EP2198215 - HEAT EXCHANGER AND METHOD FOR A REFRIGERATION SYSTEM [Right-click to bookmark this link] | |||
Former [2010/25] | METHODS AND SYSTEMS FOR UTILIZING A MINI-CHANNEL HEAT-EXCHANGER DEVICE IN A REFRIGERATION CIRCUIT | ||
[2018/52] | Status | No opposition filed within time limit Status updated on 27.03.2020 Database last updated on 10.07.2024 | |
Former | The patent has been granted Status updated on 19.04.2019 | ||
Former | Grant of patent is intended Status updated on 04.12.2018 | ||
Former | Examination is in progress Status updated on 19.05.2017 | Most recent event Tooltip | 23.07.2021 | Lapse of the patent in a contracting state New state(s): MT | published on 25.08.2021 [2021/34] | Applicant(s) | For all designated states Carrier Corporation Carrier World Headquarters, One Carrier Place Farmington, CT 06034-4015 / US | [2010/25] | Inventor(s) | 01 /
MACRI, Salvatore Via Caduti In Missione De Pace, 3 I-20134 Milano / IT | [2010/25] | Representative(s) | Dehns St. Bride's House 10 Salisbury Square London EC4Y 8JD / GB | [N/P] |
Former [2019/21] | Dehns St. Brides House 10 Salisbury Square London EC4Y 8JD / GB | ||
Former [2010/25] | Taylor, Adam David Dehns St. Bride's House 10 Salisbury Square London EC4Y 8JD / GB | Application number, filing date | 07838285.0 | 14.09.2007 | [2010/25] | WO2007US20057 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2009035440 | Date: | 19.03.2009 | Language: | EN | [2009/12] | Type: | A1 Application with search report | No.: | EP2198215 | Date: | 23.06.2010 | Language: | EN | The application published by WIPO in one of the EPO official languages on 19.03.2009 takes the place of the publication of the European patent application. | [2010/25] | Type: | B1 Patent specification | No.: | EP2198215 | Date: | 22.05.2019 | Language: | EN | [2019/21] | Search report(s) | International search report - published on: | US | 19.03.2009 | (Supplementary) European search report - dispatched on: | EP | 12.11.2013 | Classification | IPC: | F25B39/00, F25B45/00, // F28D1/053, F28D21/00, F25B13/00 | [2013/50] | CPC: |
F25B39/00 (EP,US);
F25B45/00 (EP,US);
F28D1/05391 (EP,US);
F25B13/00 (EP,US);
F25B2400/16 (EP,US);
F25B2400/19 (EP,US);
|
Former IPC [2010/25] | F25B39/02 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, PL, PT, RO, SE, SI, SK, TR [2019/21] |
Former [2010/25] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, PL, PT, RO, SE, SI, SK, TR | Title | German: | WÄRMETAUSCHER UND VERFAHREN FÜR EINEN KÄLTEKREISLAUF | [2018/52] | English: | HEAT EXCHANGER AND METHOD FOR A REFRIGERATION SYSTEM | [2018/52] | French: | DISPOSITIF ÉCHANGEUR DE CHALEUR ET PROCÉDÉ POUR UN CIRCUIT DE RÉFRIGÉRATION | [2018/52] |
