blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2082599

EP2082599 - SUBBAND ASSIGNMENT IN WIRELESS COMMUNICATIONS SYSTEM [Right-click to bookmark this link]
Former [2009/31]DYNAMIC POWER AMPLIFIER BACKOFF USING HEADROOM INFORMATION
[2015/19]
StatusNo opposition filed within time limit
Status updated on  23.09.2016
Database last updated on 07.10.2024
Most recent event   Tooltip17.08.2018Lapse of the patent in a contracting state
New state(s): BG
published on 19.09.2018  [2018/38]
Applicant(s)For all designated states
Qualcomm Incorporated
Patent Department 5775 Morehouse Drive
San Diego CA 92121 / US
[2009/31]
Inventor(s)01 / GOROKHOV, Alexei
5775 Morehouse Drive
San Diego, CA 92121 / US
02 / BORRAN, Mohammad J.
5775 Morehouse Drive
San Diego, CA 92121 / US
03 / AGRAWAL, Avneesh
5775 Morehouse Drive
San Diego, CA 92121 / US
04 / BHUSHAN, Naga
5775 Morehouse Drive
San Diego, CA 92121 / US
05 / KADOUS, Tamer
5775 Morehouse Drive
San Diego, CA 92121 / US
06 / NAGUIB, Ayman F.
5775 Morehouse Drive
San Diego, CA 92121 / US
 [2009/31]
Representative(s)Howe, Steven
Reddie & Grose LLP The White Chapel Building
10 Whitechapel High Street
London E1 8QS / GB
[N/P]
Former [2015/47]Howe, Steven
Reddie & Grose LLP
16 Theobalds Road
London WC1X 8PL / GB
Former [2009/31]Howe, Steven
Reddie & Grose 16 Theobalds Road London
WC1X 8PL / GB
Application number, filing date07844650.726.10.2007
[2009/31]
WO2007US82740
Priority number, dateUS20060863118P26.10.2006         Original published format: US 863118 P
US2007092376125.10.2007         Original published format: US 923761
[2009/31]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report
No.:WO2008052195
Date:02.05.2008
Language:EN
[2008/18]
Type: A2 Application without search report 
No.:EP2082599
Date:29.07.2009
Language:EN
The application published by WIPO in one of the EPO official languages on 02.05.2008 takes the place of the publication of the European patent application.
[2009/31]
Type: B1 Patent specification 
No.:EP2082599
Date:18.11.2015
Language:EN
[2015/47]
Search report(s)International search report - published on:EP27.11.2008
ClassificationIPC:H04W16/00
[2009/32]
CPC:
H04L5/0007 (EP,BR,KR,US); H04W52/52 (KR); H04W52/30 (US);
H04L5/0037 (EP,BR,US); H04L5/0058 (EP,BR,US); H04W52/04 (EP,BR,US);
H04W52/365 (KR); H04W72/12 (KR); H04W72/563 (EP,BR,US);
Y02B30/00 (US) (-)
Former IPC [2009/31]H04Q7/36
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MT,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2015/47]
Former [2009/31]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MT,  NL,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
TitleGerman:SUBBAND-ZUTEILUNG IN EINEM DRAHTLOSEN KOMMUNIKATIONSSYSTEM[2015/42]
English:SUBBAND ASSIGNMENT IN WIRELESS COMMUNICATIONS SYSTEM[2015/42]
French:ATTRIBUTION DE SOUS-BANDE DANS UN SYSTÈME DE COMMUNICATION SANS FIL[2015/42]
Former [2009/31]DYNAMISCHES BACKOFF FÜR EINEN LEISTUNGSVERSTÄRKER DURCH VERWENDUNG VON BAUHÖHENDATEN
Former [2009/31]DYNAMIC POWER AMPLIFIER BACKOFF USING HEADROOM INFORMATION
Former [2009/31]RÉDUCTION DYNAMIQUE DE LA PUISSANCE D'UN AMPLIFICATEUR UTILISANT DES INFORMATIONS D'ESPACE DE TÊTE
Entry into regional phase21.05.2009National basic fee paid 
21.05.2009Designation fee(s) paid 
21.05.2009Examination fee paid 
Examination procedure21.05.2009Examination requested  [2009/31]
27.08.2009Amendment by applicant (claims and/or description)
08.09.2009Despatch of a communication from the examining division (Time limit: M04)
15.12.2009Reply to a communication from the examining division
28.12.2010Despatch of a communication from the examining division (Time limit: M06)
04.07.2011Reply to a communication from the examining division
27.04.2015Communication of intention to grant the patent
24.08.2015Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
