blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1974122

EP1974122 - DEVICE AND METHOD FOR PRODUCING FOUNDATION ELEMENTS IN THE GROUND [Right-click to bookmark this link]
Former [2008/40]DEVICE AND METHOD FOR PRODUCING SOIL STRUCTURES IN THE GROUND
[2009/50]
StatusNo opposition filed within time limit
Status updated on  18.03.2011
Database last updated on 15.06.2024
Most recent event   Tooltip04.10.2013Lapse of the patent in a contracting state
New state(s): HU
published on 06.11.2013  [2013/45]
Applicant(s)For all designated states
GUD Ingenieurbüro für Spezialtiefbau GmbH
Dudenstrasse 78
10965 Berlin / DE
[2008/40]
Inventor(s)01 / SCHNEIDER, Nikolaus
Dorfblick 6
14552 Wildenbruch / DE
 [2010/19]
Former [2008/40]01 / SCHNEIDER, Nikolaus
Dorfblick 6
14552 Wildenbruck / DE
Representative(s)Hoffmann Eitle
Patent- und Rechtsanwälte PartmbB
Arabellastrasse 30
81925 München / DE
[N/P]
Former [2008/40]HOFFMANN EITLE
Patent- und Rechtsanwälte Arabellastrasse 4
81925 München / DE
Application number, filing date07722760.119.01.2007
[2008/40]
WO2007EP00466
Priority number, dateDE2006100283820.01.2006         Original published format: DE102006002838
[2008/40]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2007101500
Date:13.09.2007
Language:DE
[2007/37]
Type: A1 Application with search report 
No.:EP1974122
Date:01.10.2008
Language:DE
The application published by WIPO in one of the EPO official languages on 13.09.2007 takes the place of the publication of the European patent application.
[2008/40]
Type: B1 Patent specification 
No.:EP1974122
Date:12.05.2010
Language:DE
[2010/19]
Search report(s)International search report - published on:EP13.09.2007
ClassificationIPC:E21B47/08, // E02D5/46, E21B7/18
[2009/50]
CPC:
E21B47/08 (EP,US); E02D5/46 (EP,US); E21B7/18 (EP,US)
Former IPC [2008/40]E21B47/08
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2010/19]
Former [2008/40]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  NL,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
Extension statesALNot yet paid
BANot yet paid
HRNot yet paid
MKNot yet paid
RSNot yet paid
TitleGerman:VORRICHTUNG UND VERFAHREN ZUM HERSTELLEN VON BODENKÖRPERN IM UNTERGRUND[2008/40]
English:DEVICE AND METHOD FOR PRODUCING FOUNDATION ELEMENTS IN THE GROUND[2009/50]
French:DISPOSITIF ET PROCEDE POUR FABRIQUER DES ELEMENTS DE FONDATION DANS LE SOUS-SOL[2009/50]
Former [2008/40]DEVICE AND METHOD FOR PRODUCING SOIL STRUCTURES IN THE GROUND
Former [2008/40]DISPOSITIF ET PROCEDE POUR FABRIQUER DES CORPS DE FONDS DANS LE SOUS-SOL
Entry into regional phase27.06.2008National basic fee paid 
27.06.2008Designation fee(s) paid 
27.06.2008Examination fee paid 
Examination procedure13.11.2007Request for preliminary examination filed
International Preliminary Examining Authority: EP
27.06.2008Examination requested  [2008/40]
22.01.2009Despatch of a communication from the examining division (Time limit: M06)
30.07.2009Reply to a communication from the examining division
11.09.2009Despatch of a communication from the examining division (Time limit: M04)
28.10.2009Reply to a communication from the examining division
25.11.2009Communication of intention to grant the patent
