EP1925764 - Handle for vehicle doors, handle and tool as well as processes for assembling or disassembling this handle [Right-click to bookmark this link] | |||
Former [2008/22] | Handle for vehicle doors, as well as tool and processes for assembling or disassembling this handle | ||
[2018/20] | Status | No opposition filed within time limit Status updated on 13.09.2019 Database last updated on 10.08.2024 | |
Former | The patent has been granted Status updated on 05.10.2018 | ||
Former | Grant of patent is intended Status updated on 07.05.2018 | ||
Former | Request for examination was made Status updated on 15.12.2017 | Most recent event Tooltip | 03.07.2020 | Lapse of the patent in a contracting state New state(s): CY | published on 05.08.2020 [2020/32] | Applicant(s) | For all designated states U-Shin Italia S.p.A. Via Torino 31 10044 Pianezza / IT | [2018/45] |
Former [2014/22] | For all designated states U-Shin Italia S.p.A. Via Torino 31 10044 Pianezza / IT | ||
Former [2008/43] | For all designated states Valeo S.p.A. Via Asti 89 Santena (TO) / IT | ||
Former [2008/22] | For all designated states Valeo Sicurezza Abitacolo S.p.A. Via Asti 89 10026 Santena (TO) / IT | Inventor(s) | 01 /
Lesueur, Guillaume Via Rocciamelone 30 10099 San Mauro Torinese TO / IT | 02 /
Savant, Fiorenzo Via E. Vacchieri 3 10093 Collegno TO / IT | [2008/45] |
Former [2008/22] | 01 /
Savant, Marco Via G. Mazzini 32/R 10091, Alpignano TO / IT | Representative(s) | Delorme, Nicolas, et al Cabinet Germain & Maureau 12, rue Boileau BP 6153 69466 Lyon Cedex 06 / FR | [N/P] |
Former [2018/45] | Gaillarde, Frédéric F. Ch., et al Cabinet Germain & Maureau 31-33, rue de la Baume 75008 Paris / FR | ||
Former [2014/22] | Larger, Solène, et al U-Shin France SAS Service Propriété Industrielle 2-10, rue Claude Nicolas Ledoux 94046 Créteil Cedex / FR | ||
Former [2010/48] | Jacquot, Ludovic R. G., et al Valeo Sécurité Habitacle Propriété Industrielle 76 rue Auguste Perret ZI Europarc 94046 Créteil Cedex / FR | ||
Former [2008/22] | Pizzoli, Antonio Società Italiana Brevetti S.p.A Via Carducci 8 20123 Milano / IT | Application number, filing date | 07120821.9 | 15.11.2007 | [2008/22] | Priority number, date | IT2006MI02252 | 24.11.2006 Original published format: IT MI20062252 | [2008/22] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP1925764 | Date: | 28.05.2008 | Language: | EN | [2008/22] | Type: | A3 Search report | No.: | EP1925764 | Date: | 05.07.2017 | Language: | EN | [2017/27] | Type: | B1 Patent specification | No.: | EP1925764 | Date: | 07.11.2018 | Language: | EN | [2018/45] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 08.06.2017 | Classification | IPC: | E05B85/16, E05B1/00, B25B27/00 | [2018/20] | CPC: |
E05B79/06 (EP);
E05B15/1635 (EP);
E05B85/16 (EP)
|
Former IPC [2008/22] | E05B1/00, E05B65/20, B25B27/00 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, PL, PT, RO, SE, SI, SK, TR [2018/05] |
Former [2018/04] | AT, BE, BG, CH, CY, CZ, LI | ||
Former [2018/03] | AT, BE, BG, CH, CY, LI | ||
Former [2008/22] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, PL, PT, RO, SE, SI, SK, TR | Title | German: | Griff für Fahrzeugtüren, Griff und Werkzeug sowie Verfahren zur Montage und Demontage dieses Griffs | [2018/20] | English: | Handle for vehicle doors, handle and tool as well as processes for assembling or disassembling this handle | [2018/20] | French: | Poignée de portes de véhicule, poignée et outil ainsi que des procédés de montage et de démontage de cette poignée | [2018/20] |
Former [2008/22] | Griff für Fahrzeugtüren, Werkzeug und Verfahren zur Montage und Demontage dieses Griffs | ||
