EP2086822 - TRACTION CHAIN ASSEMBLY FOR ELASTOMERIC TRACKS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.04.2013 Database last updated on 31.05.2024 | Most recent event Tooltip | 18.07.2014 | Lapse of the patent in a contracting state New state(s): HU | published on 20.08.2014 [2014/34] | Applicant(s) | For all designated states Soucy International Inc. 5195 Rue Richard Drummondville QC J2E 1AG / CA | [2009/33] | Inventor(s) | 01 /
BRETON, Rémi 1010, des Bâtisseurs Drummondville, Québec J2C 8K5 / CA | 02 /
ROY, Danny 97, Boisvert Drummondville, Québec J2C 2W8 / CA | [2009/33] | Representative(s) | Vuillermoz, Bruno, et al Cabinet Laurent & Charras "Le Contemporain" 50, Chemin de la Bruyère 69574 Dardilly Cédex / FR | [N/P] |
Former [2009/33] | Vuillermoz, Bruno, et al Cabinet Laurent & Charras "Le Contemporain" 50, Chemin de la Bruyère 69574 Dardilly Cédex / FR | Application number, filing date | 07816158.5 | 09.11.2007 | [2009/33] | WO2007CA02013 | Priority number, date | CA20062567645 | 09.11.2006 Original published format: CA 2567645 | [2009/33] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2008055352 | Date: | 15.05.2008 | Language: | EN | [2008/20] | Type: | A1 Application with search report | No.: | EP2086822 | Date: | 12.08.2009 | Language: | EN | The application published by WIPO in one of the EPO official languages on 15.05.2008 takes the place of the publication of the European patent application. | [2009/33] | Type: | B1 Patent specification | No.: | EP2086822 | Date: | 06.06.2012 | Language: | EN | [2012/23] | Search report(s) | International search report - published on: | CA | 15.05.2008 | (Supplementary) European search report - dispatched on: | EP | 06.07.2010 | Classification | IPC: | B62D55/28, B62D55/20, B60C27/06 | [2009/33] | CPC: |
B62D55/24 (EP,US);
B62D55/28 (EP,US)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, PL, PT, RO, SE, SI, SK, TR [2009/33] | Title | German: | TRAKTIONSKETTENANORDNUNG FÜR ELASTOMERE KETTEN | [2009/33] | English: | TRACTION CHAIN ASSEMBLY FOR ELASTOMERIC TRACKS | [2009/33] | French: | ENSEMBLE CHAÎNE DE TRACTION POUR CHENILLES ÉLASTOMÈRES | [2009/33] | Entry into regional phase | 27.05.2009 | National basic fee paid | 27.05.2009 | Search fee paid | 27.05.2009 | Designation fee(s) paid | 27.05.2009 | Examination fee paid | Examination procedure | 27.05.2009 | Examination requested [2009/33] | 18.12.2010 | Amendment by applicant (claims and/or description) | 28.12.2011 | Communication of intention to grant the patent | 16.04.2012 | Fee for grant paid | 16.04.2012 | Fee for publishing/printing paid | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 28.12.2011 | Opposition(s) | 07.03.2013 | No opposition filed within time limit [2013/20] | Fees paid | Renewal fee | 24.11.2009 | Renewal fee patent year 03 | 24.01.2011 | Renewal fee patent year 