blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2039557

EP2039557 - Electrical energy recharging device for industrial or transport vehicle, assembly comprising said device and said vehicle, and recharging assembly comprising several of said devices [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  30.03.2018
Database last updated on 23.04.2024
FormerThe patent has been granted
Status updated on  21.04.2017
FormerGrant of patent is intended
Status updated on  14.12.2016
Most recent event   Tooltip29.05.2020Lapse of the patent in a contracting state
New state(s): PT
published on 01.07.2020  [2020/27]
Applicant(s)For all designated states
Iveco France S.A.
1 Rue des Combats du 24 Août 1944 Porte E
69200 Vénissieux / FR
[2009/13]
Inventor(s)01 / Steffen, Bernard
73 B rue Coste
69300 Caluire et Cuire / FR
 [2009/13]
Representative(s)Franzolin, Luigi, et al
Studio Torta S.p.A.
Via Viotti, 9
10121 Torino / IT
[N/P]
Former [2017/21]Franzolin, Luigi, et al
Studio Torta S.p.A.
Via Viotti, 9
10121 Torino / IT
Former [2009/13]Borsano, Corrado, et al
Notarbartolo & Gervasi S.p.A. Corso di Porta Vittoria, 9
20122 Milano / IT
Application number, filing date07116941.121.09.2007
[2009/13]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP2039557
Date:25.03.2009
Language:EN
[2009/13]
Type: B1 Patent specification 
No.:EP2039557
Date:24.05.2017
Language:EN
[2017/21]
Search report(s)(Supplementary) European search report - dispatched on:EP27.02.2008
ClassificationIPC:B60L11/18, B60M7/00, B60L1/00, B60L1/02, B60L11/00, B60L11/16
[2016/48]
CPC:
B60M7/003 (EP,US); B60L1/003 (EP); B60L1/02 (EP);
B60L50/30 (EP); B60L50/40 (EP); B60L53/14 (EP,US);
B60L53/30 (EP,US); B60L53/36 (EP); B60L53/65 (EP);
B60L2200/18 (EP); B60L2240/12 (EP); Y02T10/70 (EP);
Y02T10/7072 (EP); Y02T90/12 (EP); Y02T90/14 (EP);
Y02T90/167 (EP); Y04S30/14 (EP) (-)
Former IPC [2009/13]B60L11/18, B60M7/00
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MT,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2017/21]
Former [2009/13]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MT,  NL,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
TitleGerman:Vorrichtung zur Wiederaufladung der elektrischen Energie in einem Nutz- oder Transportfahrzeug, Baugruppe mit besagter Vorrichtung sowie besagtem Fahrzeug sowie Wiederaufladungsanordnung mit mehreren Exemplaren der besagten Vorrichtung[2009/13]
English:Electrical energy recharging device for industrial or transport vehicle, assembly comprising said device and said vehicle, and recharging assembly comprising several of said devices[2009/13]
French:Dispositif de recharge d'énergie électrique pour véhicule industriel ou transport, ensemble comportant un tel dispositif et ledit véhicule, et ensemble de recharge comportant plusieurs de ces dispositifs[2009/13]
Examination procedure23.09.2009Examination requested  [2009/45]
04.11.2009Despatch of a communication from the examining division (Time limit: M04)
19.04.2010Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time
30.04.2010Reply to a communication from the examining division
10.06.2010Despatch of a communication from the examining division (Time limit: M04)
27.09.2010Reply to a communication from the examining division
21.11.2011Despatch of a communication from the examining division (Time limit: M04)
20.03.2012Reply to a communication from the examining division
21.04.2016Despatch of a communication from the examining division (Time limit: M04)
22.08.2016Reply to a communication from the examining division
15.12.2016Communication of intention to grant the patent
12.04.2017Fee for grant paid
12.04.2017Fee for publishing/printing paid
12.04.2017Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  04.11.2009
Opposition(s)27.02.2018No opposition filed within time limit [2018/18]
Request for further processing for:The application is deemed to be withdrawn due to failure to reply to the examination report
30.04.2010Request for further processing filed
