EP2153579 - METHOD FOR PROCESSING SERVICE REQUESTS IN A TELECOMMUNICATIONS SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 13.06.2014 Database last updated on 14.08.2024 | Most recent event Tooltip | 15.07.2016 | Lapse of the patent in a contracting state New state(s): TR | published on 17.08.2016 [2016/33] | Applicant(s) | For all designated states Telefonaktiebolaget LM Ericsson (publ) 164 83 Stockholm / SE | [N/P] |
Former [2010/07] | For all designated states Telefonaktiebolaget L M Ericsson (publ) 164 83 Stockholm / SE | Inventor(s) | 01 /
TERRERO DÍAZ-CHIRÓN, María Esther Avda. El Ferrol, 8, 7 4 E-28029 Madrid / ES | 02 /
ESTEBAN VARES, Nuria Conde de Villamediana, nr. 21 E-28300 Aranjuez / ES | [2010/07] | Representative(s) | Elzaburu Marquez, Alberto Elzaburu S.L.P. Miguel Angel, 21 28010 Madrid / ES | [2013/32] |
Former [2010/07] | Elzaburu Marquez, Alberto Elzaburu S.L.P. Miguel Angel 21 28010 Madrid / ES | ||
Former [2009/52] | Elzaburu Marquez, Alberto Elzaburu S.L.P., Miguel Angel, 21, 2[deg] 28010 Madrid / ES | Application number, filing date | 07729873.5 | 04.06.2007 | [2010/07] | WO2007EP55486 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2008148421 | Date: | 11.12.2008 | Language: | EN | [2008/50] | Type: | A1 Application with search report | No.: | EP2153579 | Date: | 17.02.2010 | Language: | EN | The application published by WIPO in one of the EPO official languages on 11.12.2008 takes the place of the publication of the European patent application. | [2010/07] | Type: | B1 Patent specification | No.: | EP2153579 | Date: | 07.08.2013 | Language: | EN | [2013/32] | Search report(s) | International search report - published on: | EP | 11.12.2008 | Classification | IPC: | H04L12/14 | [2010/07] | CPC: |
H04L12/14 (EP,US);
H04L61/30 (EP,US);
H04L61/4588 (EP,US);
H04L65/80 (EP,US);
H04M15/00 (EP,US);
H04M15/57 (EP,US);
H04M15/85 (EP,US);
H04M15/851 (EP,US);
H04M15/852 (EP,US);
H04M15/853 (EP,US);
H04M15/854 (EP,US);
H04M15/857 (EP,US);
H04L2101/345 (EP,US);
H04L2101/395 (EP,US);
H04L43/16 (EP,US);
H04M2215/208 (EP,US);
H04M2215/815 (EP,US);
H04M2215/8158 (EP,US);
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, PL, PT, RO, SE, SI, SK, TR [2010/07] | Title | German: | VERFAHREN ZUM VERARBEITEN VON DIENSTANFORDERUNGEN IN EINEM TELEKOMMUNIKATIONSSYSTEM | [2010/07] | English: | METHOD FOR PROCESSING SERVICE REQUESTS IN A TELECOMMUNICATIONS SYSTEM | [2010/07] | French: | PROCÉDÉ SERVANT À TRAITER DES DEMANDES DE SERVICE DANS UN SYSTÈME DE TÉLÉCOMMUNICATIONS | [2010/07] | Entry into regional phase | 29.10.2009 | National basic fee paid | 29.10.2009 | Designation fee(s) paid | 29.10.2009 | Examination fee paid | Examination procedure | 18.03.2009 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 29.10.2009 | Examination requested [2010/07] | 28.06.2011 | Despatch of a communication from the examining division (Time limit: M04) | 28.10.2011 | Reply to a communication from the examining division | 21.02.2013 | Communication of intention to grant the patent | 17.05.2013 | Fee for grant paid | 17.05.2013 | Fee for publishing/printing paid | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 