blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2071770

EP2071770 - A METHOD, A CORRESPONDING DEVICE AND A COMMUNICATION EQUIPMENT FOR BURST ASSEMBLING CONTROL [Right-click to bookmark this link]
StatusThe application has been withdrawn
Status updated on  15.12.2017
Database last updated on 02.09.2024
FormerGrant of patent is intended
Status updated on  01.12.2017
FormerThe patent has been granted
Status updated on  24.11.2017
FormerGrant of patent is intended
Status updated on  09.07.2017
FormerRequest for examination was made
Status updated on  22.03.2017
Most recent event   Tooltip11.01.2019Change - classificationpublished on 13.02.2019  [2019/07]
Applicant(s)For all designated states
Huawei Technologies Co., Ltd.
Huawei Administration Building
Bantian
Longgang District
Shenzhen, Guangdong 518129 / CN
For all designated states
University Of Electronic Science And Technology Of China
No. 4 Section 2
North Jianshe Road
Chengdu
Sichuan 610054 / CN
[N/P]
Former [2017/52]For all designated states
Huawei Technologies Co., Ltd.
Huawei Administration Building
Bantian
Longgang District
Shenzhen, Guangdong 518129 / CN
For all designated states
University Of Electronic Science And Technology Of China
No. 4 Section 2 North Jianshe Road Chengdu
Sichuan 610054 / CN
Former [2009/25]For all designated states
Huawei Technologies Co., Ltd.
Huawei Administration Building Bantian Longgang District, Shenzhen
Guangdong 518129 / CN
For all designated states
University Of Electronic Science And Technology Of China
No. 4 Section 2 North Jianshe Road Chengdu
Sichuan 610054 / CN
Inventor(s)01 / ZHAO, Lu
No.4, Section 2
North Jianshe Road
Chengdu Sichuan 610054 / CN
02 / WANG, Sheng
No.4, Section 2
North Jianshe Road
Chengdu Sichuan 610054 / CN
03 / XU, Shizhong
No.4, Section 2
North Jianshe Road
Chengdu Sichuan 610054 / CN
04 / ZHANG, Yi
Huawei Administration Building
Bantian
Longgang District
Shenzhen Guangdong 518129 / CN
 [2017/52]
Former [2009/25]01 / ZHAO, Lu
No.4, Section 2 North Jianshe Road
Chengdu Sichuan 610054 / CN
02 / WANG, Sheng
No.4, Section 2 North Jianshe Road
Chengdu Sichuan 610054 / CN
03 / XU, Shizhong
No.4, Section 2 North Jianshe Road
Chengdu Sichuan 610054 / CN
04 / ZHANG, Yi
Huawei Administration Building Bantian Longgang District
Shenzhen Guangdong 518129 / CN
Representative(s)Körber, Martin Hans
Mitscherlich PartmbB
Patent- und Rechtsanwälte
Sonnenstrasse 33
80331 München / DE
[2017/52]
Former [2009/30]Körber, Martin Hans
Mitscherlich & Partner Patent- und Rechtsanwälte Sonnenstraße 33
80331 München / DE
Former [2009/25]Körber, Martin Hans
Mitscherlich & Partner Sonnenstrasse 33
80331 München / DE
Application number, filing date07801071.710.09.2007
[2009/25]
WO2007CN70663
Priority number, dateCN2006106465730.12.2006         Original published format: CN200610064657
[2009/25]
Filing languageZH
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2008080316
Date:10.07.2008
Language:ZH
[2008/28]
Type: A1 Application with search report 
No.:EP2071770
Date:17.06.2009
Language:EN
[2009/25]
Search report(s)International search report - published on:CN10.07.2008
(Supplementary) European search report - dispatched on:EP24.05.2013
ClassificationIPC:H04Q11/00, H04L12/835, H04L12/815, H04L29/06, H04L12/801, H04L12/861, H04L12/841
[2017/31]
CPC:
H04L47/10 (EP,US); H04L47/22 (EP,US); H04L47/283 (EP,US);
H04L47/30 (EP,US); H04L47/43 (EP); H04L49/90 (US);
H04L69/28 (EP,US); H04Q11/0066 (EP,US); H04Q2011/0064 (EP,US) (-)
Former IPC [2013/26]H04Q11/00, H04L12/835, H04L12/815, H04L12/861, H04L29/06
Former IPC [2009/25]H04L12/56
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MT,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2017/52]
Former [2009/25]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MT,  NL,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
Extension statesALNot yet paid
BANot yet paid
HRNot yet paid
MKNot yet paid
RSNot yet paid
TitleGerman:VERFAHREN ENTSPRECHENDES GERÄT UND KOMMUNIKATIONSAUSRÜSTUNG FÜR BURST-ASSEMBLING-STEUERUNG[2009/25]
English:A METHOD, A CORRESPONDING DEVICE AND A COMMUNICATION EQUIPMENT FOR BURST ASSEMBLING CONTROL[2009/25]
French:PROCÉDÉ, DISPOSITIF CORRESPONDANT ET ÉQUIPEMENT DE COMMUNICATION POUR COMMANDE D'ASSEMBLAGE EN RAFALES[2009/25]
Entry into regional phase24.04.2009Translation filed 
24.04.2009National basic fee paid 
24.04.2009Search fee paid 
24.04.2009Designation fee(s) paid 
24.04.2009Examination fee paid 
Examination procedure24.04.2009Examination requested  [2009/25]
09.12.2013Amendment by applicant (claims and/or description)
10.07.2017Communication of intention to grant the patent
26.10.2017Fee for grant paid
26.10.2017Fee for publishing/printing paid
15.11.2017Receipt of the translation of the claim(s)
22.11.2017Application withdrawn by applicant  [2018/03]
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  10.07.2017
Fees paidRenewal fee
29.09.2009Renewal fee patent year 03
29.09.2010Renewal fee patent year 04
30.09.2011Renewal fee patent year 05
28.09.2012Renewal fee patent year 06
27.09.2013Renewal fee patent year 07
29.09.2014Renewal fee patent year 08
29.09.2015Renewal fee patent year 09
28.09.2016Renewal fee patent year 10
29.09.2017Renewal fee patent year 11
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[XAI]  - OH S-Y ET AL, "A data burst assembly algorithm in optical burst switching networks", ETRI JOURNAL, ELECTRONICS AND TELECOMMUNICATIONS RESEARCH INSTITUTE, KR, (20020801), vol. 24, no. 4, doi:10.4218/ETRIJ.02.0102.0406, ISSN 1225-6463, pages 311 - 322, XP002257124 [X] 1,7-10,12,13 * figure 3 * * section III * [A] 2-5,11 [I] 6

