EP2051659 - METHOD FOR THE PRODUCTION OF A POROUS, CERAMIC SURFACE LAYER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 15.02.2019 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 09.03.2018 | ||
Former | Grant of patent is intended Status updated on 07.11.2017 | ||
Former | Examination is in progress Status updated on 16.12.2016 | Most recent event Tooltip | 10.07.2020 | Lapse of the patent in a contracting state New state(s): CY, IS | published on 12.08.2020 [2020/33] | Applicant(s) | For all designated states METOXIT AG Emdwiesenstrasse 6 8240 Thayngen / CH | [2018/28] |
Former [2009/18] | For all designated states METOXIT AG Emdwiesenstrasse CH-8240 Thayngen / CH | Inventor(s) | 01 /
KÖBEL, Stefan Rheinfallstrasse 15 8447 Dachsen / CH | 02 /
WEBER, Wolfram Maximilian-Gönner-Strasse 2 78247 Hilzingen / DE | 03 /
RIEGER, Wolfhart Zur Mühle 8263 Buch / CH | [2018/15] |
Former [2009/24] | 01 /
KÖBEL, Stefan Rheinfallstrasse 15 CH-8447 Dachsen / CH | ||
02 /
WEBER, Wolfram Maximilian-Gönner-Strasse 2 78247 Hilzingen / DE | |||
03 /
RIEGER, Wolfhart Zur Mühle CH-8263 Buch / CH | |||
Former [2009/18] | 01 /
KÖBEL, Stefan Witikonerstrasse 470 CH-8053 Zürich / CH | ||
02 /
WEBER, Wolfram Maximilian-Gönner-Strasse 2 78247 Hilzingen / DE | |||
03 /
RIEGER, Wolfhart Zur Mühle CH-8263 Buch / CH | Representative(s) | DTS Zürich Bahnhofstrasse 100 8001 Zürich / CH | [N/P] |
Former [2018/15] | DTS Zürich Resirain 1 8125 Zollikerberg/Zürich / CH | ||
Former [2009/18] | DTS Zürich Resirain 1 8125 Zollikerberg/Zürich / CH | Application number, filing date | 07801561.7 | 08.08.2007 | [2009/18] | WO2007EP07023 | Priority number, date | DE20061037067 | 08.08.2006 Original published format: DE102006037067 | [2009/18] | Filing language | DE | Procedural language | DE | Publication | Type: | A2 Application without search report | No.: | WO2008017472 | Date: | 14.02.2008 | Language: | DE | [2008/07] | Type: | A2 Application without search report | No.: | EP2051659 | Date: | 29.04.2009 | Language: | DE | The application published by WIPO in one of the EPO official languages on 14.02.2008 takes the place of the publication of the European patent application. | [2009/18] | Type: | B1 Patent specification | No.: | EP2051659 | Date: | 11.04.2018 | Language: | DE | [2018/15] | Search report(s) | International search report - published on: | EP | 24.12.2008 | Classification | IPC: | A61L27/30, A61C8/00, C23C24/08, C23C26/00, C23C30/00, A61L27/56, A61F2/30 | [2017/43] | CPC: |
A61F2/30767 (EP,US);
A61L27/30 (EP,US);
A61L27/56 (EP,US);
C04B41/009 (EP,US);
C04B41/5025 (EP,US);
C04B41/5042 (EP,US);
C04B41/87 (EP,US);
C23C24/08 (EP,US);
C23C26/00 (EP,US);
C23C30/00 (EP,US);
A61C8/0012 (EP,US);
A61F2/3094 (EP,US);
A61F2002/30968 (EP,US);
A61F2310/00185 (EP,US);
A61F2310/00203 (EP,US);
A61F2310/00239 (EP,US);
A61F2310/00269 (EP,US);
A61F2310/00281 (EP,US);
A61F2310/00299 (EP,US);
A61F2310/00317 (EP,US);
A61F2310/00329 (EP,US);
A61F2310/00592 (EP,US);
A61F2310/00604 (EP,US);
A61F2310/00634 (EP,US);
