blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2115893

EP2115893 - MITIGATION OF CO-CHANNEL INTERFERENCE IN A WIRELESS COMMUNICATION SYSTEM [Right-click to bookmark this link]
Former [2009/46]CHARACTERIZATION OF CO-CHANNEL INTERFERENCE IN A WIRELESS COMMUNICATION SYSTEM
[2020/20]
StatusNo opposition filed within time limit
Status updated on  18.03.2022
Database last updated on 03.06.2024
FormerThe patent has been granted
Status updated on  09.04.2021
FormerGrant of patent is intended
Status updated on  15.02.2021
FormerExamination is in progress
Status updated on  22.07.2020
FormerGrant of patent is intended
Status updated on  10.05.2020
FormerExamination is in progress
Status updated on  24.04.2018
Most recent event   Tooltip12.04.2024Lapse of the patent in a contracting state
New state(s): CY
published on 15.05.2024  [2024/20]
Applicant(s)For all designated states
Telecom Italia S.p.A.
Via Gaetano Negri, 1
20123 Milano / IT
[2015/24]
Former [2009/46]For all designated states
Telecom Italia S.p.A.
Piazza degli Affari, 2
20123 Milano / IT
Inventor(s)01 / BARBERIS, Sergio
c/o Telecom Italia S.p.A.
Via G. Reiss Romoli, 274
I-10148 Torino / IT
02 / PRIOTTI, Paolo
c/o Telecom Italia S.p.A.
Via G. Reiss Romoli, 274
I-10148 Torino / IT
 [2021/19]
Former [2009/46]01 / BARBERIS, Sergio
c/o Telecom Italia S.p.A. Via G. Reiss Romoli, 274
I-10148 Torino / IT
02 / PRIOTTI, Paolo
c/o Telecom Italia S.p.A. Via G. Reiss Romoli, 274
I-10148 Torino / IT
Representative(s)Maccalli, Marco, et al
Maccalli & Pezzoli S.r.l.
Via Settembrini, 40
20124 Milano / IT
[2021/19]
Former [2012/42]Maccalli, Marco, et al
Maccalli & Pezzoli S.r.l., Via Settembrini, 40
20124 Milano / IT
Former [2009/46]Bergadano, Mirko, et al
Studio Torta S.r.l. Via Viotti, 9
10121 Torino / IT
Application number, filing date07712202.609.02.2007
[2009/46]
WO2007EP51302
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2008095543
Date:14.08.2008
Language:EN
[2008/33]
Type: A1 Application with search report 
No.:EP2115893
Date:11.11.2009
Language:EN
The application published by WIPO in one of the EPO official languages on 14.08.2008 takes the place of the publication of the European patent application.
[2009/46]
Type: B1 Patent specification 
No.:EP2115893
Date:12.05.2021
Language:EN
[2021/19]
Search report(s)International search report - published on:EP14.08.2008
ClassificationIPC:H04B17/24, H04L27/26, H04W24/00
[2021/01]
CPC:
H04B17/345 (EP,BR,KR,US); H04B17/24 (EP,BR,KR,US); H04L27/2602 (EP,BR,KR,US);
H04W24/08 (KR); H04W28/0236 (KR); H04W72/0453 (KR);
H04W24/00 (EP,BR,US); H04W28/04 (BR,US) (-)
Former IPC [2020/20]H04B17/24, H04L27/26, H04W24/00, H04W24/02
Former IPC [2009/46]H04B7/06
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2021/19]
Former [2009/46]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  NL,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
TitleGerman:MILDERUNG VON CO-KANALSTÖRUNGEN IN EINEM DRAHTLOSEN KOMMUNIKATIONSSYSTEM[2020/21]
English:MITIGATION OF CO-CHANNEL INTERFERENCE IN A WIRELESS COMMUNICATION SYSTEM[2020/20]
