EP1999489 - APPARATUS AND METHOD FOR GENERATING A SEISMIC SOURCE SIGNAL [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 31.10.2014 Database last updated on 19.10.2024 | Most recent event Tooltip | 15.07.2016 | Lapse of the patent in a contracting state New state(s): TR | published on 17.08.2016 [2016/33] | Applicant(s) | For all designated states INOVA Ltd. PO Box 309GT Ugland House South Church Street George Town / KY | [2010/39] |
Former [2008/50] | For all designated states Input/Output, Inc. Building 3, Suite 400 2101 City West Boulevard Houston TX 77042 / US | Inventor(s) | 01 /
WEI, Zhouhong 9019 Carriage Point Dr. Sugarland, TX 77479 / US | 02 /
SALLAS, John 1504 Hearthstone Dr. Plano, TX 75023 / US | [2008/50] | Representative(s) | Jeffrey, Philip Michael Dehns St Bride's House 10 Salisbury Square London EC4Y 8JD / GB | [N/P] |
Former [2013/52] | Jeffrey, Philip Michael Dehns St Bride's House 10 Salisbury Square London EC4Y 8JD / GB | ||
Former [2008/50] | Jeffrey, Philip Michael Frank B. Dehn & Co. St Bride's House 10 Salisbury Square London EC4Y 8JD / GB | Application number, filing date | 07754096.1 | 27.03.2007 | [2008/50] | WO2007US07525 | Priority number, date | US20060786224P | 27.03.2006 Original published format: US 786224 P | US20060825285P | 12.09.2006 Original published format: US 825285 P | [2008/50] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2007126786 | Date: | 08.11.2007 | Language: | EN | [2007/45] | Type: | A2 Application without search report | No.: | EP1999489 | Date: | 10.12.2008 | Language: | EN | The application published by WIPO in one of the EPO official languages on 08.11.2007 takes the place of the publication of the European patent application. | [2008/50] | Type: | B1 Patent specification | No.: | EP1999489 | Date: | 25.12.2013 | Language: | EN | [2013/52] | Search report(s) | International search report - published on: | US | 21.02.2008 | (Supplementary) European search report - dispatched on: | EP | 29.11.2011 | Classification | IPC: | G01V1/04, G01V1/40 | [2008/50] | CPC: |
G01V1/143 (EP,US);
G01V1/005 (EP,US);
G01V1/133 (EP,US)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, PL, PT, RO, SE, SI, SK, TR [2008/50] | Extension states | AL | Not yet paid | BA | Not yet paid | HR | Not yet paid | MK | Not yet paid | RS | Not yet paid | Title | German: | VORRICHTUNG UND VERFAHREN ZUR ERZEUGUNG EINES SEISMISCHEN QUELLENSIGNALS | [2008/50] | English: | APPARATUS AND METHOD FOR GENERATING A SEISMIC SOURCE SIGNAL | [2008/50] | French: | APPAREIL ET PROCEDE POUR PRODUIRE UN SIGNAL DE SOURCE SISMIQUE | [2008/50] | Entry into regional