EP2022207 - CRYPTOGRAPHIC METHOD WITH INTEGRATED ENCRYPTION AND REVOCATION, SYSTEM, DEVICE AND PROGRAMS FOR IMPLEMENTING THIS METHOD [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 16.08.2019 Database last updated on 30.07.2024 | |
Former | The patent has been granted Status updated on 07.09.2018 | ||
Former | Grant of patent is intended Status updated on 08.05.2018 | ||
Former | Examination is in progress Status updated on 09.11.2016 | Most recent event Tooltip | 23.07.2021 | Lapse of the patent in a contracting state New state(s): MT | published on 25.08.2021 [2021/34] | Applicant(s) | For all designated states Orange 78, rue Olivier de Serres 75015 Paris / FR | [2013/39] |
Former [2009/07] | For all designated states France Télécom 6 Place d'Alleray 75015 Paris / FR | Inventor(s) | 01 /
DELERABLEE, Cécile 28 rue de Cheux 14000 Caen / FR | [2009/07] | Representative(s) | Plasseraud IP 104 Rue de Richelieu CS92104 75080 Paris Cedex 02 / FR | [N/P] |
Former [2018/41] | Cabinet Plasseraud 66, rue de la Chaussée d'Antin 75440 Paris Cedex 09 / FR | ||
Former [2012/36] | Cabinet Plasseraud 52, rue de la Victoire 75440 Paris Cedex 09 / FR | ||
Former [2009/07] | Loisel, Bertrand Cabinet Plasseraud 52 rue de la Victoire 75440 Paris Cedex 09 / FR | Application number, filing date | 07765995.1 | 04.05.2007 | [2009/07] | WO2007FR51214 | Priority number, date | FR20060004853 | 31.05.2006 Original published format: FR 0604853 | [2009/07] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | WO2007138204 | Date: | 06.12.2007 | Language: | FR | [2007/49] | Type: | A1 Application with search report | No.: | EP2022207 | Date: | 11.02.2009 | Language: | FR | The application published by WIPO in one of the EPO official languages on 06.12.2007 takes the place of the publication of the European patent application. | [2009/07] | Type: | B1 Patent specification | No.: | EP2022207 | Date: | 10.10.2018 | Language: | FR | [2018/41] | Search report(s) | International search report - published on: | EP | 06.12.2007 | Classification | IPC: | H04L9/08, H04L9/30, H04N7/167 | [2009/07] | CPC: |
H04L9/0891 (EP,US);
H04L9/0833 (EP,US);
H04N21/2351 (EP,US);
H04N21/26613 (EP,US);
H04N21/6334 (EP,US);
H04L2209/601 (EP,US)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, PL, PT, RO, SE, SI, SK, TR [2018/41] |
Former [2009/07] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, PL, PT, RO, SE, SI, SK, TR | Extension states | AL | Not yet paid | BA | Not yet paid | HR | Not yet paid | MK | Not yet paid | RS | Not yet paid | Title | German: | KRYPTOGRAFISCHES VERFAHREN MIT INTEGRIERTER VERSCHLÜSSELUNG UND AUFHEBUNG, SYSTEM, VERFAHREN UND PROGRAMME ZUR IMPLEMENTIERUNG DIESES VERFAHRENS | [2009/07] | English: | CRYPTOGRAPHIC METHOD WITH INTEGRATED ENCRYPTION AND REVOCATION, SYSTEM, DEVICE AND PROGRAMS FOR IMPLEMENTING THIS METHOD | [2009/07] | French: | PROCÉDÉ CRYPTOGRAPHIQUE À CHIFFREMENT ET RÉVOCATION INTÉGRÉS, SYSTÈME, DISPOSITIF ET PROGRAMMES POUR LA MISE EN OEUVRE DU PROCÉDÉ | [2018/23] |