04 | 23.11.2011 | Renewal fee patent year 05 | Penalty fee | Additional fee for renewal fee | 30.11.2010 | 04   M06   Fee paid on   24.01.2011 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 09.11.2007 | AT | 06.06.2012 | BE | 06.06.2012 | CY | 06.06.2012 | CZ | 06.06.2012 | EE | 06.06.2012 | LT | 06.06.2012 | LV | 06.06.2012 | MT | 06.06.2012 | NL | 06.06.2012 | PL | 06.06.2012 | RO | 06.06.2012 | SI | 06.06.2012 | SK | 06.06.2012 | TR | 06.06.2012 | BG | 06.09.2012 | GR | 07.09.2012 | IS | 06.10.2012 | PT | 08.10.2012 | IE | 09.11.2012 | LU | 09.11.2012 | CH | 30.11.2012 | LI | 30.11.2012 | MC | 30.11.2012 | [2014/34] |
Former [2014/27] | AT | 06.06.2012 | |
BE | 06.06.2012 | ||
CY | 06.06.2012 | ||
CZ | 06.06.2012 | ||
EE | 06.06.2012 | ||
LT | 06.06.2012 | ||
LV | 06.06.2012 | ||
MT | 06.06.2012 | ||
NL | 06.06.2012 | ||
PL | 06.06.2012 | ||
RO | 06.06.2012 | ||
SI | 06.06.2012 | ||
SK | 06.06.2012 | ||
TR | 06.06.2012 | ||
BG | 06.09.2012 | ||
GR | 07.09.2012 | ||
IS | 06.10.2012 | ||
PT | 08.10.2012 | ||
IE | 09.11.2012 | ||
LU | 09.11.2012 | ||
CH | 30.11.2012 | ||
LI | 30.11.2012 | ||
MC | 30.11.2012 | ||
Former [2014/21] | AT | 06.06.2012 | |
BE | 06.06.2012 | ||
CY | 06.06.2012 | ||
CZ | 06.06.2012 | ||
EE | 06.06.2012 | ||
LT | 06.06.2012 | ||
LV | 06.06.2012 | ||
MT | 06.06.2012 | ||
NL | 06.06.2012 | ||
PL | 06.06.2012 | ||
RO | 06.06.2012 | ||
SI | 06.06.2012 | ||
SK | 06.06.2012 | ||
TR | 06.06.2012 | ||
BG | 06.09.2012 | ||
GR | 07.09.2012 | ||
IS | 06.10.2012 | ||
PT | 08.10.2012 | ||
IE | 09.11.2012 | ||
CH | 30.11.2012 | ||
LI | 30.11.2012 | ||
MC | 30.11.2012 | ||
Former [2013/51] | AT | 06.06.2012 | |
BE | 06.06.2012 | ||
CY | 06.06.2012 | ||
CZ | 06.06.2012 | ||
EE | 06.06.2012 | ||
LT | 06.06.2012 | ||
LV | 06.06.2012 | ||
MT | 06.06.2012 | ||
NL | 06.06.2012 | ||
PL | 06.06.2012 | ||
RO | 06.06.2012 | ||
SI | 06.06.2012 | ||
SK | 06.06.2012 | ||
BG | 06.09.2012 | ||
GR | 07.09.2012 | ||
IS | 06.10.2012 | ||
PT | 08.10.2012 | ||
IE | 09.11.2012 | ||
CH | 30.11.2012 | ||
LI | 30.11.2012 | ||
Former [2013/47] | AT | 06.06.2012 | |
BE | 06.06.2012 | ||
CY | 06.06.2012 | ||
CZ | 06.06.2012 | ||
EE | 06.06.2012 | ||
LT | 06.06.2012 | ||
LV | 06.06.2012 | ||
NL | 06.06.2012 | ||
PL | 06.06.2012 | ||
RO | 06.06.2012 | ||
SI | 06.06.2012 | ||
SK | 06.06.2012 | ||
BG | 06.09.2012 | ||
GR | 07.09.2012 | ||
IS | 06.10.2012 | ||
PT | 08.10.2012 | ||
IE | 09.11.2012 | ||
CH | 30.11.2012 | ||
LI | 30.11.2012 | ||
Former [2013/34] | AT | 06.06.2012 | |
BE | 06.06.2012 | ||
CY | 06.06.2012 | ||
CZ | 06.06.2012 | ||
EE | 06.06.2012 | ||
LT | 06.06.2012 | ||
LV | 06.06.2012 | ||
NL | 06.06.2012 | ||
PL | 06.06.2012 | ||
RO | 06.06.2012 | ||
SI | 06.06.2012 | ||
SK | 06.06.2012 | ||
BG | 06.09.2012 | ||
GR | 07.09.2012 | ||
IS | 06.10.2012 | ||
PT | 08.10.2012 | ||
CH | 30.11.2012 | ||
LI | 30.11.2012 | ||