28.06.2011 | Opposition(s) | 08.05.2014 | No opposition filed within time limit [2014/29] | Fees paid | Renewal fee | 29.10.2009 | Renewal fee patent year 03 | 25.06.2010 | Renewal fee patent year 04 | 27.06.2011 | Renewal fee patent year 05 | 31.03.2012 | Renewal fee patent year 06 | 27.06.2013 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 04.06.2007 | AT | 07.08.2013 | BE | 07.08.2013 | BG | 07.08.2013 | CY | 07.08.2013 | CZ | 07.08.2013 | DK | 07.08.2013 | EE | 07.08.2013 | ES | 07.08.2013 | FI | 07.08.2013 | IT | 07.08.2013 | LT | 07.08.2013 | LV | 07.08.2013 | MC | 07.08.2013 | MT | 07.08.2013 | NL | 07.08.2013 | PL | 07.08.2013 | RO | 07.08.2013 | SE | 07.08.2013 | SI | 07.08.2013 | SK | 07.08.2013 | TR | 07.08.2013 | GR | 08.11.2013 | IS | 07.12.2013 | PT | 09.12.2013 | [2016/33] |
Former [2016/32] | HU | 04.06.2007 | |
AT | 07.08.2013 | ||
BE | 07.08.2013 | ||
BG | 07.08.2013 | ||
CY | 07.08.2013 | ||
CZ | 07.08.2013 | ||
DK | 07.08.2013 | ||
EE | 07.08.2013 | ||
ES | 07.08.2013 | ||
FI | 07.08.2013 | ||
IT | 07.08.2013 | ||
LT | 07.08.2013 | ||
LV | 07.08.2013 | ||
MC | 07.08.2013 | ||
MT | 07.08.2013 | ||
NL | 07.08.2013 | ||
PL | 07.08.2013 | ||
RO | 07.08.2013 | ||
SE | 07.08.2013 | ||
SI | 07.08.2013 | ||
SK | 07.08.2013 | ||
GR | 08.11.2013 | ||
IS | 07.12.2013 | ||
PT | 09.12.2013 | ||
Former [2016/25] | AT | 07.08.2013 | |
BE | 07.08.2013 | ||
BG | 07.08.2013 | ||
CY | 07.08.2013 | ||
CZ | 07.08.2013 | ||
DK | 07.08.2013 | ||
EE | 07.08.2013 | ||
ES | 07.08.2013 | ||
FI | 07.08.2013 | ||
IT | 07.08.2013 | ||
LT | 07.08.2013 | ||
LV | 07.08.2013 | ||
MC | 07.08.2013 | ||
MT | 07.08.2013 | ||
NL | 07.08.2013 | ||
PL | 07.08.2013 | ||
RO | 07.08.2013 | ||
SE | 07.08.2013 | ||
SI | 07.08.2013 | ||
SK | 07.08.2013 | ||
GR | 08.11.2013 | ||
IS | 07.12.2013 | ||
PT | 09.12.2013 | ||
Former [2016/16] | AT | 07.08.2013 | |
BE | 07.08.2013 | ||
CY | 07.08.2013 | ||
CZ | 07.08.2013 | ||
DK | 07.08.2013 | ||
EE | 07.08.2013 | ||
ES | 07.08.2013 | ||
FI | 07.08.2013 | ||
IT | 07.08.2013 | ||
LT | 07.08.2013 | ||
LV | 07.08.2013 | ||
MC | 07.08.2013 | ||
MT | 07.08.2013 | ||
NL | 07.08.2013 | ||
PL | 07.08.2013 | ||
RO | 07.08.2013 | ||
SE | 07.08.2013 | ||
SI | 07.08.2013 | ||
SK | 07.08.2013 | ||
GR | 08.11.2013 | ||
IS | 07.12.2013 | ||
PT | 09.12.2013 | ||
Former [2015/09] | AT | 07.08.2013 | |
BE | 07.08.2013 | ||
CY | 07.08.2013 | ||
CZ | 07.08.2013 | ||
DK | 07.08.2013 | ||
EE | 07.08.2013 | ||
ES | 07.08.2013 | ||
FI | 07.08.2013 | ||
IT | 07.08.2013 | ||
LT | 07.08.2013 | ||
LV | 07.08.2013 | ||
MC | 07.08.2013 | ||
NL | 07.08.2013 | ||
PL | 07.08.2013 | ||
RO | 07.08.2013 | ||
SE | 07.08.2013 | ||
SI | 07.08.2013 | ||
SK | 07.08.2013 | ||
GR | 08.11.2013 | ||
IS | 07.12.2013 | ||
PT | 09.12.2013 | ||
Former [2014/24] | AT | 07.08.2013 | |
BE | 07.08.2013 | ||
CY | 07.08.2013 | ||
CZ | 07.08.2013 | ||
DK | 07.08.2013 | ||
EE | 07.08.2013 | ||
ES | 07.08.2013 | ||
FI | 07.08.2013 | ||
IT | 07.08.2013 | ||
LT | 07.08.2013 | ||
LV | 07.08.2013 | ||
NL | 07.08.2013 | ||
PL | 07.08.2013 | ||
RO | 07.08.2013 | ||
SE | 07.08.2013 | ||
SI | 07.08.2013 | ||