phase | 22.09.2008 | National basic fee paid | 22.09.2008 | Search fee paid | 22.09.2008 | Designation fee(s) paid | 22.09.2008 | Examination fee paid | Examination procedure | 22.09.2008 | Examination requested [2008/50] | 10.05.2012 | Amendment by applicant (claims and/or description) | 17.01.2013 | Despatch of a communication from the examining division (Time limit: M04) | 24.05.2013 | Reply to a communication from the examining division | 10.07.2013 | Communication of intention to grant the patent | 18.11.2013 | Fee for grant paid | 18.11.2013 | Fee for publishing/printing paid | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 17.01.2013 | Opposition(s) | 26.09.2014 | No opposition filed within time limit [2014/49] | Fees paid | Renewal fee | 06.03.2009 | Renewal fee patent year 03 | 08.03.2010 | Renewal fee patent year 04 | 10.03.2011 | Renewal fee patent year 05 | 14.03.2012 | Renewal fee patent year 06 | 11.03.2013 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 27.03.2007 | AT | 25.12.2013 | BE | 25.12.2013 | BG | 25.12.2013 | CY | 25.12.2013 | CZ | 25.12.2013 | DK | 25.12.2013 | EE | 25.12.2013 | ES | 25.12.2013 | FI | 25.12.2013 | IT | 25.12.2013 | LT | 25.12.2013 | LV | 25.12.2013 | MC | 25.12.2013 | MT | 25.12.2013 | PL | 25.12.2013 | RO | 25.12.2013 | SE | 25.12.2013 | SI | 25.12.2013 | SK | 25.12.2013 | TR | 25.12.2013 | GR | 26.03.2014 | IE | 27.03.2014 | LU | 27.03.2014 | CH | 31.03.2014 | LI | 31.03.2014 | IS | 25.04.2014 | PT | 28.04.2014 | [2016/33] |
Former [2016/32] | HU | 27.03.2007 | |
AT | 25.12.2013 | ||
BE | 25.12.2013 | ||
BG | 25.12.2013 | ||
CY | 25.12.2013 | ||
CZ | 25.12.2013 | ||
DK | 25.12.2013 | ||
EE | 25.12.2013 | ||
ES | 25.12.2013 | ||
FI | 25.12.2013 | ||
IT | 25.12.2013 | ||
LT | 25.12.2013 | ||
LV | 25.12.2013 | ||
MC | 25.12.2013 | ||
MT | 25.12.2013 | ||
PL | 25.12.2013 | ||
RO | 25.12.2013 | ||
SE | 25.12.2013 | ||
SI | 25.12.2013 | ||
SK | 25.12.2013 | ||
GR | 26.03.2014 | ||
IE | 27.03.2014 | ||
LU | 27.03.2014 | ||
CH | 31.03.2014 | ||
LI | 31.03.2014 | ||
IS | 25.04.2014 | ||
PT | 28.04.2014 | ||
Former [2016/29] | AT | 25.12.2013 | |
BE | 25.12.2013 | ||
BG | 25.12.2013 | ||
CY | 25.12.2013 | ||
CZ | 25.12.2013 | ||
DK | 25.12.2013 | ||
EE | 25.12.2013 | ||
ES | 25.12.2013 | ||
FI | 25.12.2013 | ||
IT | 25.12.2013 | ||
LT | 25.12.2013 | ||
LV | 25.12.2013 | ||
MC | 25.12.2013 | ||
MT | 25.12.2013 | ||
PL | 25.12.2013 | ||
RO | 25.12.2013 | ||
SE | 25.12.2013 | ||
SI | 25.12.2013 | ||
SK | 25.12.2013 | ||
GR | 26.03.2014 | ||
IE | 27.03.2014 | ||
LU | 27.03.2014 | ||
CH | 31.03.2014 | ||
LI | 31.03.2014 | ||
