blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2140046

EP2140046 - PROCESS FOR PRODUCING POLY-CRYSTALLINE OR MULTI-CRYSTALLINE SILICON [Right-click to bookmark this link]
Former [2010/01]DEVICE AND PROCESS FOR PRODUCING POLY-CRYSTALLINE OR MULTI-CRYSTALLINE SILICON; INGO AS WELL AS WAFER OF POLY-CRYSTALLINE OR MULTI-CRYSTALLINE...
[2017/03]
StatusNo opposition filed within time limit
Status updated on  27.04.2018
Database last updated on 11.05.2024
FormerThe patent has been granted
Status updated on  19.05.2017
FormerGrant of patent is intended
Status updated on  08.01.2017
Most recent event   Tooltip29.05.2020Lapse of the patent in a contracting state
New state(s): PT
published on 01.07.2020  [2020/27]
Applicant(s)For all designated states
Freiberger Compound Materials GmbH
Am Junger Löwe Schacht 5
09599 Freiberg / DE
[2010/01]
Inventor(s)01 / WEINERT, Berndt
Turnerstrasse 9
09599 Freiberg / DE
02 / JURISCH, Manfred
M.-A.-Nexö-Strasse 4
01217 Dresden / DE
03 / EICHLER, Stefan
Hohe Strasse 133
01187 Dresden / DE
 [2010/01]
Representative(s)Prüfer & Partner mbB Patentanwälte · Rechtsanwälte
Sohnckestraße 12
81479 München / DE
[2017/25]
Former [2010/01]Prüfer & Partner GbR European Patent Attorneys
Sohnckestrasse 12
81479 München / DE
Application number, filing date07857085.021.12.2007
[2010/01]
WO2007EP11378
Priority number, dateDE2007102000627.04.2007         Original published format: DE102007020006
[2010/01]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2008131794
Date:06.11.2008
Language:EN
[2008/45]
Type: A1 Application with search report 
No.:EP2140046
Date:06.01.2010
Language:EN
The application published by WIPO in one of the EPO official languages on 06.11.2008 takes the place of the publication of the European patent application.
[2010/01]
Type: B1 Patent specification 
No.:EP2140046
Date:21.06.2017
Language:EN
[2017/25]
Search report(s)International search report - published on:EP06.11.2008
ClassificationIPC:C30B11/00, C30B11/06, C30B29/06, H01L31/18
[2017/03]
CPC:
C30B29/06 (EP,US); C30B11/00 (US); C30B11/002 (EP,US);
C30B11/003 (EP,US); C30B11/006 (EP,US); C30B11/06 (EP,US);
H01L31/182 (EP,US); Y02E10/546 (EP,US); Y02P70/50 (EP,US) (-)
Former IPC [2010/01]C30B29/06, C30B11/00, H01L31/00
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MT,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2017/25]
Former [2010/01]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MT,  NL,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
TitleGerman:VERFAHREN ZUR HERSTELLUNG VON POLY- ODER MULTIKRISTALLINEM SILIZIUM[2017/03]
English:PROCESS FOR PRODUCING POLY-CRYSTALLINE OR MULTI-CRYSTALLINE SILICON[2017/03]
French:PROCÉDÉ DESTINÉ À PRODUIRE DU SILICIUM POLYCRISTALLIN OU MULTICRISTALLIN[2017/03]
Former [2010/01]VORRICHTUNG UND VERFAHREN ZUR HERSTELLUNG VON POLY- ODER MULTIKRISTALLINEM SILIZIUM, DADURCH HERGESTELLTER MASSEBLOCK (INGOT) SOWIE WAFER AUS POLY- ODER MULTIKRISTALLINEM SILIZIUM, UND VERWENDUNG ZUR HERSTELLUNG VON SOLARZELLEN
Former [2010/01]DEVICE AND PROCESS FOR PRODUCING POLY-CRYSTALLINE OR MULTI-CRYSTALLINE SILICON; INGO AS WELL AS WAFER OF POLY-CRYSTALLINE OR MULTI-CRYSTALLINE...