French:ATTÉNUATION D'INTERFÉRENCES DE CO-CANAL DANS UN SYSTÈME DE COMMUNICATION SANS FIL[2020/20]
Former [2009/46]CHARAKTERISIERUNG VON KOKANALSTÖRUNGEN IN EINEM DRAHTLOSEN KOMMUNIKATIONSSYSTEM
Former [2009/46]CHARACTERIZATION OF CO-CHANNEL INTERFERENCE IN A WIRELESS COMMUNICATION SYSTEM
Former [2009/46]CARACTÉRISATION D'INTERFÉRENCES DE CO-CANAL DANS UN SYSTÈME DE COMMUNICATION SANS FIL
Entry into regional phase31.08.2009National basic fee paid 
31.08.2009Designation fee(s) paid 
31.08.2009Examination fee paid 
Examination procedure31.08.2009Examination requested  [2009/46]
21.10.2009Amendment by applicant (claims and/or description)
08.06.2011Despatch of a communication from the examining division (Time limit: M06)
19.12.2011Reply to a communication from the examining division
05.04.2012Despatch of a communication from the examining division (Time limit: M06)
04.10.2012Reply to a communication from the examining division
02.10.2015Despatch of a communication from the examining division (Time limit: M06)
18.07.2016Reply to a communication from the examining division
13.04.2018Despatch of a communication from the examining division (Time limit: M06)
20.11.2018Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time
28.01.2019Reply to a communication from the examining division
06.12.2019Despatch of a communication from the examining division (Time limit: M04)
06.04.2020Reply to a communication from the examining division
11.05.2020Communication of intention to grant the patent
21.07.2020Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
12.08.2020Despatch of a communication from the examining division (Time limit: M04)
23.11.2020Reply to a communication from the examining division
16.02.2021Communication of intention to grant the patent
01.04.2021Fee for grant paid
01.04.2021Fee for publishing/printing paid
01.04.2021Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  08.06.2011
Opposition(s)15.02.2022No opposition filed within time limit [2022/16]
Request for further processing for:The application is deemed to be withdrawn due to failure to reply to the examination report
28.01.2019Request for further processing filed
28.01.2019Full payment received (date of receipt of payment)
Request granted
06.02.2019Decision despatched
The application is deemed to be withdrawn due to failure to reply to the examination report
18.07.2016Request for further processing filed
18.07.2016Full payment received (date of receipt of payment)
Request granted
26.07.2016Decision despatched
Fees paidRenewal fee
31.08.2009Renewal fee patent year 03
24.02.2010Renewal fee patent year 04
23.02.2011Renewal fee patent year 05
24.02.2012Renewal fee patent year 06
27.02.2013Renewal fee patent year 07
27.02.2014Renewal fee patent year 08
26.02.2015Renewal fee patent year 09
26.02.2016Renewal fee patent year 10
27.02.2017Renewal fee patent year 11
27.02.2018Renewal fee patent year 12
27.02.2019Renewal fee patent year 13
27.02.2020Renewal fee patent year 14
25.02.2021Renewal fee patent year 15
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU09.02.2007
AT12.05.2021
CY12.05.2021
