blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2052846

EP2052846 - Method of forming a T-shaped composite structure comprising a radius filler and radius filler [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  17.10.2014
Database last updated on 02.09.2024
Most recent event   Tooltip15.07.2016Lapse of the patent in a contracting state
New state(s): MT
published on 17.08.2016  [2016/33]
Applicant(s)For all designated states
SAAB AB
581 88 Linköping / SE
[2009/18]
Inventor(s)01 / Petersson, Mikael
Ullstämmavägen 122
589 51 Linköping / SE
02 / Hallander, Per
Fanjunkaregatan 29
582 16 Linköping / SE
03 / Weidmann, Björn
Vråkgatan 4
590 29 Borensberg / SE
 [2013/49]
Former [2009/18]01 / Petersson, Mikael
Ullstämmavägen 122
589 51 Linköping / SE
02 / Hallander, Per
Kaptensgatan 19B
582 12 Linköping / SE
03 / Weidmann, Björn
Vråkgatan 4
590 31 Borensberg / SE
Representative(s)Zacco Sweden AB
P.O. Box 5581
Löjtnantsgatan 21
114 85 Stockholm / SE
[N/P]
Former [2014/45]Zacco Sweden AB
Valhallavägen 117
P.O. Box 5581
114 85 Stockholm / SE
Former [2013/50]Norberg, Charlotte
Zacco Sweden AB
P.O. Box 5581
114 85 Stockholm / SE
Former [2009/18]Norberg, Charlotte
Albihns AB P.O. Box 5581
114 85 Stockholm / SE
Application number, filing date07119322.125.10.2007
[2009/18]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP2052846
Date:29.04.2009
Language:EN
[2009/18]
Type: B1 Patent specification 
No.:EP2052846
Date:11.12.2013
Language:EN
[2013/50]
Search report(s)(Supplementary) European search report - dispatched on:EP28.04.2008
ClassificationIPC:B29D99/00, // B29C35/02
[2013/30]
CPC:
B29D99/0005 (EP,US); B29C2791/001 (EP,US); B29C35/0266 (EP,US);
Y10T428/197 (EP,US)
Former IPC [2009/18]B29D31/00
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MT,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2009/18]
TitleGerman:Verfahren zur Herstellung einer T-förmigen Verbundstruktur mit einem Füllmaterial und Radiusfüllmaterial[2009/18]
English:Method of forming a T-shaped composite structure comprising a radius filler and radius filler[2009/18]
French:Procédé fabrication d'une structure composite en forme de T comprenant un matériau de remplissage et matériau de remplissage[2009/18]
Examination procedure07.10.2009Examination requested  [2009/47]
04.11.2009Despatch of a communication from the examining division (Time limit: M04)
08.01.2010Reply to a communication from the examining division
04.07.2013Communication of intention to grant the patent
25.10.2013Fee for grant paid
25.10.2013Fee for publishing/printing paid
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  04.11.2009
Opposition(s)12.09.2014No opposition filed within time limit [2014/47]
Fees paidRenewal fee
22.10.2009Renewal fee patent year 03
19.10.2010Renewal fee patent year 04
24.10.2011Renewal fee patent year 05
15.10.2012Renewal fee patent year 06
15.10.2013Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU25.10.2007
AT11.12.2013
BE11.12.2013
BG11.12.2013
CY11.12.2013
CZ11.12.2013
DK11.12.2013
EE11.12.2013
FI11.12.2013
LT11.12.2013