| C-Set: |
C04B41/009, C04B35/00 (US,EP);
C04B41/009, C04B35/48 (EP,US);
C04B41/5025, C04B41/4539, C04B41/455, C04B41/4582 (US,EP);
C04B41/5042, C04B41/4539, C04B41/455, C04B41/4582 (US,EP) |
Former IPC [2009/18] | A61F2/00, A61F2/28, A61F2/30, A61K9/00, A61L31/08, A61L31/14, A61L27/56 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, PL, PT, RO, SE, SI, SK, TR [2018/15] |
Former [2009/18] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, PL, PT, RO, SE, SI, SK, TR | Title | German: | VERFAHREN ZUM HERSTELLEN EINER PORÖSEN, KERAMISCHEN OBERFLÄCHENSCHICHT | [2009/18] | English: | METHOD FOR THE PRODUCTION OF A POROUS, CERAMIC SURFACE LAYER | [2009/18] | French: | PROCÉDÉ POUR LA PRÉPARATION D'UNE COUCHE SUPERFICIELLE CÉRAMIQUE POREUSE | [2009/18] | Entry into regional phase | 09.03.2009 | National basic fee paid | 24.06.2009 | Designation fee(s) paid | 24.06.2009 | Examination fee paid | Examination procedure | 24.06.2009 | Examination requested [2009/32] | 28.01.2010 | Despatch of a communication from the examining division (Time limit: M04) | 07.06.2010 | Reply to a communication from the examining division | 06.09.2012 | Despatch of a communication from the examining division (Time limit: M04) | 14.01.2013 | Reply to a communication from the examining division | 23.02.2015 | Despatch of a communication from the examining division (Time limit: M06) | 01.09.2015 | Reply to a communication from the examining division | 07.12.2016 | Despatch of a communication from the examining division (Time limit: M04) | 01.03.2017 | Reply to a communication from the examining division | 08.11.2017 | Communication of intention to grant the patent | 02.03.2018 | Fee for grant paid | 02.03.2018 | Fee for publishing/printing paid | 02.03.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 28.01.2010 | Opposition(s) | 14.01.2019 | No opposition filed within time limit [2019/12] | Fees paid | Renewal fee | 31.08.2009 | Renewal fee patent year 03 | 31.08.2010 | Renewal fee patent year 04 | 31.08.2011 | Renewal fee patent year 05 | 31.08.2012 | Renewal fee patent year 06 | 02.09.2013 | Renewal fee patent year 07 | 01.09.2014 | Renewal fee patent year 08 | 31.08.2015 | Renewal fee patent year 09 | 31.08.2016 | Renewal fee patent year 10 | 31.08.2017 | Renewal fee patent year 11 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 08.08.2007 | CY | 11.04.2018 | CZ | 11.04.2018 | DK | 11.04.2018 | EE | 11.04.2018 | FI | 11.04.2018 | IT | 11.04.2018 | LT | 11.04.2018 | LV | 11.04.2018 | MC | 11.04.2018 | MT | 11.04.2018 | NL | 11.04.2018 | PL | 11.04.2018 | RO | 11.04.2018 | SE | 11.04.2018 | SI | 11.04.2018 | SK | 11.04.2018 | TR | 11.04.2018 | BG | 11.07.2018 | GR | 12.07.2018 | AT | 08.08.2018 | IE | 08.08.2018 | LU | 08.08.2018 | IS | 11.08.2018 | PT | 13.08.2018 | BE | 31.08.2018 | [2020/32] |
Former [2020/28] | HU | 08.08.2007 | |
CZ | 11.04.2018 | ||
DK | 11.04.2018 | ||
EE | 11.04.2018 | ||
FI | 11.04.2018 | ||
IT | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
