blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1900863

EP1900863 - Process and installation for manufacturing a textile comprising inner layers and device relating to the same [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  07.05.2010
Database last updated on 11.09.2024
Most recent event   Tooltip07.05.2010Application deemed to be withdrawnpublished on 09.06.2010  [2010/23]
Applicant(s)For all designated states
Asselin-Thibeau
191 Rue des Cinq Voies
59200 Tourcoing / FR
[2008/12]
Inventor(s)01 / Behlouli, Karim
124 Côte Cable
76490 Saint Gilles De Cretot / FR
02 / Louis, Francois
23, rue Fréderic Raux
27370 La Saussaye / FR
 [2008/12]
Representative(s)Pontet, Bernard, et al
Pontet Allano & Associés
Parc Les Algorithmes, Bâtiment Platon
CS 70003 Saint Aubin
91192 Gif sur Yvette Cedex / FR
[N/P]
Former [2008/38]Pontet, Bernard, et al
Pontet Allano & Associés s.e.l.a.r.l. 25, rue Jean-Rostand Parc Club Orsay Université
91893 Orsay Cedex / FR
Former [2008/12]Pontet, Bernard, et al
Pontet Allano & Associés SELARL, 25, rue Jean-Rostand, Parc Club Orsay Université
91893 Orsay Cédex / FR
Application number, filing date07291076.307.09.2007
[2008/12]
Priority number, dateFR2006000811515.09.2006         Original published format: FR 0608115
[2008/12]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report 
No.:EP1900863
Date:19.03.2008
Language:FR
[2008/12]
Search report(s)(Supplementary) European search report - dispatched on:EP04.01.2008
ClassificationIPC:D04H13/00, D01G25/00, D01G15/46, D04H1/74
[2008/12]
CPC:
D01G15/46 (EP); D01G25/00 (EP); D04H1/728 (EP);
D04H1/74 (EP); D04H13/00 (EP)
Designated contracting statesAT,   CH,   CZ,   DE,   FR,   IT,   LI [2008/48]
Former [2008/12]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MT,  NL,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
TitleGerman:Verfahren und Anlage zum Herstellen eines textiles Gebildes mit Zwischenlagen und Vorrichtung[2009/22]
English:Process and installation for manufacturing a textile comprising inner layers and device relating to the same[2008/12]
French:Procédé et installation pour fabriquer un textile comportant des intercouches, et dispositif s'y rapportant[2008/12]
Former [2008/12]Verfahren und Anlage zum Herstellen eines textilen Gebilde mit Zwischenlagen und Vorrichtung
Examination procedure25.08.2008Examination requested  [2008/41]
20.09.2008Loss of particular rights, legal effect: designated state(s)
10.10.2008Despatch of a communication from the examining division (Time limit: M06)
30.10.2008Despatch of communication of loss of particular rights: designated state(s) BE, BG, CY, DK, EE, ES, FI, GB, GR, HU, IE, IS, LT, LU, LV, MC, MT, NL, PL, PT, RO, SE, SI, SK, TR
20.04.2009Reply to a communication from the examining division
31.07.2009Communication of intention to grant the patent
11.12.2009Application deemed to be withdrawn, date of legal effect  [2010/23]
18.01.2010Despatch of communication that the application is deemed to be withdrawn, reason: fee for grant / fee for printing not paid in time  [2010/23]
Fees paidPenalty fee
Additional fee for renewal fee
30.09.200903   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[X]CH239576D  (L. PAYEN & CIE) [X] 1,4,5 * figures 2-4 * * column 1, line 65 - column 2, line 3 * * column 3, lines 5-65 * * column 4, lines 9-15 *;
 [PX]WO2006108363  (ELMARCO SRO [CZ], et al) [PX] 1-11 * figure 2 * * page 4, lines 5-12 * * example - *;
 [A]FR2770855  (ASSELIN [FR]) [A] 1-11 * figures 1,6 *
by applicantWO2006108363
 FR2770855
 CH239576
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.