Former [2010/01]DISPOSITIF ET PROCÉDÉ DESTINÉS À PRODUIRE DU SILICIUM POLYCRISTALLIN OU MULTICRISTALLIN; LINGOT ET TRANCHE DE SILICIUM POLYCRISTALLIN OU MULTICRISTALLIN
Entry into regional phase14.10.2009National basic fee paid 
14.10.2009Designation fee(s) paid 
14.10.2009Examination fee paid 
Examination procedure14.10.2009Amendment by applicant (claims and/or description)
14.10.2009Examination requested  [2010/01]
13.12.2010Despatch of a communication from the examining division (Time limit: M06)
15.06.2011Reply to a communication from the examining division
29.07.2014Despatch of a communication from the examining division (Time limit: M02)
17.09.2014Reply to a communication from the examining division
15.07.2015Despatch of a communication from the examining division (Time limit: M04)
17.11.2015Reply to a communication from the examining division
15.02.2016Despatch of a communication from the examining division (Time limit: M04)
10.06.2016Reply to a communication from the examining division
07.12.2016Date of oral proceedings
03.01.2017Minutes of oral proceedings despatched
09.01.2017Communication of intention to grant the patent
03.05.2017Fee for grant paid
03.05.2017Fee for publishing/printing paid
03.05.2017Receipt of the translation of the claim(s)
Divisional application(s)EP17151493.8  / EP3176290
The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  13.12.2010
Opposition(s)22.03.2018No opposition filed within time limit [2018/22]
Fees paidRenewal fee
14.10.2009Renewal fee patent year 03
29.12.2010Renewal fee patent year 04
30.12.2011Renewal fee patent year 05
28.12.2012Renewal fee patent year 06
30.12.2013Renewal fee patent year 07
30.12.2014Renewal fee patent year 08
29.12.2015Renewal fee patent year 09
28.12.2016Renewal fee patent year 10
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU21.12.2007
AT21.06.2017
CY21.06.2017
CZ21.06.2017
DK21.06.2017
EE21.06.2017
ES21.06.2017
FI21.06.2017
IT21.06.2017
LT21.06.2017
LV21.06.2017
MC21.06.2017
NL21.06.2017
PL21.06.2017
PT21.06.2017
RO21.06.2017
SE21.06.2017
SI21.06.2017
SK21.06.2017
TR21.06.2017
BG21.09.2017
GR22.09.2017
IS21.10.2017
IE21.12.2017
LU21.12.2017
MT21.12.2017
BE31.12.2017
CH31.12.2017
LI31.12.2017
[2020/27]
Former [2020/15]HU21.12.2007
AT21.06.2017
CY21.06.2017
CZ21.06.2017
DK21.06.2017
EE21.06.2017
ES21.06.2017
FI21.06.2017
IT21.06.2017
LT21.06.2017
LV21.06.2017
MC21.06.2017
NL21.06.2017
PL21.06.2017
RO21.06.2017
SE21.06.2017
SI21.06.2017
SK21.06.2017
TR21.06.2017
BG21.09.2017
GR22.09.2017
IS21.10.2017
IE21.12.2017
LU21.12.2017
MT21.12.2017
BE31.12.2017
CH31.12.2017
LI31.12.2017
Former [2019/46]HU21.12.2007
AT21.06.2017
CY21.06.2017
CZ21.06.2017
DK21.06.2017
EE21.06.2017
ES21.06.2017
FI21.06.2017
IT21.06.2017
LT21.06.2017
LV21.06.2017
MC21.06.2017
NL21.06.2017
PL21.06.2017
RO21.06.2017
SE21.06.2017
SI21.06.2017
SK21.06.2017
BG21.09.2017
GR22.09.2017
IS21.10.2017
IE21.12.2017
LU21.12.2017
MT21.12.2017
BE31.12.2017
CH31.12.2017
LI31.12.2017
Former [2019/31]HU21.12.2007
AT21.06.2017
CZ21.06.2017
DK21.06.2017
EE21.06.2017
ES21.06.2017
FI21.06.2017
IT21.06.2017
LT21.06.2017
LV21.06.2017
MC21.06.2017
NL21.06.2017
PL21.06.2017
RO21.06.2017
SE21.06.2017
SI21.06.2017
SK21.06.2017
BG21.09.2017
GR22.09.2017
IS21.10.2017
IE21.12.2017