IS | 25.04.2014 | ||
PT | 28.04.2014 | ||
Former [2016/28] | AT | 25.12.2013 | |
BE | 25.12.2013 | ||
BG | 25.12.2013 | ||
CY | 25.12.2013 | ||
CZ | 25.12.2013 | ||
DK | 25.12.2013 | ||
EE | 25.12.2013 | ||
ES | 25.12.2013 | ||
FI | 25.12.2013 | ||
LT | 25.12.2013 | ||
LV | 25.12.2013 | ||
MC | 25.12.2013 | ||
MT | 25.12.2013 | ||
PL | 25.12.2013 | ||
RO | 25.12.2013 | ||
SE | 25.12.2013 | ||
SI | 25.12.2013 | ||
SK | 25.12.2013 | ||
GR | 26.03.2014 | ||
IE | 27.03.2014 | ||
LU | 27.03.2014 | ||
CH | 31.03.2014 | ||
LI | 31.03.2014 | ||
IS | 25.04.2014 | ||
PT | 28.04.2014 | ||
Former [2016/27] | AT | 25.12.2013 | |
BE | 25.12.2013 | ||
BG | 25.12.2013 | ||
CY | 25.12.2013 | ||
CZ | 25.12.2013 | ||
DK | 25.12.2013 | ||
EE | 25.12.2013 | ||
ES | 25.12.2013 | ||
FI | 25.12.2013 | ||
LT | 25.12.2013 | ||
LV | 25.12.2013 | ||
MC | 25.12.2013 | ||
MT | 25.12.2013 | ||
PL | 25.12.2013 | ||
RO | 25.12.2013 | ||
SE | 25.12.2013 | ||
SI | 25.12.2013 | ||
SK | 25.12.2013 | ||
IE | 27.03.2014 | ||
LU | 27.03.2014 | ||
CH | 31.03.2014 | ||
LI | 31.03.2014 | ||
IS | 25.04.2014 | ||
PT | 28.04.2014 | ||
Former [2016/25] | AT | 25.12.2013 | |
BE | 25.12.2013 | ||
BG | 25.12.2013 | ||
CY | 25.12.2013 | ||
CZ | 25.12.2013 | ||
DK | 25.12.2013 | ||
EE | 25.12.2013 | ||
ES | 25.12.2013 | ||
FI | 25.12.2013 | ||
LT | 25.12.2013 | ||
LV | 25.12.2013 | ||
MT | 25.12.2013 | ||
PL | 25.12.2013 | ||
RO | 25.12.2013 | ||
SE | 25.12.2013 | ||
SI | 25.12.2013 | ||
SK | 25.12.2013 | ||
IE | 27.03.2014 | ||
LU | 27.03.2014 | ||
CH | 31.03.2014 | ||
LI | 31.03.2014 | ||
IS | 25.04.2014 | ||
PT | 28.04.2014 | ||
Former [2016/12] | AT | 25.12.2013 | |
BE | 25.12.2013 | ||
CY | 25.12.2013 | ||
CZ | 25.12.2013 | ||
DK | 25.12.2013 | ||
EE | 25.12.2013 | ||
ES | 25.12.2013 | ||
FI | 25.12.2013 | ||
LT | 25.12.2013 | ||
LV | 25.12.2013 | ||
MT | 25.12.2013 | ||
PL | 25.12.2013 | ||
RO | 25.12.2013 | ||
SE | 25.12.2013 | ||
SI | 25.12.2013 | ||
SK | 25.12.2013 | ||
IE | 27.03.2014 | ||
LU | 27.03.2014 | ||
CH | 31.03.2014 | ||
LI | 31.03.2014 | ||
IS | 25.04.2014 | ||
PT | 28.04.2014 | ||
Former [2015/24] | AT | 25.12.2013 | |
BE | 25.12.2013 | ||
CY | 25.12.2013 | ||
CZ | 25.12.2013 | ||
DK | 25.12.2013 | ||
EE | 25.12.2013 | ||
ES | 25.12.2013 | ||
FI | 25.12.2013 | ||
LT | 25.12.2013 | ||
LV | 25.12.2013 | ||
PL | 25.12.2013 | ||
RO | 25.12.2013 | ||
SE | 25.12.2013 | ||
SI | 25.12.2013 | ||
SK | 25.12.2013 | ||
IE | 27.03.2014 | ||
LU | 27.03.2014 | ||
CH | 31.03.2014 | ||
LI | 31.03.2014 | ||
IS | 25.04.2014 | ||
PT | 28.04.2014 | ||
Former [2015/08] | AT | 25.12.2013 | |
BE | 25.12.2013 | ||
CY | 25.12.2013 | ||
