blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2036252

EP2036252 - METHOD OF CONFIGURING A MULTI-NETWORK TERMINAL AND ASSOCIATED MULTI-NETWORK TERMINAL [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  15.06.2012
Database last updated on 13.09.2024
Most recent event   Tooltip18.07.2014Lapse of the patent in a contracting state
New state(s): HU
published on 20.08.2014  [2014/34]
Applicant(s)For all designated states
FRANCE TELECOM
6 Place d'Alleray
75015 Paris / FR
[N/P]
Former [2011/32]For all designated states
FRANCE TELECOM
6 place d'Alleray
75015 Paris / FR
Former [2011/32]For all designated states
FRANCE TELECOM
6 Place d'Alleray
75015 Paris / FR
Former [2009/12]For all designated states
France Télécom
6 Place d'Alleray
75015 Paris / FR
Inventor(s)01 / AUVRAY, Vincent
1452, rue du Val Avril
50460 Tonneville / FR
02 / BAUBAN, Patrick
19, rue Domremy APT D 56
F-75013 Paris / FR
 [2009/12]
Application number, filing date07803890.819.06.2007
[2009/12]
WO2007FR51463
Priority number, dateFR2006005276403.07.2006         Original published format: FR 0652764
[2009/12]
Filing languageFR
Procedural languageFR
PublicationType: A2 Application without search report
No.:WO2008003882
Date:10.01.2008
Language:FR
[2008/02]
Type: A2 Application without search report 
No.:EP2036252
Date:18.03.2009
Language:FR
The application published by WIPO in one of the EPO official languages on 10.01.2008 takes the place of the publication of the European patent application.
[2009/12]
Type: B1 Patent specification 
No.:EP2036252
Date:10.08.2011
Language:FR
[2011/32]
Search report(s)International search report - published on:EP06.03.2008
ClassificationIPC:H04L12/24
[2009/12]
CPC:
H04W4/24 (EP,US); H04L41/052 (EP,US); H04W48/18 (EP,US);
H04M2215/2026 (EP,US); H04W88/06 (EP,US)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MT,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2009/12]
Extension statesALNot yet paid
BANot yet paid
HRNot yet paid
MKNot yet paid
RSNot yet paid
TitleGerman:VERFAHREN ZUR KONFIGURATION EINES MULTINETZWERK-ENDGERÄTES UND ENTSPRECHENDES MULTINETZWERK-ENDGERÄT[2009/12]
English:METHOD OF CONFIGURING A MULTI-NETWORK TERMINAL AND ASSOCIATED MULTI-NETWORK TERMINAL[2009/12]
French:PROCEDE DE CONFIGURATION D'UN TERMINAL MULTI RESEAUX ET TERMINAL MULTI-RESEAUX ASSOCIE[2009/12]
Entry into regional phase16.12.2008National basic fee paid 
16.12.2008Designation fee(s) paid 
16.12.2008Examination fee paid 
Examination procedure16.12.2008Examination requested  [2009/12]
02.10.2009Despatch of a communication from the examining division (Time limit: M06)
08.04.2010Reply to a communication from the examining division
11.03.2011Communication of intention to grant the patent
08.06.2011Fee for grant paid
08.06.2011Fee for publishing/printing paid
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  02.10.2009
Opposition(s)11.05.2012No opposition filed within time limit [2012/29]
Fees paidRenewal fee
29.06.2009Renewal fee patent year 03
29.06.2010Renewal fee patent year 04
29.06.2011Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU19.06.2007
AT10.08.2011
CY10.08.2011
CZ10.08.2011
DK10.08.2011
EE10.08.2011
FI10.08.2011
IE10.08.2011
IT10.08.2011
LT10.08.2011
LV10.08.2011
MT10.08.2011
NL10.08.2011
PL10.08.2011
RO10.08.2011
SE10.08.2011