25.03.2010Fee for grant paid
25.03.2010Fee for publishing/printing paid
Opposition(s)15.02.2011No opposition filed within time limit [2011/16]
Fees paidRenewal fee
28.01.2009Renewal fee patent year 03
26.01.2010Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipCZ12.05.2010
DK12.05.2010
EE12.05.2010
FI12.05.2010
HU12.05.2010
IE12.05.2010
LT12.05.2010
LV12.05.2010
NL12.05.2010
PL12.05.2010
RO12.05.2010
SE12.05.2010
SI12.05.2010
SK12.05.2010
TR12.05.2010
CY02.06.2010
BG12.08.2010
GR13.08.2010
ES23.08.2010
IS12.09.2010
PT13.09.2010
GB19.01.2011
LU19.01.2011
BE31.01.2011
CH31.01.2011
LI31.01.2011
MC31.01.2011
[2013/45]
Former [2013/44]CZ12.05.2010
DK12.05.2010
EE12.05.2010
FI12.05.2010
IE12.05.2010
LT12.05.2010
LV12.05.2010
NL12.05.2010
PL12.05.2010
RO12.05.2010
SE12.05.2010
SI12.05.2010
SK12.05.2010
TR12.05.2010
CY02.06.2010
BG12.08.2010
GR13.08.2010
ES23.08.2010
IS12.09.2010
PT13.09.2010
GB19.01.2011
LU19.01.2011
BE31.01.2011
CH31.01.2011
LI31.01.2011
MC31.01.2011
Former [2013/42]CZ12.05.2010
DK12.05.2010
EE12.05.2010
FI12.05.2010
IE12.05.2010
LT12.05.2010
LV12.05.2010
NL12.05.2010
PL12.05.2010
RO12.05.2010
SE12.05.2010
SI12.05.2010
SK12.05.2010
CY02.06.2010
BG12.08.2010
GR13.08.2010
ES23.08.2010
IS12.09.2010
PT13.09.2010
GB19.01.2011
LU19.01.2011
BE31.01.2011
CH31.01.2011
LI31.01.2011
MC31.01.2011
Former [2013/25]CZ12.05.2010
DK12.05.2010
EE12.05.2010
FI12.05.2010
IE12.05.2010
LT12.05.2010
LV12.05.2010
NL12.05.2010
PL12.05.2010
RO12.05.2010
SE12.05.2010
SI12.05.2010
SK12.05.2010
CY02.06.2010
GR13.08.2010
ES23.08.2010
IS12.09.2010
PT13.09.2010
GB19.01.2011
LU19.01.2011
BE31.01.2011
CH31.01.2011
LI31.01.2011
MC31.01.2011
Former [2012/01]CZ12.05.2010
DK12.05.2010
EE12.05.2010
FI12.05.2010
IE12.05.2010
LT12.05.2010
LV12.05.2010
NL12.05.2010
PL12.05.2010
RO12.05.2010
SE12.05.2010
SI12.05.2010
SK12.05.2010
CY02.06.2010
GR13.08.2010
ES23.08.2010
IS12.09.2010
PT13.09.2010
GB19.01.2011
BE31.01.2011
CH31.01.2011
LI31.01.2011
MC31.01.2011
Former [2011/48]CZ12.05.2010
DK12.05.2010
EE12.05.2010
FI12.05.2010
IE12.05.2010
LT12.05.2010
LV12.05.2010
NL12.05.2010
PL12.05.2010
RO12.05.2010
SE12.05.2010
SI12.05.2010
SK12.05.2010
CY02.06.2010
GR13.08.2010
ES23.08.2010
IS12.09.2010
PT13.09.2010
CH31.01.2011
LI31.01.2011
MC31.01.2011
Former [2011/42]CZ12.05.2010
DK12.05.2010
EE12.05.2010
FI12.05.2010
IE12.05.2010
LT12.05.2010
LV12.05.2010
NL12.05.2010
PL12.05.2010
RO12.05.2010
SE12.05.2010
SI12.05.2010
SK12.05.2010
CY02.06.2010
GR13.08.2010
ES23.08.2010
IS12.09.2010
PT13.09.2010
MC31.01.2011
Former [2011/25]CZ12.05.2010
DK12.05.2010
EE12.05.2010
FI12.05.2010
IE12.05.2010
LT12.05.2010
LV12.05.2010
NL12.05.2010
PL12.05.2010
RO12.05.2010
SE12.05.2010
SI12.05.2010
SK12.05.2010
CY02.06.2010
GR13.08.2010
ES23.08.2010
IS12.09.2010
PT13.09.2010
Former [2010/45]NL12.05.2010
Cited inInternational search[A]US5419405  (PATTON BOB J [US]) [A] 1-19* the whole document *;
 [XY]DE19949393  (KELLER GRUNDBAU GMBH [DE]) [X] 1,2,4-7,19 * columns 3,4; figures 1,2 * [Y] 3,8-18;
 [Y]DE10064187  (KELLER GRUNDBAU GMBH [DE]) [Y] 3,8-18 * paragraphs [0012] - [0032]; figure 1 *;
 [A]DE10313912  (KELLER GRUNDBAU GMBH [DE]) [A] 1-19 * the whole document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.