Former [2010/25] | VERFAHREN UND SYSTEME ZUR VERWENDUNG EINER MINIKANALWÄRMETAUSCHERVORRICHTUNG IN EINEM KÄLTEKREISLAUF | ||
Former [2010/25] | METHODS AND SYSTEMS FOR UTILIZING A MINI-CHANNEL HEAT-EXCHANGER DEVICE IN A REFRIGERATION CIRCUIT | ||
Former [2010/25] | PROCÉDÉS ET SYSTÈMES POUR UTILISER UN DISPOSITIF D'ÉCHANGEURS DE CHALEUR À MINI CANAUX DANS UN CIRCUIT DE RÉFRIGÉRATION | Entry into regional phase | 22.02.2010 | National basic fee paid | 22.02.2010 | Search fee paid | 22.02.2010 | Designation fee(s) paid | 22.02.2010 | Examination fee paid | Examination procedure | 23.05.2008 | Request for preliminary examination filed International Preliminary Examining Authority: US | 22.02.2010 | Examination requested [2010/25] | 27.05.2014 | Amendment by applicant (claims and/or description) | 19.05.2017 | Despatch of a communication from the examining division (Time limit: M04) | 29.09.2017 | Reply to a communication from the examining division | 01.03.2018 | Despatch of a communication from the examining division (Time limit: M04) | 11.07.2018 | Reply to a communication from the examining division | 05.12.2018 | Communication of intention to grant the patent | 10.04.2019 | Fee for grant paid | 10.04.2019 | Fee for publishing/printing paid | 10.04.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 19.05.2017 | Opposition(s) | 25.02.2020 | No opposition filed within time limit [2020/18] | Fees paid | Renewal fee | 22.02.2010 | Renewal fee patent year 03 | 24.09.2010 | Renewal fee patent year 04 | 29.09.2011 | Renewal fee patent year 05 | 12.09.2012 | Renewal fee patent year 06 | 12.09.2013 | Renewal fee patent year 07 | 12.09.2014 | Renewal fee patent year 08 | 28.09.2015 | Renewal fee patent year 09 | 23.09.2016 | Renewal fee patent year 10 | 22.09.2017 | Renewal fee patent year 11 | 21.09.2018 | Renewal fee patent year 12 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 14.09.2007 | AT | 22.05.2019 | CY | 22.05.2019 | CZ | 22.05.2019 | DK | 22.05.2019 | EE | 22.05.2019 | FI | 22.05.2019 | LT | 22.05.2019 | LV | 22.05.2019 | MC | 22.05.2019 | MT | 22.05.2019 | PL | 22.05.2019 | RO | 22.05.2019 | SE | 22.05.2019 | SI | 22.05.2019 | SK | 22.05.2019 | TR | 22.05.2019 | BG | 22.08.2019 | GR | 23.08.2019 | GB | 14.09.2019 | IE | 14.09.2019 | LU | 14.09.2019 | IS | 22.09.2019 | PT | 22.09.2019 | CH | 30.09.2019 | LI | 30.09.2019 | [2021/34] |
Former [2021/32] | HU | 14.09.2007 | |
AT | 22.05.2019 | ||
CY | 22.05.2019 | ||
CZ | 22.05.2019 | ||
DK | 22.05.2019 | ||
EE | 22.05.2019 | ||
FI | 22.05.2019 | ||
LT | 22.05.2019 | ||
LV | 22.05.2019 | ||
MC | 22.05.2019 | ||
PL | 22.05.2019 | ||
RO | 22.05.2019 | ||
SE | 22.05.2019 | ||