CZ12.05.2021
DK12.05.2021
EE12.05.2021
ES12.05.2021
FI12.05.2021
LT12.05.2021
LV12.05.2021
MC12.05.2021
NL12.05.2021
PL12.05.2021
RO12.05.2021
SE12.05.2021
SI12.05.2021
SK12.05.2021
BG12.08.2021
GR13.08.2021
IS12.09.2021
PT13.09.2021
IE09.02.2022
LU09.02.2022
[2024/20]
Former [2024/18]HU09.02.2007
AT12.05.2021
CZ12.05.2021
DK12.05.2021
EE12.05.2021
ES12.05.2021
FI12.05.2021
LT12.05.2021
LV12.05.2021
MC12.05.2021
NL12.05.2021
PL12.05.2021
RO12.05.2021
SE12.05.2021
SI12.05.2021
SK12.05.2021
BG12.08.2021
GR13.08.2021
IS12.09.2021
PT13.09.2021
IE09.02.2022
LU09.02.2022
Former [2023/09]AT12.05.2021
CZ12.05.2021
DK12.05.2021
EE12.05.2021
ES12.05.2021
FI12.05.2021
LT12.05.2021
LV12.05.2021
MC12.05.2021
NL12.05.2021
PL12.05.2021
RO12.05.2021
SE12.05.2021
SI12.05.2021
SK12.05.2021
BG12.08.2021
GR13.08.2021
IS12.09.2021
PT13.09.2021
IE09.02.2022
LU09.02.2022
Former [2022/47]AT12.05.2021
CZ12.05.2021
DK12.05.2021
EE12.05.2021
ES12.05.2021
FI12.05.2021
LT12.05.2021
LV12.05.2021
MC12.05.2021
NL12.05.2021
PL12.05.2021
RO12.05.2021
SE12.05.2021
SI12.05.2021
SK12.05.2021
BG12.08.2021
GR13.08.2021
IS12.09.2021
PT13.09.2021
LU09.02.2022
Former [2022/44]AT12.05.2021
CZ12.05.2021
DK12.05.2021
EE12.05.2021
ES12.05.2021
FI12.05.2021
LT12.05.2021
LV12.05.2021
MC12.05.2021
NL12.05.2021
PL12.05.2021
RO12.05.2021
SE12.05.2021
SI12.05.2021
SK12.05.2021
BG12.08.2021
GR13.08.2021
IS12.09.2021
PT13.09.2021
Former [2022/29]AT12.05.2021
CZ12.05.2021
DK12.05.2021
EE12.05.2021
ES12.05.2021
FI12.05.2021
LT12.05.2021
LV12.05.2021
NL12.05.2021
PL12.05.2021
RO12.05.2021
SE12.05.2021
SI12.05.2021
SK12.05.2021
BG12.08.2021
GR13.08.2021
IS12.09.2021
PT13.09.2021
Former [2022/23]AT12.05.2021
CZ12.05.2021
DK12.05.2021
EE12.05.2021
ES12.05.2021
FI12.05.2021
LT12.05.2021
LV12.05.2021
NL12.05.2021
PL12.05.2021
RO12.05.2021
SE12.05.2021
SK12.05.2021
BG12.08.2021
GR13.08.2021
IS12.09.2021
PT13.09.2021
Former [2022/10]AT12.05.2021
CZ12.05.2021
DK12.05.2021
EE12.05.2021
ES12.05.2021
FI12.05.2021
LT12.05.2021
LV12.05.2021
NL12.05.2021
PL12.05.2021
RO12.05.2021
SE12.05.2021
SK12.05.2021
BG12.08.2021
GR13.08.2021
PT13.09.2021
IS22.12.2021
Former [2022/09]AT12.05.2021
CZ12.05.2021
DK12.05.2021
ES12.05.2021
FI12.05.2021
LT12.05.2021
LV12.05.2021
NL12.05.2021
PL12.05.2021
RO12.05.2021
SE12.05.2021
SK12.05.2021
BG12.08.2021
GR13.08.2021
IS12.09.2021
PT13.09.2021
Former [2022/08]AT12.05.2021
CZ12.05.2021
DK12.05.2021
ES12.05.2021
FI12.05.2021
LT12.05.2021
LV12.05.2021
NL12.05.2021
PL12.05.2021
SE12.05.2021
BG12.08.2021
GR13.08.2021
IS12.09.2021
PT13.09.2021
Former [2022/04]AT12.05.2021
ES12.05.2021
FI12.05.2021
LT12.05.2021
LV12.05.2021
NL12.05.2021
PL12.05.2021
SE12.05.2021
BG12.08.2021
GR13.08.2021
IS12.09.2021
PT13.09.2021
Former [2021/52]AT12.05.2021
ES12.05.2021
FI12.05.2021
LT12.05.2021
LV12.05.2021
PL12.05.2021
SE12.05.2021
BG12.08.2021
GR13.08.2021
IS12.09.2021
PT13.09.2021
Former [2021/51]AT12.05.2021
ES12.05.2021
FI12.05.2021
LT12.05.2021
LV12.05.2021
SE12.05.2021
BG12.08.2021
GR13.08.2021
IS12.09.2021
PT13.09.2021
Former [2021/50]AT12.05.2021
FI12.05.2021
LT12.05.2021
LV12.05.2021