SI10.08.2011
SK10.08.2011
TR10.08.2011
BG10.11.2011
GR11.11.2011
ES21.11.2011
IS10.12.2011
PT12.12.2011
[2014/34]
Former [2014/21]AT10.08.2011
CY10.08.2011
CZ10.08.2011
DK10.08.2011
EE10.08.2011
FI10.08.2011
IE10.08.2011
IT10.08.2011
LT10.08.2011
LV10.08.2011
MT10.08.2011
NL10.08.2011
PL10.08.2011
RO10.08.2011
SE10.08.2011
SI10.08.2011
SK10.08.2011
TR10.08.2011
BG10.11.2011
GR11.11.2011
ES21.11.2011
IS10.12.2011
PT12.12.2011
Former [2013/35]AT10.08.2011
CY10.08.2011
CZ10.08.2011
DK10.08.2011
EE10.08.2011
FI10.08.2011
IE10.08.2011
IT10.08.2011
LT10.08.2011
LV10.08.2011
MT10.08.2011
NL10.08.2011
PL10.08.2011
RO10.08.2011
SE10.08.2011
SI10.08.2011
SK10.08.2011
BG10.11.2011
GR11.11.2011
ES21.11.2011
IS10.12.2011
PT12.12.2011
Former [2013/29]AT10.08.2011
CY10.08.2011
CZ10.08.2011
DK10.08.2011
EE10.08.2011
FI10.08.2011
IE10.08.2011
IT10.08.2011
LT10.08.2011
LV10.08.2011
NL10.08.2011
PL10.08.2011
RO10.08.2011
SE10.08.2011
SI10.08.2011
SK10.08.2011
BG10.11.2011
GR11.11.2011
ES21.11.2011
IS10.12.2011
PT12.12.2011
Former [2013/22]AT10.08.2011
CY10.08.2011
CZ10.08.2011
DK10.08.2011
EE10.08.2011
FI10.08.2011
IE10.08.2011
IT10.08.2011
LT10.08.2011
LV10.08.2011
NL10.08.2011
PL10.08.2011
RO10.08.2011
SE10.08.2011
SI10.08.2011
SK10.08.2011
GR11.11.2011
ES21.11.2011
IS10.12.2011
PT12.12.2011
Former [2012/33]AT10.08.2011
CY10.08.2011
CZ10.08.2011
DK10.08.2011
EE10.08.2011
FI10.08.2011
IE10.08.2011
IT10.08.2011
LT10.08.2011
LV10.08.2011
NL10.08.2011
PL10.08.2011
RO10.08.2011
SE10.08.2011
SI10.08.2011
SK10.08.2011
GR11.11.2011
IS10.12.2011
PT12.12.2011
Former [2012/23]AT10.08.2011
CY10.08.2011
CZ10.08.2011
EE10.08.2011
FI10.08.2011
IE10.08.2011
IT10.08.2011
LT10.08.2011
LV10.08.2011
NL10.08.2011
PL10.08.2011
RO10.08.2011
SE10.08.2011
SI10.08.2011
SK10.08.2011
GR11.11.2011
IS10.12.2011
PT12.12.2011
Former [2012/21]AT10.08.2011
CY10.08.2011
CZ10.08.2011
FI10.08.2011
IE10.08.2011
LT10.08.2011
LV10.08.2011
NL10.08.2011
PL10.08.2011
SE10.08.2011
SI10.08.2011
GR11.11.2011
IS10.12.2011
PT12.12.2011
Former [2012/20]AT10.08.2011
CY10.08.2011
FI10.08.2011
IE10.08.2011
LT10.08.2011
LV10.08.2011
NL10.08.2011
PL10.08.2011
SE10.08.2011
SI10.08.2011
GR11.11.2011
IS10.12.2011
PT12.12.2011
Former [2012/12]AT10.08.2011
CY10.08.2011
FI10.08.2011
LT10.08.2011
LV10.08.2011
NL10.08.2011
PL10.08.2011
SE10.08.2011
SI10.08.2011
GR11.11.2011
IS10.12.2011
PT12.12.2011
Cited inInternational search[X]US2006120329  (KIM JAE-PYEONG [KR], et al) [X] 1-7 * paragraph [0063] - paragraph [0077]; figure 3 *;
 [A]  - HAO-HUA CHU ET AL, Challenges: wireless web services, PARALLEL AND DISTRIBUTED SYSTEMS, 2004. ICPADS 2004. PROCEEDINGS. TENTH INTERNATIONAL CONFERENCE ON NEWPORT BEACH, CA, USA 7-9 JULY 2004, PISCATAWAY, NJ, USA,IEEE, PAGE(S) 657-664, (20040707), ISBN 0-7695-2152-5, XP010710658 [A] 1,4,6,7 * page 4 * * page 7 *

DOI:   http://dx.doi.org/10.1109/ICPADS.2004.1316152
 [A]  - RUIZ P M ET AL, Adaptive multimedia multi-party communication in ad hoc environments, SYSTEM SCIENCES, 2004. PROCEEDINGS OF THE 37TH ANNUAL HAWAII INTERNATIONAL CONFERENCE ON 5-8 JAN. 2004, PISCATAWAY, NJ, USA,IEEE, PAGE(S) 293-302, (20040105), ISBN 0-7695-2056-1, XP010682893 [A] 1,4,6,7 * page 6, column L, paragraph 1 *

DOI:   http://dx.doi.org/10.1109/HICSS.2004.1265691
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.