SI | 22.05.2019 | ||
SK | 22.05.2019 | ||
TR | 22.05.2019 | ||
BG | 22.08.2019 | ||
GR | 23.08.2019 | ||
GB | 14.09.2019 | ||
IE | 14.09.2019 | ||
LU | 14.09.2019 | ||
IS | 22.09.2019 | ||
PT | 22.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
Former [2021/31] | AT | 22.05.2019 | |
CY | 22.05.2019 | ||
CZ | 22.05.2019 | ||
DK | 22.05.2019 | ||
EE | 22.05.2019 | ||
FI | 22.05.2019 | ||
LT | 22.05.2019 | ||
LV | 22.05.2019 | ||
MC | 22.05.2019 | ||
PL | 22.05.2019 | ||
RO | 22.05.2019 | ||
SE | 22.05.2019 | ||
SI | 22.05.2019 | ||
SK | 22.05.2019 | ||
TR | 22.05.2019 | ||
BG | 22.08.2019 | ||
GR | 23.08.2019 | ||
GB | 14.09.2019 | ||
IE | 14.09.2019 | ||
LU | 14.09.2019 | ||
IS | 22.09.2019 | ||
PT | 22.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
Former [2021/26] | AT | 22.05.2019 | |
CY | 22.05.2019 | ||
CZ | 22.05.2019 | ||
DK | 22.05.2019 | ||
EE | 22.05.2019 | ||
FI | 22.05.2019 | ||
LT | 22.05.2019 | ||
LV | 22.05.2019 | ||
MC | 22.05.2019 | ||
PL | 22.05.2019 | ||
RO | 22.05.2019 | ||
SE | 22.05.2019 | ||
SI | 22.05.2019 | ||
SK | 22.05.2019 | ||
TR | 22.05.2019 | ||
BG | 22.08.2019 | ||
GR | 23.08.2019 | ||
GB | 14.09.2019 | ||
IE | 14.09.2019 | ||
LU | 14.09.2019 | ||
PT | 22.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
Former [2020/48] | AT | 22.05.2019 | |
CZ | 22.05.2019 | ||
DK | 22.05.2019 | ||
EE | 22.05.2019 | ||
FI | 22.05.2019 | ||
LT | 22.05.2019 | ||
LV | 22.05.2019 | ||
MC | 22.05.2019 | ||
PL | 22.05.2019 | ||
RO | 22.05.2019 | ||
SE | 22.05.2019 | ||
SI | 22.05.2019 | ||
SK | 22.05.2019 | ||
TR | 22.05.2019 | ||
BG | 22.08.2019 | ||
GR | 23.08.2019 | ||
GB | 14.09.2019 | ||
IE | 14.09.2019 | ||
LU | 14.09.2019 | ||
PT | 22.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
Former [2020/36] | AT | 22.05.2019 | |
CZ | 22.05.2019 | ||
DK | 22.05.2019 | ||
EE | 22.05.2019 | ||
FI | 22.05.2019 | ||
LT | 22.05.2019 | ||
LV | 22.05.2019 | ||
MC | 22.05.2019 | ||
PL | 22.05.2019 | ||
RO | 22.05.2019 | ||
SE | 22.05.2019 | ||
SI | 22.05.2019 | ||
SK | 22.05.2019 | ||
TR | 22.05.2019 | ||
BG | 22.08.2019 | ||
GR | 23.08.2019 | ||
IE | 14.09.2019 | ||
LU | 14.09.2019 | ||
PT | 22.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
Former [2020/35] | AT | 22.05.2019 | |
CZ | 22.05.2019 | ||
DK | 22.05.2019 | ||
EE | 22.05.2019 | ||
FI | 22.05.2019 | ||
LT | 22.05.2019 | ||
LV | 22.05.2019 | ||
MC | 22.05.2019 | ||
PL | 22.05.2019 | ||
RO | 22.05.2019 | ||
SE | 22.05.2019 | ||
SI | 22.05.2019 | ||
SK | 22.05.2019 | ||
TR | 22.05.2019 | ||
BG | 22.08.2019 | ||
GR | 23.08.2019 | ||
LU | 14.09.2019 | ||
PT | 22.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
Former [2020/34] | AT | 22.05.2019 | |
CZ | 22.05.2019 | ||