Former [2009/07] | PROCEDE CRYPTOGRAPHIQUE A CHIFFREMENT ET REVOCATION INTEGRES, SYSTEME, DISPOSITIF ET PROGRAMMES POUR LA MISE EN OEUVRE DU PROCEDE | Entry into regional phase | 12.11.2008 | National basic fee paid | 12.11.2008 | Designation fee(s) paid | 12.11.2008 | Examination fee paid | Examination procedure | 12.11.2008 | Amendment by applicant (claims and/or description) | 12.11.2008 | Examination requested [2009/07] | 28.10.2016 | Despatch of a communication from the examining division (Time limit: M04) | 23.02.2017 | Reply to a communication from the examining division | 24.04.2017 | Despatch of a communication from the examining division (Time limit: M04) | 01.08.2017 | Reply to a communication from the examining division | 06.11.2017 | Despatch of a communication from the examining division (Time limit: M04) | 16.02.2018 | Reply to a communication from the examining division | 09.05.2018 | Communication of intention to grant the patent | 03.09.2018 | Fee for grant paid | 03.09.2018 | Fee for publishing/printing paid | 03.09.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 28.10.2016 | Opposition(s) | 11.07.2019 | No opposition filed within time limit [2019/38] | Fees paid | Renewal fee | 25.05.2009 | Renewal fee patent year 03 | 28.05.2010 | Renewal fee patent year 04 | 30.05.2011 | Renewal fee patent year 05 | 26.03.2012 | Renewal fee patent year 06 | 29.05.2013 | Renewal fee patent year 07 | 26.05.2014 | Renewal fee patent year 08 | 28.05.2015 | Renewal fee patent year 09 | 26.05.2016 | Renewal fee patent year 10 | 24.05.2017 | Renewal fee patent year 11 | 25.05.2018 | Renewal fee patent year 12 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 04.05.2007 | AT | 10.10.2018 | CY | 10.10.2018 | CZ | 10.10.2018 | DK | 10.10.2018 | EE | 10.10.2018 | ES | 10.10.2018 | FI | 10.10.2018 | IT | 10.10.2018 | LT | 10.10.2018 | LV | 10.10.2018 | MC | 10.10.2018 | MT | 10.10.2018 | NL | 10.10.2018 | PL | 10.10.2018 | RO | 10.10.2018 | SE | 10.10.2018 | SI | 10.10.2018 | SK | 10.10.2018 | TR | 10.10.2018 | BG | 10.01.2019 | GR | 11.01.2019 | IS | 10.02.2019 | PT | 10.02.2019 | IE | 04.05.2019 | LU | 04.05.2019 | BE | 31.05.2019 | CH | 31.05.2019 | LI | 31.05.2019 | [2021/34] |
Former [2021/32] | HU | 04.05.2007 | |
AT | 10.10.2018 | ||
CY | 10.10.2018 | ||
CZ | 10.10.2018 | ||