Former [2013/33] | AT | 06.06.2012 | |
BE | 06.06.2012 | ||
CY | 06.06.2012 | ||
CZ | 06.06.2012 | ||
EE | 06.06.2012 | ||
LT | 06.06.2012 | ||
LV | 06.06.2012 | ||
NL | 06.06.2012 | ||
PL | 06.06.2012 | ||
RO | 06.06.2012 | ||
SI | 06.06.2012 | ||
SK | 06.06.2012 | ||
GR | 07.09.2012 | ||
IS | 06.10.2012 | ||
PT | 08.10.2012 | ||
CH | 30.11.2012 | ||
LI | 30.11.2012 | ||
Former [2013/13] | AT | 06.06.2012 | |
BE | 06.06.2012 | ||
CY | 06.06.2012 | ||
CZ | 06.06.2012 | ||
EE | 06.06.2012 | ||
LT | 06.06.2012 | ||
LV | 06.06.2012 | ||
NL | 06.06.2012 | ||
PL | 06.06.2012 | ||
RO | 06.06.2012 | ||
SI | 06.06.2012 | ||
SK | 06.06.2012 | ||
GR | 07.09.2012 | ||
IS | 06.10.2012 | ||
PT | 08.10.2012 | ||
Former [2013/11] | AT | 06.06.2012 | |
BE | 06.06.2012 | ||
CY | 06.06.2012 | ||
CZ | 06.06.2012 | ||
EE | 06.06.2012 | ||
LT | 06.06.2012 | ||
LV | 06.06.2012 | ||
NL | 06.06.2012 | ||
PL | 06.06.2012 | ||
RO | 06.06.2012 | ||
SI | 06.06.2012 | ||
SK | 06.06.2012 | ||
GR | 07.09.2012 | ||
IS | 06.10.2012 | ||
Former [2013/10] | AT | 06.06.2012 | |
BE | 06.06.2012 | ||
CY | 06.06.2012 | ||
CZ | 06.06.2012 | ||
EE | 06.06.2012 | ||
LT | 06.06.2012 | ||
LV | 06.06.2012 | ||
NL | 06.06.2012 | ||
RO | 06.06.2012 | ||
SI | 06.06.2012 | ||
SK | 06.06.2012 | ||
GR | 07.09.2012 | ||
IS | 06.10.2012 | ||
Former [2013/09] | AT | 06.06.2012 | |
BE | 06.06.2012 | ||
CY | 06.06.2012 | ||
EE | 06.06.2012 | ||
LT | 06.06.2012 | ||
LV | 06.06.2012 | ||
NL | 06.06.2012 | ||
SI | 06.06.2012 | ||
GR | 07.09.2012 | ||
Former [2013/08] | AT | 06.06.2012 | |
BE | 06.06.2012 | ||
CY | 06.06.2012 | ||
LT | 06.06.2012 | ||
LV | 06.06.2012 | ||
NL | 06.06.2012 | ||
SI | 06.06.2012 | ||
GR | 07.09.2012 | ||
Former [2013/07] | AT | 06.06.2012 | |
BE | 06.06.2012 | ||
CY | 06.06.2012 | ||
LT | 06.06.2012 | ||
LV | 06.06.2012 | ||
SI | 06.06.2012 | ||
GR | 07.09.2012 | ||
Former [2012/51] | CY | 06.06.2012 | |
LT | 06.06.2012 | ||
LV | 06.06.2012 | ||
SI | 06.06.2012 | ||
GR | 07.09.2012 | ||
Former [2012/50] | CY | 06.06.2012 | |
LT | 06.06.2012 | ||
LV | 06.06.2012 | ||
GR | 07.09.2012 | ||
Former [2012/49] | CY | 06.06.2012 | |
LT | 06.06.2012 | ||
Former [2012/47] | LT | 06.06.2012 | Documents cited: | Search | [Y]JPH1016836 (IWAFUJI KOGYO KK) [Y] 1-20 * abstract *; | [YD]EP1518719 (RUD KETTEN RIEGER & DIETZ [DE]) [YD] 1-20 * paragraphs [0006] - [0010]; figures 1-5 *; | [Y]JP2000233777 (ONODERA HIROSHI) [Y] 1-20 * abstract *; | [Y]US6539995 (AIROLDI ROMOLO [IT], et al) [Y] 1-20 * figures 1a,1b *; | [YP]CA2511866 (SOUCY INT INC [CA]) [YP] 1-20 * the whole document * | International search | [Y]EP1518719 (RUD KETTEN RIEGER & DIETZ [DE]); | [Y]JP2005263090 (TAKEISHI SEIJI); | [Y]JP2000233777 (ONODERA HIROSHI); | [Y]US6539995 (AIROLDI ROMOLO [IT], et al); | [YP]CA2511866 (SOUCY INT INC [CA]); | [A]DE10354486 (BUNDESREP DEUTSCHLAND [DE]) |