Former [2008/22] | Handle for vehicle doors, as well as tool and processes for assembling or disassembling this handle | ||
Former [2008/22] | Poignée de portes de véhicule, ainsi qu'un outil et des procédés de montage et de démontage de cette poignée | Examination procedure | 15.11.2007 | Date on which the examining division has become responsible | 08.12.2017 | Amendment by applicant (claims and/or description) | 08.12.2017 | Examination requested [2018/03] | 08.05.2018 | Communication of intention to grant the patent | 22.08.2018 | Fee for grant paid | 22.08.2018 | Fee for publishing/printing paid | 22.08.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 08.05.2018 | Opposition(s) | 08.08.2019 | No opposition filed within time limit [2019/42] | Fees paid | Renewal fee | 16.02.2010 | Renewal fee patent year 03 | 14.10.2010 | Renewal fee patent year 04 | 14.10.2011 | Renewal fee patent year 05 | 18.10.2012 | Renewal fee patent year 06 | 23.10.2013 | Renewal fee patent year 07 | 24.10.2014 | Renewal fee patent year 08 | 28.10.2015 | Renewal fee patent year 09 | 26.10.2016 | Renewal fee patent year 10 | 24.10.2017 | Renewal fee patent year 11 | Penalty fee | Additional fee for renewal fee | 30.11.2009 | 03   M06   Fee paid on   16.02.2010 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 15.11.2007 | AT | 07.11.2018 | CY | 07.11.2018 | CZ | 07.11.2018 | DK | 07.11.2018 | EE | 07.11.2018 | ES | 07.11.2018 | FI | 07.11.2018 | LT | 07.11.2018 | LV | 07.11.2018 | MC | 07.11.2018 | NL | 07.11.2018 | PL | 07.11.2018 | RO | 07.11.2018 | SE | 07.11.2018 | SI | 07.11.2018 | SK | 07.11.2018 | TR | 07.11.2018 | IE | 15.11.2018 | LU | 15.11.2018 | MT | 15.11.2018 | BE | 30.11.2018 | CH | 30.11.2018 | LI | 30.11.2018 | BG | 07.02.2019 | GR | 08.02.2019 | IS | 07.03.2019 | PT | 07.03.2019 | [2020/32] |
Former [2020/30] | HU | 15.11.2007 | |
AT | 07.11.2018 | ||
CZ | 07.11.2018 | ||
DK | 07.11.2018 | ||
EE | 07.11.2018 | ||
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
MC | 07.11.2018 | ||
NL | 07.11.2018 | ||
PL | 07.11.2018 | ||
RO | 07.11.2018 | ||
SE | 07.11.2018 | ||
SI | 07.11.2018 | ||
SK | 07.11.2018 | ||
TR | 07.11.2018 | ||
IE | 15.11.2018 | ||
LU | 15.11.2018 | ||
MT | 15.11.2018 | ||
BE | 30.11.2018 | ||
CH | 30.11.2018 | ||
LI | 30.11.2018 | ||
BG | 07.02.2019 | ||
GR | 08.02.2019 | ||
IS | 07.03.2019 | ||
PT | 07.03.2019 | ||
Former [2020/17] | AT | 07.11.2018 | |
CZ | 07.11.2018 | ||
DK | 07.11.2018 | ||
EE | 07.11.2018 | ||
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
MC | 07.11.2018 | ||
NL | 07.11.2018 | ||
PL | 07.11.2018 | ||
RO | 07.11.2018 | ||
SE | 07.11.2018 | ||
SI | 07.11.2018 | ||
SK | 07.11.2018 | ||
TR | 07.11.2018 | ||
IE | 15.11.2018 | ||
LU | 15.11.2018 | ||
MT | 15.11.2018 | ||
BE | 30.11.2018 | ||
CH | 30.11.2018 | ||
LI | 30.11.2018 | ||
BG | 07.02.2019 | ||
GR | 08.02.2019 | ||
IS | 07.03.2019 | ||
PT | 07.03.2019 | ||
Former [2020/08] | AT | 07.11.2018 | |
CZ | 07.11.2018 | ||
DK | 07.11.2018 | ||
EE | 07.11.2018 | ||
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
MC | 07.11.2018 | ||
NL | 07.11.2018 | ||
PL | 07.11.2018 | ||
RO | 07.11.2018 | ||
SE | 07.11.2018 | ||
SI | 07.11.2018 | ||
SK | 07.11.2018 | ||
IE | 15.11.2018 | ||
LU | 15.11.2018 | ||
MT | 15.11.2018 | ||
BE | 30.11.2018 | ||
CH | 30.11.2018 | ||
LI | 30.11.2018 | ||
BG | 07.02.2019 | ||
GR | 08.02.2019 | ||
IS | 07.03.2019 | ||
PT | 07.03.2019 | ||
Former [2019/50] | AT | 07.11.2018 | |
CZ | 07.11.2018 | ||
DK | 07.11.2018 | ||
EE | 07.11.2018 | ||
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
MC | 07.11.2018 | ||
NL | 07.11.2018 | ||
PL | 07.11.2018 | ||