MC | 11.04.2018 | ||
MT | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
RO | 11.04.2018 | ||
SE | 11.04.2018 | ||
SI | 11.04.2018 | ||
SK | 11.04.2018 | ||
TR | 11.04.2018 | ||
BG | 11.07.2018 | ||
GR | 12.07.2018 | ||
AT | 08.08.2018 | ||
IE | 08.08.2018 | ||
LU | 08.08.2018 | ||
PT | 13.08.2018 | ||
BE | 31.08.2018 | ||
Former [2020/16] | CZ | 11.04.2018 | |
DK | 11.04.2018 | ||
EE | 11.04.2018 | ||
FI | 11.04.2018 | ||
IT | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
MC | 11.04.2018 | ||
MT | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
RO | 11.04.2018 | ||
SE | 11.04.2018 | ||
SI | 11.04.2018 | ||
SK | 11.04.2018 | ||
TR | 11.04.2018 | ||
BG | 11.07.2018 | ||
GR | 12.07.2018 | ||
AT | 08.08.2018 | ||
IE | 08.08.2018 | ||
LU | 08.08.2018 | ||
PT | 13.08.2018 | ||
BE | 31.08.2018 | ||
Former [2020/08] | CZ | 11.04.2018 | |
DK | 11.04.2018 | ||
EE | 11.04.2018 | ||
FI | 11.04.2018 | ||
IT | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
MC | 11.04.2018 | ||
MT | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
RO | 11.04.2018 | ||
SE | 11.04.2018 | ||
SI | 11.04.2018 | ||
SK | 11.04.2018 | ||
BG | 11.07.2018 | ||
GR | 12.07.2018 | ||
AT | 08.08.2018 | ||
IE | 08.08.2018 | ||
LU | 08.08.2018 | ||
PT | 13.08.2018 | ||
BE | 31.08.2018 | ||
Former [2020/03] | CZ | 11.04.2018 | |
DK | 11.04.2018 | ||
EE | 11.04.2018 | ||
FI | 11.04.2018 | ||
IT | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
MC | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
RO | 11.04.2018 | ||
SE | 11.04.2018 | ||
SI | 11.04.2018 | ||
SK | 11.04.2018 | ||
BG | 11.07.2018 | ||
GR | 12.07.2018 | ||
AT | 08.08.2018 | ||
IE | 08.08.2018 | ||
LU | 08.08.2018 | ||
PT | 13.08.2018 | ||
BE | 31.08.2018 | ||
Former [2019/38] | CZ | 11.04.2018 | |
DK | 11.04.2018 | ||
EE | 11.04.2018 | ||
FI | 11.04.2018 | ||
IT | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
MC | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
RO | 11.04.2018 | ||
SE | 11.04.2018 | ||
SI | 11.04.2018 | ||
SK | 11.04.2018 | ||
BG | 11.07.2018 | ||
GR | 12.07.2018 | ||
IE | 08.08.2018 | ||
LU | 08.08.2018 | ||
PT | 13.08.2018 | ||
BE | 31.08.2018 | ||
Former [2019/33] | CZ | 11.04.2018 | |
DK | 11.04.2018 | ||
EE | 11.04.2018 | ||
FI | 11.04.2018 | ||
IT | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
MC | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
RO | 11.04.2018 | ||
SE | 11.04.2018 | ||
SI | 11.04.2018 | ||
SK | 11.04.2018 | ||
BG | 11.07.2018 | ||
GR | 12.07.2018 | ||
IE | 08.08.2018 | ||
LU | 08.08.2018 | ||
PT | 13.08.2018 | ||
Former [2019/26] | CZ | 11.04.2018 | |
DK | 11.04.2018 | ||
EE | 11.04.2018 | ||
FI | 11.04.2018 | ||
IT | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
MC | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
RO | 11.04.2018 | ||
SE | 11.04.2018 | ||
SI | 11.04.2018 | ||
SK | 11.04.2018 | ||
BG | 11.07.2018 | ||
GR | 12.07.2018 | ||
LU | 08.08.2018 | ||
PT | 13.08.2018 | ||
Former [2019/21] | CZ | 11.04.2018 | |
DK | 11.04.2018 | ||