LV11.12.2013
MC11.12.2013
MT11.12.2013
NL11.12.2013
PL11.12.2013
RO11.12.2013
SE11.12.2013
SI11.12.2013
SK11.12.2013
TR11.12.2013
GR12.03.2014
IS11.04.2014
PT11.04.2014
[2016/33]
Former [2016/32]HU25.10.2007
AT11.12.2013
BE11.12.2013
BG11.12.2013
CY11.12.2013
CZ11.12.2013
DK11.12.2013
EE11.12.2013
FI11.12.2013
LT11.12.2013
LV11.12.2013
MC11.12.2013
NL11.12.2013
PL11.12.2013
RO11.12.2013
SE11.12.2013
SI11.12.2013
SK11.12.2013
TR11.12.2013
GR12.03.2014
IS11.04.2014
PT11.04.2014
Former [2016/28]AT11.12.2013
BE11.12.2013
BG11.12.2013
CY11.12.2013
CZ11.12.2013
DK11.12.2013
EE11.12.2013
FI11.12.2013
LT11.12.2013
LV11.12.2013
MC11.12.2013
NL11.12.2013
PL11.12.2013
RO11.12.2013
SE11.12.2013
SI11.12.2013
SK11.12.2013
GR12.03.2014
IS11.04.2014
PT11.04.2014
Former [2016/25]AT11.12.2013
BE11.12.2013
BG11.12.2013
CY11.12.2013
CZ11.12.2013
DK11.12.2013
EE11.12.2013
FI11.12.2013
LT11.12.2013
LV11.12.2013
MC11.12.2013
NL11.12.2013
PL11.12.2013
RO11.12.2013
SE11.12.2013
SI11.12.2013
SK11.12.2013
IS11.04.2014
PT11.04.2014
Former [2015/27]AT11.12.2013
BE11.12.2013
CY11.12.2013
CZ11.12.2013
DK11.12.2013
EE11.12.2013
FI11.12.2013
LT11.12.2013
LV11.12.2013
MC11.12.2013
NL11.12.2013
PL11.12.2013
RO11.12.2013
SE11.12.2013
SI11.12.2013
SK11.12.2013
IS11.04.2014
PT11.04.2014
Former [2015/14]AT11.12.2013
BE11.12.2013
CY11.12.2013
CZ11.12.2013
DK11.12.2013
EE11.12.2013
FI11.12.2013
LT11.12.2013
LV11.12.2013
NL11.12.2013
PL11.12.2013
RO11.12.2013
SE11.12.2013
SI11.12.2013
SK11.12.2013
IS11.04.2014
PT11.04.2014
Former [2014/48]AT11.12.2013
BE11.12.2013
CY11.12.2013
CZ11.12.2013
DK11.12.2013
EE11.12.2013
FI11.12.2013
LT11.12.2013
LV11.12.2013
NL11.12.2013
PL11.12.2013
RO11.12.2013
SE11.12.2013
SK11.12.2013
IS11.04.2014
PT11.04.2014
Former [2014/37]AT11.12.2013
BE11.12.2013
CY11.12.2013
CZ11.12.2013
EE11.12.2013
FI11.12.2013
LT11.12.2013
LV11.12.2013
NL11.12.2013
PL11.12.2013
RO11.12.2013
SE11.12.2013
SK11.12.2013
IS11.04.2014
PT11.04.2014
Former [2014/36]AT11.12.2013
BE11.12.2013
CY11.12.2013
EE11.12.2013
FI11.12.2013
LT11.12.2013
LV11.12.2013
NL11.12.2013
SE11.12.2013
IS11.04.2014
Former [2014/34]AT11.12.2013
BE11.12.2013
CY11.12.2013
FI11.12.2013
LT11.12.2013
LV11.12.2013
NL11.12.2013
SE11.12.2013
Former [2014/26]AT11.12.2013
CY11.12.2013
FI11.12.2013
LT11.12.2013
LV11.12.2013
NL11.12.2013
SE11.12.2013
Former [2014/25]AT11.12.2013
FI11.12.2013
LT11.12.2013
LV11.12.2013
NL11.12.2013
SE11.12.2013
Former [2014/24]AT11.12.2013
FI11.12.2013
LT11.12.2013
NL11.12.2013
SE11.12.2013
Former [2014/22]FI11.12.2013
LT11.12.2013
NL11.12.2013
SE11.12.2013
Former [2014/20]LT11.12.2013
Documents cited:Search[A]US4151031  (GOAD ROBERT C [US], et al) [A] 1-10* column 5, lines 21-60; figures 3,5,6; claims 1,5 *;
 [A]US4219980  (LOYD MORRIS S [US]) [A] 1-10 * column 3, line 52 - column 4, line 6; figures 1,5; claim 8 *;
 [AX]US4559005  (GANTS WILBUR L [US], et al) [A] 1-9 * column 3, line 65 - column 4, line 15; figures 1,2 * * column 4, lines 26-37 * [X] 10
by applicantUS4559005
 US5650229
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.