DOI:   http://dx.doi.org/10.4218/etrij.02.0102.0406
 [XI]  - YANJUN LI ET AL, "A study of adaptive burst assembly mechanism in optical burst switch networks", PROCEEDINGS OF SPIE, S P I E - INTERNATIONAL SOCIETY FOR OPTICAL ENGINEERING, US, vol. 5282, doi:10.1117/12.523827, ISSN 0277-786X, (20031104), pages 169 - 175, (20100312), XP002573036 [X] 1,7-10,12,13 * sections 2 and 3 * [I] 6

DOI:   http://dx.doi.org/10.1117/12.523827
 [A]  - CAO X ET AL, "Traffic Statistics and Performance Evaluation in Optical Burst Switched Networks", JOURNAL OF LIGHTWAVE TECHNOLOGY, IEEE SERVICE CENTER, NEW YORK, NY, US, (20041201), vol. 22, no. 12, doi:10.1109/JLT.2003.822832, ISSN 0733-8724, pages 2722 - 2738, XP011123314 [A] 1-13 * Study of different burst assembly algorithms and their impact on the traffic characteristics *

DOI:   http://dx.doi.org/10.1109/JLT.2003.822832
International search[A]US2003099243  (OH SE-YOON [KR], et al);
 [A]US2004022248  (YUANG MARIA C [TW], et al);
 [A]  - WU Y. ET AL., "Modifying the adaptive assembly algorithm based on the length threshold", JOURNAL OF COMMUNICATIONS, (200604), vol. 27, no. 4, page 38, XP008106133
 [A]  - BI F. ET AL., "A Study of an Improved Adaptive Burst Assembly Mechanism", OPTICAL COMMUNICATION TECHNOLOGY, (200506), vol. 6, pages 31 - 32, XP008106155
 [A]  - CAO X. ET AL., "Assembling TCP IP packets in optical burst switched networks", GLOBECOM'02, (20021121), vol. 3, pages 2808 - 2810, XP010636258

DOI:   http://dx.doi.org/10.1109/GLOCOM.2002.1189141
by applicant   - YOO OH ET AL., "A Data Burst Assembly Algorithm in Optical Burst Switching Networks", ETRI JOURNAL, ELECTRONICS AND TELECOMMUNICATIONS RESEARCH INSTITUTE, (20020801), vol. 24, no. 4, doi:doi:10.4218/etrij.02.0102.0406, pages 311 - 322, XP002257124

DOI:   http://dx.doi.org/10.4218/etrij.02.0102.0406
    - YANJUN LI ET AL., "A Study Of Adaptive Burst Assembly Mechanism In Optical Burst Switch Networks", PROCEEDINGS OF SPIE, S P I E - INTERNATIONAL SOCIETY FOR OPTICAL ENGINEERING, (20031104), vol. 5285, doi:doi:10.1117/12.523827, pages 169 - 175, XP002573036

DOI:   http://dx.doi.org/10.1117/12.523827
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.