30.04.2010Full payment received (date of receipt of payment)
Request granted
20.04.2010Decision despatched
Fees paidRenewal fee
01.09.2009Renewal fee patent year 03
30.08.2010Renewal fee patent year 04
05.08.2011Renewal fee patent year 05
01.08.2012Renewal fee patent year 06
29.07.2013Renewal fee patent year 07
12.09.2014Renewal fee patent year 08
24.09.2015Renewal fee patent year 09
26.09.2016Renewal fee patent year 10
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU21.09.2007
AT24.05.2017
CY24.05.2017
CZ24.05.2017
DK24.05.2017
EE24.05.2017
FI24.05.2017
LT24.05.2017
LV24.05.2017
MC24.05.2017
PL24.05.2017
PT24.05.2017
RO24.05.2017
SI24.05.2017
SK24.05.2017
TR24.05.2017
BG24.08.2017
GR25.08.2017
IE21.09.2017
LU21.09.2017
MT21.09.2017
IS24.09.2017
BE30.09.2017
CH30.09.2017
LI30.09.2017
[2020/27]
Former [2020/15]HU21.09.2007
AT24.05.2017
CY24.05.2017
CZ24.05.2017
DK24.05.2017
EE24.05.2017
FI24.05.2017
LT24.05.2017
LV24.05.2017
MC24.05.2017
PL24.05.2017
RO24.05.2017
SI24.05.2017
SK24.05.2017
TR24.05.2017
BG24.08.2017
GR25.08.2017
IE21.09.2017
LU21.09.2017
MT21.09.2017
IS24.09.2017
BE30.09.2017
CH30.09.2017
LI30.09.2017
Former [2019/46]HU21.09.2007
AT24.05.2017
CY24.05.2017
CZ24.05.2017
DK24.05.2017
EE24.05.2017
FI24.05.2017
LT24.05.2017
LV24.05.2017
MC24.05.2017
PL24.05.2017
RO24.05.2017
SI24.05.2017
SK24.05.2017
BG24.08.2017
GR25.08.2017
IE21.09.2017
LU21.09.2017
MT21.09.2017
IS24.09.2017
BE30.09.2017
CH30.09.2017
LI30.09.2017
Former [2019/31]HU21.09.2007
AT24.05.2017
CZ24.05.2017
DK24.05.2017
EE24.05.2017
FI24.05.2017
LT24.05.2017
LV24.05.2017
MC24.05.2017
PL24.05.2017
RO24.05.2017
SI24.05.2017
SK24.05.2017
BG24.08.2017
GR25.08.2017
IE21.09.2017
LU21.09.2017
MT21.09.2017
IS24.09.2017
BE30.09.2017
CH30.09.2017
LI30.09.2017
Former [2018/43]AT24.05.2017
CZ24.05.2017
DK24.05.2017
EE24.05.2017
FI24.05.2017
LT24.05.2017
LV24.05.2017
MC24.05.2017
PL24.05.2017
RO24.05.2017
SI24.05.2017
SK24.05.2017
BG24.08.2017
GR25.08.2017
IE21.09.2017
LU21.09.2017
MT21.09.2017
IS24.09.2017
BE30.09.2017
CH30.09.2017
LI30.09.2017
Former [2018/39]AT24.05.2017
CZ24.05.2017
DK24.05.2017
EE24.05.2017
FI24.05.2017
LT24.05.2017
LV24.05.2017
MC24.05.2017
PL24.05.2017
RO24.05.2017
SI24.05.2017
SK24.05.2017
BG24.08.2017
GR25.08.2017
IE21.09.2017
LU21.09.2017
IS24.09.2017
BE30.09.2017
CH30.09.2017
LI30.09.2017
Former [2018/34]AT24.05.2017
CZ24.05.2017
DK24.05.2017
EE24.05.2017
FI24.05.2017
LT24.05.2017
LV24.05.2017
MC24.05.2017
PL24.05.2017
RO24.05.2017
SI24.05.2017
SK24.05.2017
BG24.08.2017
GR25.08.2017
IE21.09.2017
LU21.09.2017
IS24.09.2017
CH30.09.2017
LI30.09.2017
Former [2018/29]AT24.05.2017
CZ24.05.2017
DK24.05.2017
EE24.05.2017
FI24.05.2017
LT24.05.2017
LV24.05.2017
MC24.05.2017
PL24.05.2017
RO24.05.2017
SI24.05.2017
SK24.05.2017
BG24.08.2017
GR25.08.2017
IS24.09.2017
Former [2018/25]AT24.05.2017
CZ24.05.2017
DK24.05.2017
EE24.05.2017
FI24.05.2017
LT24.05.2017
LV24.05.2017
PL24.05.2017
RO24.05.2017
SI24.05.2017
SK24.05.2017
BG24.08.2017
GR25.08.2017
IS24.09.2017
Former [2018/11]AT24.05.2017
CZ24.05.2017
DK24.05.2017
EE24.05.2017
FI24.05.2017
LT24.05.2017
LV24.05.2017
PL24.05.2017
RO24.05.2017
SK24.05.2017
BG24.08.2017
GR25.08.2017
IS24.09.2017
Former [2018/10]AT24.05.2017
CZ24.05.2017
DK24.05.2017
EE24.05.2017
FI24.05.2017
LT24.05.2017
LV24.05.2017
RO24.05.2017
SK24.05.2017
BG24.08.2017
GR25.08.2017
IS24.09.2017
Former [2018/09]AT24.05.2017
DK24.05.2017
EE24.05.2017
FI24.05.2017
LT24.05.2017
LV24.05.2017
BG24.08.2017
GR25.08.2017
IS24.09.2017
Former [2017/50]AT24.05.2017
FI24.05.2017
LT24.05.2017
LV24.05.2017
BG24.08.2017
GR25.08.2017
IS24.09.2017
Former [2017/49]AT24.05.2017
FI24.05.2017
LT24.05.2017
GR25.08.2017
IS24.09.2017
Documents cited:Search[A]GB2185866  (CITY WHEELS LTD) [A] 1-16* the whole document *;
 [X]EP0788212  (SUMITOMO WIRING SYSTEMS [JP]) [X] 1-16 * column 10, line 9 - column 13, line 52; figures 1-14 *;
 [X]EP1205340  (MOULD ADRIAN ROBERT [GB]) [X] 1-4,12 * the whole document *
ExaminationCH688599
 CH688598
by applicantEP1205340
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.