24.08.2015Fee for grant paid
24.08.2015Fee for publishing/printing paid
09.09.2015Information about intention to grant a patent
09.09.2015Receipt of the translation of the claim(s)
Divisional application(s)EP11180457.1  / EP2448336
EP15195036.7   Application refused  : 01.04.2016
The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  08.09.2009
Opposition(s)19.08.2016No opposition filed within time limit [2016/43]
Fees paidRenewal fee
05.08.2009Renewal fee patent year 03
23.09.2010Renewal fee patent year 04
10.10.2011Renewal fee patent year 05
05.10.2012Renewal fee patent year 06
07.10.2013Renewal fee patent year 07
07.10.2014Renewal fee patent year 08
07.10.2015Renewal fee patent year 09
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU26.10.2007
AT18.11.2015
BE18.11.2015
BG18.11.2015
CY18.11.2015
CZ18.11.2015
DK18.11.2015
EE18.11.2015
ES18.11.2015
FI18.11.2015
IT18.11.2015
LT18.11.2015
LV18.11.2015
MC18.11.2015
NL18.11.2015
PL18.11.2015
PT18.11.2015
RO18.11.2015
SE18.11.2015
SI18.11.2015
SK18.11.2015
TR18.11.2015
GR19.02.2016
IS18.03.2016
[2018/38]
Former [2018/32]HU26.10.2007
AT18.11.2015
BE18.11.2015
CY18.11.2015
CZ18.11.2015
DK18.11.2015
EE18.11.2015
ES18.11.2015
FI18.11.2015
IT18.11.2015
LT18.11.2015
LV18.11.2015
MC18.11.2015
NL18.11.2015
PL18.11.2015
PT18.11.2015
RO18.11.2015
SE18.11.2015
SI18.11.2015
SK18.11.2015
TR18.11.2015
GR19.02.2016
IS18.03.2016
Former [2018/29]HU26.10.2007
AT18.11.2015
BE18.11.2015
CY18.11.2015
CZ18.11.2015
DK18.11.2015
EE18.11.2015
ES18.11.2015
FI18.11.2015
IT18.11.2015
LT18.11.2015
LV18.11.2015
MC18.11.2015
NL18.11.2015
PL18.11.2015
RO18.11.2015
SE18.11.2015
SI18.11.2015
SK18.11.2015
TR18.11.2015
GR19.02.2016
IS18.03.2016
Former [2018/28]HU26.10.2007
AT18.11.2015
BE18.11.2015
CY18.11.2015
CZ18.11.2015
DK18.11.2015
EE18.11.2015
ES18.11.2015
FI18.11.2015
IT18.11.2015
LT18.11.2015
LV18.11.2015
MC18.11.2015
NL18.11.2015
PL18.11.2015
RO18.11.2015
SE18.11.2015
SI18.11.2015
SK18.11.2015
GR19.02.2016
IS18.03.2016
Former [2017/03]AT18.11.2015
BE18.11.2015
CZ18.11.2015
DK18.11.2015
EE18.11.2015
ES18.11.2015
FI18.11.2015
IT18.11.2015
LT18.11.2015
LV18.11.2015
NL18.11.2015
PL18.11.2015
RO18.11.2015
SE18.11.2015
SI18.11.2015
SK18.11.2015
GR19.02.2016
IS18.03.2016
Former [2016/49]AT18.11.2015
CZ18.11.2015
DK18.11.2015
EE18.11.2015
ES18.11.2015
FI18.11.2015
IT18.11.2015
LT18.11.2015
LV18.11.2015
NL18.11.2015
PL18.11.2015
RO18.11.2015
SE18.11.2015
SI18.11.2015
SK18.11.2015
GR19.02.2016
IS18.03.2016
Former [2016/39]AT18.11.2015
CZ18.11.2015
DK18.11.2015
EE18.11.2015
ES18.11.2015
FI18.11.2015
IT18.11.2015
LT18.11.2015
LV18.11.2015
NL18.11.2015
PL18.11.2015
RO18.11.2015
SE18.11.2015
SK18.11.2015
GR19.02.2016
IS18.03.2016
Former [2016/36]AT18.11.2015
CZ18.11.2015
EE18.11.2015
ES18.11.2015
FI18.11.2015
IT18.11.2015
LT18.11.2015
LV18.11.2015
NL18.11.2015
PL18.11.2015
RO18.11.2015
SE18.11.2015
SK18.11.2015
GR19.02.2016
IS18.03.2016
Former [2016/34]AT18.11.2015
CZ18.11.2015
ES18.11.2015
FI18.11.2015
IT18.11.2015
LT18.11.2015
LV18.11.2015
NL18.11.2015
PL18.11.2015
SE18.11.2015
GR19.02.2016
IS18.03.2016
Former [2016/25]AT18.11.2015
ES18.11.2015
FI18.11.2015
IT18.11.2015
LT18.11.2015
LV18.11.2015
NL18.11.2015
PL18.11.2015
SE18.11.2015
GR19.02.2016
IS18.03.2016
Former [2016/24]AT18.11.2015
ES18.11.2015
FI18.11.2015
IT18.11.2015
LT18.11.2015
NL18.11.2015
PL18.11.2015
SE18.11.2015
GR19.02.2016
IS18.03.2016
Former [2016/23]ES18.11.2015
IT18.11.2015
LT18.11.2015
NL18.11.2015
SE18.11.2015
IS18.03.2016
Former [2016/22]ES18.11.2015
IT18.11.2015
LT18.11.2015
NL18.11.2015
IS18.03.2016
Former [2016/21]ES18.11.2015
IT18.11.2015
LT18.11.2015
Former [2016/20]ES18.11.2015
LT18.11.2015
Cited inInternational search[A]US2005111488  (SUBRAMANIAN VIJAY G [US], et al);
 [XA]US2005272432  (JI TINGFANG [US], et al);
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.