DK | 22.05.2019 | ||
EE | 22.05.2019 | ||
FI | 22.05.2019 | ||
LT | 22.05.2019 | ||
LV | 22.05.2019 | ||
MC | 22.05.2019 | ||
PL | 22.05.2019 | ||
RO | 22.05.2019 | ||
SE | 22.05.2019 | ||
SI | 22.05.2019 | ||
SK | 22.05.2019 | ||
TR | 22.05.2019 | ||
BG | 22.08.2019 | ||
GR | 23.08.2019 | ||
PT | 22.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
Former [2020/25] | AT | 22.05.2019 | |
CZ | 22.05.2019 | ||
DK | 22.05.2019 | ||
EE | 22.05.2019 | ||
FI | 22.05.2019 | ||
LT | 22.05.2019 | ||
LV | 22.05.2019 | ||
MC | 22.05.2019 | ||
PL | 22.05.2019 | ||
RO | 22.05.2019 | ||
SE | 22.05.2019 | ||
SI | 22.05.2019 | ||
SK | 22.05.2019 | ||
TR | 22.05.2019 | ||
BG | 22.08.2019 | ||
GR | 23.08.2019 | ||
PT | 22.09.2019 | ||
Former [2020/17] | AT | 22.05.2019 | |
CZ | 22.05.2019 | ||
DK | 22.05.2019 | ||
EE | 22.05.2019 | ||
FI | 22.05.2019 | ||
LT | 22.05.2019 | ||
LV | 22.05.2019 | ||
RO | 22.05.2019 | ||
SE | 22.05.2019 | ||
SK | 22.05.2019 | ||
TR | 22.05.2019 | ||
BG | 22.08.2019 | ||
GR | 23.08.2019 | ||
PT | 22.09.2019 | ||
Former [2020/11] | AT | 22.05.2019 | |
CZ | 22.05.2019 | ||
DK | 22.05.2019 | ||
EE | 22.05.2019 | ||
FI | 22.05.2019 | ||
LT | 22.05.2019 | ||
LV | 22.05.2019 | ||
RO | 22.05.2019 | ||
SE | 22.05.2019 | ||
SK | 22.05.2019 | ||
BG | 22.08.2019 | ||
GR | 23.08.2019 | ||
PT | 22.09.2019 | ||
Former [2020/10] | AT | 22.05.2019 | |
CZ | 22.05.2019 | ||
DK | 22.05.2019 | ||
FI | 22.05.2019 | ||
LT | 22.05.2019 | ||
LV | 22.05.2019 | ||
RO | 22.05.2019 | ||
SE | 22.05.2019 | ||
BG | 22.08.2019 | ||
GR | 23.08.2019 | ||
PT | 22.09.2019 | ||
Former [2020/09] | CZ | 22.05.2019 | |
DK | 22.05.2019 | ||
FI | 22.05.2019 | ||
LT | 22.05.2019 | ||
LV | 22.05.2019 | ||
SE | 22.05.2019 | ||
BG | 22.08.2019 | ||
GR | 23.08.2019 | ||
PT | 22.09.2019 | ||
Former [2019/51] | FI | 22.05.2019 | |
LT | 22.05.2019 | ||
LV | 22.05.2019 | ||
SE | 22.05.2019 | ||
BG | 22.08.2019 | ||
GR | 23.08.2019 | ||
PT | 22.09.2019 | ||
Former [2019/48] | FI | 22.05.2019 | |
LT | 22.05.2019 | ||
SE | 22.05.2019 | ||
PT | 22.09.2019 | ||
Former [2019/47] | FI | 22.05.2019 | |
LT | 22.05.2019 | Documents cited: | Search | [XI]US5224358 (YAMANAKA YASUSHI [JP], et al) [X] 1,2,14 * abstract * [I] 3-13; | [I]JP2003014336 (JAPAN CLIMATE SYSTEMS CORP) [I] 1,2,11,14 * abstract *; | [I]FR2747768 (VALEO THERMIQUE MOTEUR SA [FR]) [I] 1,2,11,14 * abstract *; | [I]JP2004069272 (DENSO CORP) [I] 1,2,10,11,14 * abstract *; | [A]US2001004935 (SANADA RYOUICHI [JP], et al) [A] 1-14 * abstract * | International search | [X]US2001004935 (SANADA RYOUICHI [JP], et al); | [Y]US5277032 (SEE HAROLD J [US], et al) | Examination | EP1150076 | CN2606005Y | by applicant | US5224358 |