RO | 07.11.2018 | ||
SE | 07.11.2018 | ||
SI | 07.11.2018 | ||
SK | 07.11.2018 | ||
IE | 15.11.2018 | ||
LU | 15.11.2018 | ||
BE | 30.11.2018 | ||
CH | 30.11.2018 | ||
LI | 30.11.2018 | ||
BG | 07.02.2019 | ||
GR | 08.02.2019 | ||
IS | 07.03.2019 | ||
PT | 07.03.2019 | ||
Former [2019/48] | AT | 07.11.2018 | |
CZ | 07.11.2018 | ||
DK | 07.11.2018 | ||
EE | 07.11.2018 | ||
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
MC | 07.11.2018 | ||
NL | 07.11.2018 | ||
PL | 07.11.2018 | ||
RO | 07.11.2018 | ||
SE | 07.11.2018 | ||
SK | 07.11.2018 | ||
IE | 15.11.2018 | ||
LU | 15.11.2018 | ||
CH | 30.11.2018 | ||
LI | 30.11.2018 | ||
BG | 07.02.2019 | ||
GR | 08.02.2019 | ||
IS | 07.03.2019 | ||
PT | 07.03.2019 | ||
Former [2019/40] | AT | 07.11.2018 | |
CZ | 07.11.2018 | ||
DK | 07.11.2018 | ||
EE | 07.11.2018 | ||
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
MC | 07.11.2018 | ||
NL | 07.11.2018 | ||
PL | 07.11.2018 | ||
RO | 07.11.2018 | ||
SE | 07.11.2018 | ||
SK | 07.11.2018 | ||
LU | 15.11.2018 | ||
CH | 30.11.2018 | ||
LI | 30.11.2018 | ||
BG | 07.02.2019 | ||
GR | 08.02.2019 | ||
IS | 07.03.2019 | ||
PT | 07.03.2019 | ||
Former [2019/39] | AT | 07.11.2018 | |
CZ | 07.11.2018 | ||
DK | 07.11.2018 | ||
EE | 07.11.2018 | ||
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
NL | 07.11.2018 | ||
PL | 07.11.2018 | ||
RO | 07.11.2018 | ||
SE | 07.11.2018 | ||
SK | 07.11.2018 | ||
LU | 15.11.2018 | ||
CH | 30.11.2018 | ||
LI | 30.11.2018 | ||
BG | 07.02.2019 | ||
GR | 08.02.2019 | ||
IS | 07.03.2019 | ||
PT | 07.03.2019 | ||
Former [2019/37] | AT | 07.11.2018 | |
CZ | 07.11.2018 | ||
DK | 07.11.2018 | ||
EE | 07.11.2018 | ||
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
NL | 07.11.2018 | ||
PL | 07.11.2018 | ||
RO | 07.11.2018 | ||
SE | 07.11.2018 | ||
LU | 15.11.2018 | ||
BG | 07.02.2019 | ||
GR | 08.02.2019 | ||
IS | 07.03.2019 | ||
PT | 07.03.2019 | ||
Former [2019/35] | AT | 07.11.2018 | |
CZ | 07.11.2018 | ||
DK | 07.11.2018 | ||
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
NL | 07.11.2018 | ||
PL | 07.11.2018 | ||
SE | 07.11.2018 | ||
LU | 15.11.2018 | ||
BG | 07.02.2019 | ||
GR | 08.02.2019 | ||
IS | 07.03.2019 | ||
PT | 07.03.2019 | ||
Former [2019/34] | AT | 07.11.2018 | |
DK | 07.11.2018 | ||
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
NL | 07.11.2018 | ||
SE | 07.11.2018 | ||
LU | 15.11.2018 | ||
BG | 07.02.2019 | ||
GR | 08.02.2019 | ||
IS | 07.03.2019 | ||
PT | 07.03.2019 | ||
Former [2019/26] | AT | 07.11.2018 | |
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
NL | 07.11.2018 | ||
SE | 07.11.2018 | ||
BG | 07.02.2019 | ||
GR | 08.02.2019 | ||
IS | 07.03.2019 | ||
PT | 07.03.2019 | ||
Former [2019/24] | AT | 07.11.2018 | |
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
NL | 07.11.2018 | ||
SE | 07.11.2018 | ||
BG | 07.02.2019 | ||
GR | 08.02.2019 | ||
IS | 07.03.2019 | ||
Former [2019/23] | AT | 07.11.2018 | |
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
NL | 07.11.2018 | ||
BG | 07.02.2019 | ||
IS | 07.03.2019 | ||
Former [2019/22] | FI | 07.11.2018 | |
LT | 07.11.2018 | ||
BG | 07.02.2019 | ||
IS | 07.03.2019 | ||
Former [2019/21] | FI | 07.11.2018 | |
LT | 07.11.2018 | ||
IS | 07.03.2019 | ||
Former [2019/20] | LT | 07.11.2018 | Documents cited: | Search | [A]US2040258 (JACOBI EDWARD N) [A] 1,23,30,34* figure - *; | [XAI]DE3615440 (BAYERISCHE MOTOREN WERKE AG [DE]) [X] 23,24 * column 3, lines 28-52; figure . * [A] 1,30,34 [I] 25-29; | [AD]EP1099817 (VALEO SICUREZZA ABITACOLO SPA [IT]) [AD] 1,30,34 * the whole document *; | [A]EP1416108 (RENAULT SA [FR], et al) [A] 1,23,30,34 * the whole document * |