EE | 11.04.2018 | ||
FI | 11.04.2018 | ||
IT | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
MC | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
RO | 11.04.2018 | ||
SE | 11.04.2018 | ||
SK | 11.04.2018 | ||
BG | 11.07.2018 | ||
GR | 12.07.2018 | ||
LU | 08.08.2018 | ||
PT | 13.08.2018 | ||
Former [2019/15] | CZ | 11.04.2018 | |
DK | 11.04.2018 | ||
EE | 11.04.2018 | ||
FI | 11.04.2018 | ||
IT | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
MC | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
RO | 11.04.2018 | ||
SE | 11.04.2018 | ||
SK | 11.04.2018 | ||
BG | 11.07.2018 | ||
GR | 12.07.2018 | ||
PT | 13.08.2018 | ||
Former [2019/12] | CZ | 11.04.2018 | |
DK | 11.04.2018 | ||
EE | 11.04.2018 | ||
FI | 11.04.2018 | ||
IT | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
RO | 11.04.2018 | ||
SE | 11.04.2018 | ||
SK | 11.04.2018 | ||
BG | 11.07.2018 | ||
GR | 12.07.2018 | ||
PT | 13.08.2018 | ||
Former [2019/10] | CZ | 11.04.2018 | |
DK | 11.04.2018 | ||
EE | 11.04.2018 | ||
FI | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
RO | 11.04.2018 | ||
SE | 11.04.2018 | ||
SK | 11.04.2018 | ||
BG | 11.07.2018 | ||
GR | 12.07.2018 | ||
PT | 13.08.2018 | ||
Former [2019/09] | DK | 11.04.2018 | |
EE | 11.04.2018 | ||
FI | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
SE | 11.04.2018 | ||
BG | 11.07.2018 | ||
GR | 12.07.2018 | ||
PT | 13.08.2018 | ||
Former [2019/08] | DK | 11.04.2018 | |
FI | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
SE | 11.04.2018 | ||
BG | 11.07.2018 | ||
GR | 12.07.2018 | ||
PT | 13.08.2018 | ||
Former [2019/03] | FI | 11.04.2018 | |
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
SE | 11.04.2018 | ||
BG | 11.07.2018 | ||
GR | 12.07.2018 | ||
PT | 13.08.2018 | ||
Former [2018/52] | FI | 11.04.2018 | |
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
SE | 11.04.2018 | ||
BG | 11.07.2018 | ||
GR | 12.07.2018 | ||
Former [2018/51] | FI | 11.04.2018 | |
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
SE | 11.04.2018 | ||
BG | 11.07.2018 | ||
Former [2018/49] | FI | 11.04.2018 | |
LT | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
SE | 11.04.2018 | ||
BG | 11.07.2018 | ||
Former [2018/47] | FI | 11.04.2018 | |
LT | 11.04.2018 | ||
NL | 11.04.2018 | ||
Former [2018/43] | NL | 11.04.2018 | Cited in | International search | [A]US4374669 (MAC GREGOR DAVID C [CA]) [A] * column 1, lines 49-64 * * column 3, line 19 - column 4, line 23 * * column 9, lines 14-18,45-54 ** column 10, lines 17-19,25 *; | [X]US4737411 (GRAVES JR GEORGE A [US], et al) [X] 1,4-8,12-14 * column 2, lines 63,64 * * column 3, lines 47-49 * * column 4, lines 30-33; table 1 * * column 5, lines 21-23 * * column 6, lines 44-52 *; | [A]EP0269745 (SUMITOMO CEMENT CO [JP]) [A] 1-17 * page 14, line 24 - page 15, line 5 * * page 18, lines 18-24 * * page 8; table 1 *; | [X]EP0607017 (TDK CORP [JP]) [X] 1-17 * page 2, lines 54,55 * * page 3, lines 29-31 * * page 7, lines 8-12 * * page 8, lines 12,14 * * page 10, lines 10-13 * |