CZ | 25.12.2013 | ||
DK | 25.12.2013 | ||
EE | 25.12.2013 | ||
ES | 25.12.2013 | ||
FI | 25.12.2013 | ||
LT | 25.12.2013 | ||
LV | 25.12.2013 | ||
PL | 25.12.2013 | ||
RO | 25.12.2013 | ||
SE | 25.12.2013 | ||
SK | 25.12.2013 | ||
IE | 27.03.2014 | ||
LU | 27.03.2014 | ||
CH | 31.03.2014 | ||
LI | 31.03.2014 | ||
IS | 25.04.2014 | ||
PT | 28.04.2014 | ||
Former [2015/07] | AT | 25.12.2013 | |
BE | 25.12.2013 | ||
CY | 25.12.2013 | ||
CZ | 25.12.2013 | ||
DK | 25.12.2013 | ||
EE | 25.12.2013 | ||
ES | 25.12.2013 | ||
FI | 25.12.2013 | ||
LT | 25.12.2013 | ||
LV | 25.12.2013 | ||
PL | 25.12.2013 | ||
RO | 25.12.2013 | ||
SE | 25.12.2013 | ||
SK | 25.12.2013 | ||
IE | 27.03.2014 | ||
LU | 27.03.2014 | ||
IS | 25.04.2014 | ||
PT | 28.04.2014 | ||
Former [2014/48] | AT | 25.12.2013 | |
BE | 25.12.2013 | ||
CY | 25.12.2013 | ||
CZ | 25.12.2013 | ||
DK | 25.12.2013 | ||
EE | 25.12.2013 | ||
ES | 25.12.2013 | ||
FI | 25.12.2013 | ||
LT | 25.12.2013 | ||
LV | 25.12.2013 | ||
PL | 25.12.2013 | ||
RO | 25.12.2013 | ||
SE | 25.12.2013 | ||
SK | 25.12.2013 | ||
LU | 27.03.2014 | ||
IS | 25.04.2014 | ||
PT | 28.04.2014 | ||
Former [2014/37] | AT | 25.12.2013 | |
BE | 25.12.2013 | ||
CY | 25.12.2013 | ||
CZ | 25.12.2013 | ||
EE | 25.12.2013 | ||
ES | 25.12.2013 | ||
FI | 25.12.2013 | ||
LT | 25.12.2013 | ||
LV | 25.12.2013 | ||
PL | 25.12.2013 | ||
RO | 25.12.2013 | ||
SE | 25.12.2013 | ||
SK | 25.12.2013 | ||
IS | 25.04.2014 | ||
PT | 28.04.2014 | ||
Former [2014/36] | BE | 25.12.2013 | |
EE | 25.12.2013 | ||
FI | 25.12.2013 | ||
LT | 25.12.2013 | ||
LV | 25.12.2013 | ||
SE | 25.12.2013 | ||
IS | 25.04.2014 | ||
Former [2014/34] | BE | 25.12.2013 | |
FI | 25.12.2013 | ||
LT | 25.12.2013 | ||
LV | 25.12.2013 | ||
SE | 25.12.2013 | ||
Former [2014/25] | FI | 25.12.2013 | |
LT | 25.12.2013 | ||
LV | 25.12.2013 | ||
SE | 25.12.2013 | ||
Former [2014/22] | FI | 25.12.2013 | |
LT | 25.12.2013 | ||
SE | 25.12.2013 | ||
Former [2014/20] | LT | 25.12.2013 | Documents cited: | Search | [X]US4519053 (BEDENBENDER JOHN W [US]) [X] 1-15 * column 5, line 31 - line 49 * * column 5, line 53 - line 66 * * column 7, line 44 - line 68 ** figures 7,8 *; | [X]WO9811357 (ETREMA PRODUCTS INC [US]) [X] 1-15 * page 3, line 12 - line 17 * * page 4, line 34 - line 36 * * page 6, line 21 - line 25 * * page 10, line 33 * * page 12, line 35 - line 37 * * page 13, line 6 - line 12 * * page 13, line 25 - line 27 * * figures 6,7 * | International search | [Y]US4103756 (TRULIO JOHN G, et al); | [Y]US5005665 (CHEUNG LIM H [US]); | [Y]US6561310 (HOOVER GARY M [US]); | [Y]US6671224 (PABON JAHIR [US]); | [Y]US2005252711 (RAU JOHN W [CA]) |