SE12.05.2021
BG12.08.2021
GR13.08.2021
PT13.09.2021
Former [2021/49]AT12.05.2021
FI12.05.2021
LT12.05.2021
LV12.05.2021
SE12.05.2021
BG12.08.2021
GR13.08.2021
Former [2021/47]AT12.05.2021
FI12.05.2021
LT12.05.2021
BG12.08.2021
Former [2021/46]AT12.05.2021
FI12.05.2021
LT12.05.2021
Cited inInternational search[Y]US5956642  (LARSSON PER AAKE [SE], et al) [Y] 17-19 * abstract * * column 3, paragraph 6 - paragraph 52 *;
 [Y]WO2005060132  (ELECTRONICS AND TELECOMM [KR], et al) [Y] 21-24 * abstract * * page 4, line 15 - page 6, line 15 * * page 13, line 16 - page 14, line 18 * * page 17, line 9 - page 20, line 16 * * page 23, line 14 - page 24, line 20 * * figures 4,8,12 *;
 [A]WO2005125020  (NORTEL NETWORKS LTD [CA], et al) [A] 21-24 * abstract *;
 [A]US2006039318  (OH HYUN-SEOK [KR], et al) [A] 24 * abstract * * paragraph [0013] - paragraph [0020] *;
 [Y]US2006092054  (LI QINGHUA [US], et al) [Y] 2-4,8 * paragraph [0015] - paragraph [0044] *;
 [A]US2006155533  (LIN XINTIAN E [US], et al) [A] 20 * paragraph [0003] - paragraph [0004] * * paragraph [0012] * * paragraph [0019] - paragraph [0028] *;
 [Y]US2006161432  (ZHANG JIANZHONG [US], et al) [Y] 20 * abstract * * paragraph [0015] * * paragraph [0017] * * paragraph [0037] - paragraph [0040] * * figure 3 *;
 [A]US2006165188  (WUNDER GERHARD [DE], et al) [A] 24* abstract *;
 [A]EP1722512  (SAMSUNG ELECTRONICS CO LTD [KR], et al) [A] 21-24 * abstract *;
 [XY]US2006270360  (HAN JIN-KYU [KR], et al) [X] 1,5-7,28-30 * abstract * * paragraph [0030] - paragraph [0033] * * paragraph [0061] * * paragraph [0068] * * paragraph [0072] - paragraph [0073] * * paragraph [0131] - paragraph [0135] * * figures 1,2,7,8 * [Y] 2-4,8,17-27;
 [Y]  - T. A. THOMAS, X. ZHUANG, F. W. VOOK, K. L. BAUM, M. CUDAK - MOTOROLA LABS, "IEEE C802.16e-04/420: Feedback of Codebook Selection and MIMO Stream Power", IEEE 802.16 BROADBAND WIRELESS ACCESS WORKING GROUP, http://www.ieee802.org/16/tge/contrib/, (20041109), pages 0 - 7, URL: http://www.ieee802.org/16/tge/contrib/C80216e-04_420.pdf, (20071005), XP002453923 [Y] 25-27 * paragraphs 1 and 2 *
Examination   - AFIF OSSEIRAN, "The Winner II Air Interface: Refined Spatial-Temporal Processing Solutions", INTERNET CITATION, (20061130), URL: https://www.ist-winner.org/WINNER2-Deliverables/D3.4.1.pdf, (20070101), XP002441316
    - SIEMENS, "Revised Text Proposal for TR R3.018 on RRM in LTE", 3RD GENERATION PARTNERSHIP PROJECT (3GPP); TECHNICALSPECIFICATION GROUP (TSG) RADIO ACCESS NETWORK (RAN); WORKINGGROUP 3 (WG3), XX, XX, (20060508), pages 1 - 3, XP002419936
    - QUALCOMM EUROPE, "Draft CR to R3.018 in relationship with the PDCP placement", 3GPP DRAFT; R3-070240 R3.018 IMPACT OF PDCP IN ENB, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20070208), vol. RAN WG3, no. St. Louis, Missouri; 20070208, XP050161165
    - ERICSSON, "Stage 2 Description, Radio Resource Management", 3GPP DRAFT; R3-061936, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20061113), vol. RAN WG3, no. Riga, Latvia; 20061113, XP050160814
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.