DK | 10.10.2018 | ||
EE | 10.10.2018 | ||
ES | 10.10.2018 | ||
FI | 10.10.2018 | ||
IT | 10.10.2018 | ||
LT | 10.10.2018 | ||
LV | 10.10.2018 | ||
MC | 10.10.2018 | ||
NL | 10.10.2018 | ||
PL | 10.10.2018 | ||
RO | 10.10.2018 | ||
SE | 10.10.2018 | ||
SI | 10.10.2018 | ||
SK | 10.10.2018 | ||
TR | 10.10.2018 | ||
BG | 10.01.2019 | ||
GR | 11.01.2019 | ||
IS | 10.02.2019 | ||
PT | 10.02.2019 | ||
IE | 04.05.2019 | ||
LU | 04.05.2019 | ||
BE | 31.05.2019 | ||
CH | 31.05.2019 | ||
LI | 31.05.2019 | ||
Former [2021/26] | AT | 10.10.2018 | |
CY | 10.10.2018 | ||
CZ | 10.10.2018 | ||
DK | 10.10.2018 | ||
EE | 10.10.2018 | ||
ES | 10.10.2018 | ||
FI | 10.10.2018 | ||
IT | 10.10.2018 | ||
LT | 10.10.2018 | ||
LV | 10.10.2018 | ||
MC | 10.10.2018 | ||
NL | 10.10.2018 | ||
PL | 10.10.2018 | ||
RO | 10.10.2018 | ||
SE | 10.10.2018 | ||
SI | 10.10.2018 | ||
SK | 10.10.2018 | ||
TR | 10.10.2018 | ||
BG | 10.01.2019 | ||
GR | 11.01.2019 | ||
IS | 10.02.2019 | ||
PT | 10.02.2019 | ||
IE | 04.05.2019 | ||
LU | 04.05.2019 | ||
BE | 31.05.2019 | ||
CH | 31.05.2019 | ||
LI | 31.05.2019 | ||
Former [2020/26] | AT | 10.10.2018 | |
CZ | 10.10.2018 | ||
DK | 10.10.2018 | ||
EE | 10.10.2018 | ||
ES | 10.10.2018 | ||
FI | 10.10.2018 | ||
IT | 10.10.2018 | ||
LT | 10.10.2018 | ||
LV | 10.10.2018 | ||
MC | 10.10.2018 | ||
NL | 10.10.2018 | ||
PL | 10.10.2018 | ||
RO | 10.10.2018 | ||
SE | 10.10.2018 | ||
SI | 10.10.2018 | ||
SK | 10.10.2018 | ||
TR | 10.10.2018 | ||
BG | 10.01.2019 | ||
GR | 11.01.2019 | ||
IS | 10.02.2019 | ||
PT | 10.02.2019 | ||
IE | 04.05.2019 | ||
LU | 04.05.2019 | ||
BE | 31.05.2019 | ||
CH | 31.05.2019 | ||
LI | 31.05.2019 | ||
Former [2020/21] | AT | 10.10.2018 | |
CZ | 10.10.2018 | ||
DK | 10.10.2018 | ||
EE | 10.10.2018 | ||
ES | 10.10.2018 | ||
FI | 10.10.2018 | ||
IT | 10.10.2018 | ||
LT | 10.10.2018 | ||
LV | 10.10.2018 | ||
MC | 10.10.2018 | ||
NL | 10.10.2018 | ||
PL | 10.10.2018 | ||
RO | 10.10.2018 | ||
SE | 10.10.2018 | ||
SI | 10.10.2018 | ||
SK | 10.10.2018 | ||
TR | 10.10.2018 | ||
BG | 10.01.2019 | ||
GR | 11.01.2019 | ||
IS | 10.02.2019 | ||
PT | 10.02.2019 | ||
IE | 04.05.2019 | ||
LU | 04.05.2019 | ||
CH | 31.05.2019 | ||
LI | 31.05.2019 | ||
Former [2020/17] | AT | 10.10.2018 | |
CZ | 10.10.2018 | ||
DK | 10.10.2018 | ||
EE | 10.10.2018 | ||
ES | 10.10.2018 | ||
FI | 10.10.2018 | ||
IT | 10.10.2018 | ||
LT | 10.10.2018 | ||
LV | 10.10.2018 | ||
MC | 10.10.2018 | ||
NL | 10.10.2018 | ||
PL | 10.10.2018 | ||
RO | 10.10.2018 | ||
SE | 10.10.2018 | ||
SI | 10.10.2018 | ||
SK | 10.10.2018 | ||
TR | 10.10.2018 | ||
BG | 10.01.2019 | ||
GR | 11.01.2019 | ||
IS | 10.02.2019 | ||
PT | 10.02.2019 | ||
LU | 04.05.2019 | ||