SK | 07.08.2013 | ||
GR | 08.11.2013 | ||
IS | 07.12.2013 | ||
PT | 09.12.2013 | ||
Former [2014/23] | AT | 07.08.2013 | |
BE | 07.08.2013 | ||
CY | 07.08.2013 | ||
CZ | 07.08.2013 | ||
DK | 07.08.2013 | ||
EE | 07.08.2013 | ||
FI | 07.08.2013 | ||
LT | 07.08.2013 | ||
LV | 07.08.2013 | ||
NL | 07.08.2013 | ||
PL | 07.08.2013 | ||
RO | 07.08.2013 | ||
SE | 07.08.2013 | ||
SI | 07.08.2013 | ||
SK | 07.08.2013 | ||
GR | 08.11.2013 | ||
IS | 07.12.2013 | ||
PT | 09.12.2013 | ||
Former [2014/22] | AT | 07.08.2013 | |
BE | 07.08.2013 | ||
CY | 07.08.2013 | ||
DK | 07.08.2013 | ||
FI | 07.08.2013 | ||
LT | 07.08.2013 | ||
LV | 07.08.2013 | ||
NL | 07.08.2013 | ||
PL | 07.08.2013 | ||
RO | 07.08.2013 | ||
SE | 07.08.2013 | ||
SI | 07.08.2013 | ||
GR | 08.11.2013 | ||
IS | 07.12.2013 | ||
PT | 09.12.2013 | ||
Former [2014/21] | AT | 07.08.2013 | |
BE | 07.08.2013 | ||
CY | 07.08.2013 | ||
DK | 07.08.2013 | ||
FI | 07.08.2013 | ||
LT | 07.08.2013 | ||
LV | 07.08.2013 | ||
NL | 07.08.2013 | ||
PL | 07.08.2013 | ||
SE | 07.08.2013 | ||
SI | 07.08.2013 | ||
GR | 08.11.2013 | ||
IS | 07.12.2013 | ||
PT | 09.12.2013 | ||
Former [2014/18] | AT | 07.08.2013 | |
BE | 07.08.2013 | ||
CY | 07.08.2013 | ||
FI | 07.08.2013 | ||
LT | 07.08.2013 | ||
LV | 07.08.2013 | ||
NL | 07.08.2013 | ||
PL | 07.08.2013 | ||
SE | 07.08.2013 | ||
SI | 07.08.2013 | ||
GR | 08.11.2013 | ||
IS | 07.12.2013 | ||
PT | 09.12.2013 | ||
Former [2014/14] | AT | 07.08.2013 | |
BE | 07.08.2013 | ||
FI | 07.08.2013 | ||
LT | 07.08.2013 | ||
LV | 07.08.2013 | ||
NL | 07.08.2013 | ||
PL | 07.08.2013 | ||
SE | 07.08.2013 | ||
SI | 07.08.2013 | ||
CY | 21.08.2013 | ||
GR | 08.11.2013 | ||
IS | 07.12.2013 | ||
PT | 09.12.2013 | ||
Former [2014/12] | AT | 07.08.2013 | |
FI | 07.08.2013 | ||
LT | 07.08.2013 | ||
LV | 07.08.2013 | ||
PL | 07.08.2013 | ||
SE | 07.08.2013 | ||
SI | 07.08.2013 | ||
CY | 21.08.2013 | ||
GR | 08.11.2013 | ||
IS | 07.12.2013 | ||
PT | 09.12.2013 | ||
Former [2014/11] | AT | 07.08.2013 | |
FI | 07.08.2013 | ||
LT | 07.08.2013 | ||
PL | 07.08.2013 | ||
SE | 07.08.2013 | ||
CY | 21.08.2013 | ||
IS | 07.12.2013 | ||
PT | 09.12.2013 | ||
Former [2014/10] | AT | 07.08.2013 | |
LT | 07.08.2013 | ||
SE | 07.08.2013 | ||
CY | 21.08.2013 | ||
IS | 07.12.2013 | ||
PT | 09.12.2013 | ||
Former [2014/09] | AT | 07.08.2013 | |
LT | 07.08.2013 | ||
SE | 07.08.2013 | ||
PT | 09.12.2013 | ||
Former [2014/08] | LT | 07.08.2013 | |
PT | 09.12.2013 | Cited in | International search | [A]DE19944906 (SIEMENS AG [DE]) [A] 1-4,12-15,24 * column 1, line 26 - line 40 ** page 2, line 8 - line 58; figure 1; claims 1-3 *; | [XAY]US2003084184 (EGGLESTON GENE [US], et al) [X] 1,4,12,15,24 * paragraph [0046] - paragraph [0058]; figure 10; claims 10-19 * [A] 2,3,9-11,13,14,20-22 [Y] 5-8,16-19,23; | [DY] - NN, "3rd Gneration Partnership Project; Technical Specification Group Services and System Aspects; IMS Stage 2 (Release 8)", 3GPP TS23.228 V8.0.0, Sophia Antipolis, FRANCE, (200703), URL: httP://www.3gpp.org, (20080328), XP002475102 [DY] 5-8,16-19,23 * page 29, line 23 - page 30, line 24 * * page 32, line 1 - page 33, line 6 * | by applicant | US2003084184 |