/04, // F01P11/10
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MT,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2018/36]
Former [2008/06]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MT,  NL,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
TitleGerman:Antriebsvorrichtung für ein landwirtschaftliches oder industrielles Nutzfahrzeug und Verfahren zum Betreiben einer Antriebsvorrichtung[2008/06]
English:Power transmission device for agricultural or industrial vehicles and method for operating such a power transmission device[2008/06]
French:Dispositif d'entraînement pour un véhicule utilitaire industriel ou agricole et procédé de fonctionnement d'un dispositif d'entraînement[2008/06]
Examination procedure30.01.2012Amendment by applicant (claims and/or description)
03.02.2012Examination requested  [2012/11]
13.12.2016Despatch of a communication from the examining division (Time limit: M04)
05.04.2017Reply to a communication from the examining division
20.03.2018Communication of intention to grant the patent
17.07.2018Fee for grant paid
17.07.2018Fee for publishing/printing paid
17.07.2018Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  13.12.2016
Opposition(s)06.06.2019No opposition filed within time limit [2019/33]
Fees paidRenewal fee
20.07.2009Renewal fee patent year 03
19.07.2010Renewal fee patent year 04
18.07.2011Renewal fee patent year 05
17.07.2012Renewal fee patent year 06
17.07.2013Renewal fee patent year 07
17.07.2014Renewal fee patent year 08
17.07.2015Renewal fee patent year 09
18.07.2016Renewal fee patent year 10
17.07.2017Renewal fee patent year 11
17.07.2018Renewal fee patent year 12
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU02.08.2007
CY05.09.2018
CZ05.09.2018
DK05.09.2018
EE05.09.2018
ES05.09.2018
LT05.09.2018
LV05.09.2018
MC05.09.2018
MT05.09.2018
NL05.09.2018
PL05.09.2018
RO05.09.2018
SI05.09.2018
SK05.09.2018
TR05.09.2018
BG05.12.2018
GR06.12.2018
IS05.01.2019
PT05.01.2019
[2021/34]
Former [2021/32]HU02.08.2007
CY05.09.2018
CZ05.09.2018
DK05.09.2018
EE05.09.2018
ES05.09.2018
LT05.09.2018
LV05.09.2018
MC05.09.2018
NL05.09.2018
PL05.09.2018
RO05.09.2018
SI05.09.2018
SK05.09.2018
TR05.09.2018
BG05.12.2018
GR06.12.2018
IS05.01.2019
PT05.01.2019
Former [2021/26]CY05.09.2018
CZ05.09.2018
DK05.09.2018
EE05.09.2018
ES05.09.2018
LT05.09.2018
LV05.09.2018
MC05.09.2018
NL05.09.2018
PL05.09.2018
RO05.09.2018
SI05.09.2018
SK05.09.2018
TR05.09.2018
BG05.12.2018
GR06.12.2018
IS05.01.2019
PT05.01.2019
Former [2020/25]CZ05.09.2018
DK05.09.2018
EE05.09.2018
ES05.09.2018
LT05.09.2018
LV05.09.2018
MC05.09.2018
NL05.09.2018
PL05.09.2018
RO05.09.2018
SI05.09.2018
SK05.09.2018
TR05.09.2018
BG05.12.2018
GR06.12.2018
IS05.01.2019
PT05.01.2019
Former [2020/17]CZ05.09.2018
DK05.09.2018
EE05.09.2018
ES05.09.2018
LT05.09.2018
LV05.09.2018
NL05.09.2018
PL05.09.2018
RO05.09.2018
SI05.09.2018
SK05.09.2018
TR05.09.2018
BG05.12.2018
GR06.12.2018
IS05.01.2019
PT05.01.2019
Former [2019/37]CZ05.09.2018
DK05.09.2018
EE05.09.2018
ES05.09.2018
LT05.09.2018
LV05.09.2018
NL05.09.2018
PL05.09.2018
RO05.09.2018
SI05.09.2018
SK05.09.2018
BG05.12.2018
GR06.12.2018
IS05.01.2019
PT05.01.2019
Former [2019/34]CZ05.09.2018
DK05.09.2018
EE05.09.2018
ES05.09.2018
LT05.09.2018
LV05.09.2018
NL05.09.2018
PL05.09.2018
RO05.09.2018
SK05.09.2018
BG05.12.2018
GR06.12.2018
IS05.01.2019
PT05.01.2019
Former [2019/26]CZ05.09.2018
EE05.09.2018
ES05.09.2018
LT05.09.2018
LV05.09.2018
NL05.09.2018
PL05.09.2018
RO05.09.2018
SK05.09.2018
BG05.12.2018
GR06.12.2018
IS05.01.2019
PT05.01.2019
Former [2019/24]CZ05.09.2018
EE05.09.2018
ES05.09.2018
LT05.09.2018
LV05.09.2018
NL05.09.2018
PL05.09.2018
RO05.09.2018
SK05.09.2018
BG05.12.2018
GR06.12.2018
IS05.01.2019
Former [2019/22]CZ05.09.2018
ES05.09.2018
LT05.09.2018
LV05.09.2018
NL05.09.2018
PL05.09.2018
RO05.09.2018
BG05.12.2018
GR06.12.2018
IS05.01.2019
Former [2019/21]ES05.09.2018
LT05.09.2018
LV05.09.2018
NL05.09.2018
BG05.12.2018
GR06.12.2018
IS05.01.2019
Former [2019/20]ES05.09.2018
LT05.09.2018
LV05.09.2018
NL05.09.2018
BG05.12.2018
GR06.12.2018
Former [2019/13]ES05.09.2018
LT05.09.2018
LV05.09.2018
BG05.12.2018
GR06.12.2018
Former [2019/11]LT05.09.2018
BG05.12.2018
GR06.12.2018
Former [2019/07]LT05.09.2018
Documents cited:Search[X]JPS63186910  (KUBOTA LTD) [X] 1,5,20-22 * abstract * * figure - *;
 [Y]US5415134  (STEWART JR HOWARD C [US]) [Y] 3,4,6,17-19 * abstract * * figures 1-11 *;
 [XYI]JPH11241368  (CATERPILLAR MITSUBISHI LTD) [X] 1,2,5,7-9,13,14,16,22 * abstract * * figure - * [Y] 3,4,6,17-19 [I] 10-12,15;
 [XYI]JP2000203274  (CATERPILLAR MITSUBISHI LTD) [X] 1,2,5,7-9,13,16,22 * abstract * * figure - * [Y] 3,4,6,17-19 [I] 10-12,14,15;
 [X]JP2001020740  (DENYO CO LTD) [X] 1,22* figure - *
ExaminationDE3043477
 EP1241358
 US2005284423
by applicantJPS63186910
 US5415134
 JPH11241368
 JP2000203274
 DE102004052023
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.