CH | 31.05.2019 | ||
LI | 31.05.2019 | ||
Former [2020/11] | AT | 10.10.2018 | |
CZ | 10.10.2018 | ||
DK | 10.10.2018 | ||
EE | 10.10.2018 | ||
ES | 10.10.2018 | ||
FI | 10.10.2018 | ||
IT | 10.10.2018 | ||
LT | 10.10.2018 | ||
LV | 10.10.2018 | ||
MC | 10.10.2018 | ||
NL | 10.10.2018 | ||
PL | 10.10.2018 | ||
RO | 10.10.2018 | ||
SE | 10.10.2018 | ||
SI | 10.10.2018 | ||
SK | 10.10.2018 | ||
BG | 10.01.2019 | ||
GR | 11.01.2019 | ||
IS | 10.02.2019 | ||
PT | 10.02.2019 | ||
LU | 04.05.2019 | ||
CH | 31.05.2019 | ||
LI | 31.05.2019 | ||
Former [2020/07] | AT | 10.10.2018 | |
CZ | 10.10.2018 | ||
DK | 10.10.2018 | ||
EE | 10.10.2018 | ||
ES | 10.10.2018 | ||
FI | 10.10.2018 | ||
IT | 10.10.2018 | ||
LT | 10.10.2018 | ||
LV | 10.10.2018 | ||
MC | 10.10.2018 | ||
NL | 10.10.2018 | ||
PL | 10.10.2018 | ||
RO | 10.10.2018 | ||
SE | 10.10.2018 | ||
SI | 10.10.2018 | ||
SK | 10.10.2018 | ||
BG | 10.01.2019 | ||
GR | 11.01.2019 | ||
IS | 10.02.2019 | ||
PT | 10.02.2019 | ||
Former [2019/50] | AT | 10.10.2018 | |
CZ | 10.10.2018 | ||
DK | 10.10.2018 | ||
EE | 10.10.2018 | ||
ES | 10.10.2018 | ||
FI | 10.10.2018 | ||
IT | 10.10.2018 | ||
LT | 10.10.2018 | ||
LV | 10.10.2018 | ||
NL | 10.10.2018 | ||
PL | 10.10.2018 | ||
RO | 10.10.2018 | ||
SE | 10.10.2018 | ||
SI | 10.10.2018 | ||
SK | 10.10.2018 | ||
BG | 10.01.2019 | ||
GR | 11.01.2019 | ||
IS | 10.02.2019 | ||
PT | 10.02.2019 | ||
Former [2019/40] | AT | 10.10.2018 | |
CZ | 10.10.2018 | ||
DK | 10.10.2018 | ||
EE | 10.10.2018 | ||
ES | 10.10.2018 | ||
FI | 10.10.2018 | ||
IT | 10.10.2018 | ||
LT | 10.10.2018 | ||
LV | 10.10.2018 | ||
NL | 10.10.2018 | ||
PL | 10.10.2018 | ||
RO | 10.10.2018 | ||
SE | 10.10.2018 | ||
SK | 10.10.2018 | ||
BG | 10.01.2019 | ||
GR | 11.01.2019 | ||
IS | 10.02.2019 | ||
PT | 10.02.2019 | ||
Former [2019/37] | AT | 10.10.2018 | |
CZ | 10.10.2018 | ||
DK | 10.10.2018 | ||
EE | 10.10.2018 | ||
ES | 10.10.2018 | ||
FI | 10.10.2018 | ||
IT | 10.10.2018 | ||
LT | 10.10.2018 | ||
LV | 10.10.2018 | ||
NL | 10.10.2018 | ||
PL | 10.10.2018 | ||
RO | 10.10.2018 | ||
SE | 10.10.2018 | ||
BG | 10.01.2019 | ||
GR | 11.01.2019 | ||
IS | 10.02.2019 | ||
PT | 10.02.2019 | ||
Former [2019/35] | AT | 10.10.2018 | |
CZ | 10.10.2018 | ||
DK | 10.10.2018 | ||
ES | 10.10.2018 | ||
FI | 10.10.2018 | ||
IT | 10.10.2018 | ||
LT | 10.10.2018 | ||
LV | 10.10.2018 | ||
NL | 10.10.2018 | ||
PL | 10.10.2018 | ||
SE | 10.10.2018 | ||
BG | 10.01.2019 | ||
GR | 11.01.2019 | ||
IS | 10.02.2019 | ||
PT | 10.02.2019 | ||
Former [2019/34] | AT | 10.10.2018 | |
DK | 10.10.2018 | ||
ES | 10.10.2018 | ||
FI | 10.10.2018 | ||
IT | 10.10.2018 | ||
LT | 10.10.2018 | ||
LV | 10.10.2018 | ||
NL | 10.10.2018 | ||
PL | 10.10.2018 | ||
SE | 10.10.2018 | ||
BG | 10.01.2019 | ||
GR | 11.01.2019 | ||
IS | 10.02.2019 | ||
PT | 10.02.2019 | ||
Former [2019/26] | AT | 10.10.2018 | |
ES | 10.10.2018 | ||
FI | 10.10.2018 | ||
LT | 10.10.2018 | ||
LV | 10.10.2018 | ||
NL | 10.10.2018 | ||
PL | 10.10.2018 | ||
SE | 10.10.2018 | ||
BG | 10.01.2019 | ||
GR | 11.01.2019 | ||
IS | 10.02.2019 | ||
PT | 10.02.2019 | ||
Former [2019/24] | AT | 10.10.2018 | |
ES | 10.10.2018 | ||
FI | 10.10.2018 | ||
LT | 10.10.2018 | ||
LV | 10.10.2018 | ||
NL | 10.10.2018 | ||
PL | 10.10.2018 | ||
SE | 10.10.2018 | ||
BG | 10.01.2019 | ||
GR | 11.01.2019 | ||
IS | 10.02.2019 | ||
Former [2019/23] | AT | 10.10.2018 | |
ES | 10.10.2018 | ||
FI | 10.10.2018 | ||
LT | 10.10.2018 | ||
LV | 10.10.2018 | ||
NL | 10.10.2018 | ||
PL | 10.10.2018 | ||
BG | 10.01.2019 | ||
IS | 10.02.2019 | ||
Former [2019/22] | FI | 10.10.2018 | |
LT | 10.10.2018 | ||
NL | 10.10.2018 | ||
PL | 10.10.2018 | ||
BG | 10.01.2019 | ||
IS | 10.02.2019 | ||
Former [2019/21] | FI | 10.10.2018 | |
LT | 10.10.2018 | ||
NL | 10.10.2018 | ||
IS | 10.02.2019 | ||
Former [2019/20] | LT | 10.10.2018 | |
NL | 10.10.2018 | ||
Former [2019/17] | NL | 10.10.2018 | Cited in | International search | [X] - WEN-GUEY TZENG ET AL, "A public-key traitor tracing scheme with revocation using dynamic shares", PUBLIC KEY CRYTOGRAPHY. 4TH INTERNATIONAL WORKSHOP ON PRACTICE AND THEORY IN PUBLIC KEY CRYPTOSYSTEMS, PKC 2001. PROCEEDINGS (LECTURE NOTES IN COMPUTER SCIENCE VOL.1992) SPRINGER-VERLAG BERLIN, GERMANY, (2001), ISBN 3-540-41658-7, pages 207 - 224, XP002416529 [X] 1-6,11,12,17-20,24 * abstract * * page 209, line 29 - page 214, line 4; figure 1 * * page 215, line 6 - line 21 * | [XA] - TO V D ET AL ASSOCIATION FOR COMPUTING MACHINERY, "NEW TRAITOR TRACING SCHEMES USING BILINEAR MAP", PROCEEDINGS OF THE 3RD. ACM WORKSHOP ON DIGITAL RIGHTS MANAGEMENT. DRM 2003. WASHINGTON, DC, OCT. 27, 2003, PROCEEDINGS OF THE ACM WORKSHOP ON DIGITAL RIGHTS MANAGEMENT. (DRM), NEW YORK, NY : ACM, US, (20031027), ISBN 1-58113-786-9, pages 67 - 76, XP001238176 [X] 1-5,11,12,17-19,24 * abstract * * page 69, column L, line 34 - page 70, column L, line 6 * * page 73, column L, line 23 - column R, line 30 * * page 74, column R, line 12 - line 51 * * page 75, line 116 * [A] 7-10,13-16,21-23 DOI: http://dx.doi.org/10.1145/947380.947389 | [X] - NAOR M ET AL, "Efficient Trace and Revoke Schemes", LECTURE NOTES IN COMPUTER SCIENCE, SPRINGER VERLAG, BERLIN, DE, (200002), vol. 1962, ISSN 0302-9743, pages 1 - 20, XP002326817 [X] 1-5,11,12,17-19,24 * abstract * * page 3, line 36 - page 4, line 17 * * page 13, line 27 - line 37 * * page 16, line 11 - line L * |