LU21.12.2017
MT21.12.2017
BE31.12.2017
CH31.12.2017
LI31.12.2017
Former [2019/30]AT21.06.2017
CZ21.06.2017
DK21.06.2017
EE21.06.2017
ES21.06.2017
FI21.06.2017
IT21.06.2017
LT21.06.2017
LV21.06.2017
MC21.06.2017
NL21.06.2017
PL21.06.2017
RO21.06.2017
SE21.06.2017
SI21.06.2017
SK21.06.2017
BG21.09.2017
GR22.09.2017
IS21.10.2017
IE21.12.2017
LU21.12.2017
MT21.12.2017
BE31.12.2017
CH31.12.2017
LI31.12.2017
Former [2018/52]AT21.06.2017
CZ21.06.2017
DK21.06.2017
EE21.06.2017
ES21.06.2017
FI21.06.2017
IT21.06.2017
LT21.06.2017
LV21.06.2017
NL21.06.2017
PL21.06.2017
RO21.06.2017
SE21.06.2017
SI21.06.2017
SK21.06.2017
BG21.09.2017
GR22.09.2017
IS21.10.2017
IE21.12.2017
LU21.12.2017
MT21.12.2017
BE31.12.2017
CH31.12.2017
LI31.12.2017
Former [2018/50]AT21.06.2017
CZ21.06.2017
DK21.06.2017
EE21.06.2017
ES21.06.2017
FI21.06.2017
IT21.06.2017
LT21.06.2017
LV21.06.2017
NL21.06.2017
PL21.06.2017
RO21.06.2017
SE21.06.2017
SI21.06.2017
SK21.06.2017
BG21.09.2017
GR22.09.2017
IS21.10.2017
IE21.12.2017
LU21.12.2017
MT21.12.2017
BE31.12.2017
Former [2018/45]AT21.06.2017
CZ21.06.2017
DK21.06.2017
EE21.06.2017
ES21.06.2017
FI21.06.2017
IT21.06.2017
LT21.06.2017
LV21.06.2017
NL21.06.2017
PL21.06.2017
RO21.06.2017
SE21.06.2017
SI21.06.2017
SK21.06.2017
BG21.09.2017
GR22.09.2017
IS21.10.2017
IE21.12.2017
LU21.12.2017
MT21.12.2017
Former [2018/43]AT21.06.2017
CZ21.06.2017
DK21.06.2017
EE21.06.2017
ES21.06.2017
FI21.06.2017
IT21.06.2017
LT21.06.2017
LV21.06.2017
NL21.06.2017
PL21.06.2017
RO21.06.2017
SE21.06.2017
SI21.06.2017
SK21.06.2017
BG21.09.2017
GR22.09.2017
IS21.10.2017
LU21.12.2017
MT21.12.2017
Former [2018/39]AT21.06.2017
CZ21.06.2017
DK21.06.2017
EE21.06.2017
ES21.06.2017
FI21.06.2017
IT21.06.2017
LT21.06.2017
LV21.06.2017
NL21.06.2017
PL21.06.2017
RO21.06.2017
SE21.06.2017
SI21.06.2017
SK21.06.2017
BG21.09.2017
GR22.09.2017
IS21.10.2017
Former [2018/21]AT21.06.2017
CZ21.06.2017
DK21.06.2017
EE21.06.2017
ES21.06.2017
FI21.06.2017
IT21.06.2017
LT21.06.2017
LV21.06.2017
NL21.06.2017
PL21.06.2017
RO21.06.2017
SE21.06.2017
SK21.06.2017
BG21.09.2017
GR22.09.2017
IS21.10.2017
Former [2018/11]AT21.06.2017
CZ21.06.2017
EE21.06.2017
ES21.06.2017
FI21.06.2017
IT21.06.2017
LT21.06.2017
LV21.06.2017
NL21.06.2017
PL21.06.2017
RO21.06.2017
SE21.06.2017
SK21.06.2017
BG21.09.2017
GR22.09.2017
IS21.10.2017
Former [2018/10]AT21.06.2017
CZ21.06.2017
EE21.06.2017
FI21.06.2017
LT21.06.2017
LV21.06.2017
NL21.06.2017
RO21.06.2017
SE21.06.2017
SK21.06.2017
BG21.09.2017
GR22.09.2017
Former [2018/09]EE21.06.2017
FI21.06.2017
LT21.06.2017
LV21.06.2017
NL21.06.2017
SE21.06.2017
BG21.09.2017
GR22.09.2017
Former [2017/52]FI21.06.2017
LT21.06.2017
LV21.06.2017
NL21.06.2017
SE21.06.2017
BG21.09.2017
GR22.09.2017
Former [2017/50]FI21.06.2017
LT21.06.2017
LV21.06.2017
SE21.06.2017
BG21.09.2017
GR22.09.2017
Former [2017/49]FI21.06.2017
LT21.06.2017
GR22.09.2017
Cited inInternational search[AD]DE19810019  (BAYER AG [DE]);
 [XA]EP0939146  (MITSUBISHI MATERIALS CORP [JP]) [X] 17-22,29,30 * paragraphs [0010] - [0017]; figures 3,4 * [A] 1-16;
 [AD]US2002078992  (WODITSCH PETER [DE], et al);
 [XA]US2002139297  (WAKITA SABURO [JP], et al) [X] 17-22,29,30 * paragraph [0028]; figure 1 * [A] 1-16,23-28;
 [A]WO2006093099  (KYOCERA CORP [JP], et al) [A] 22-30 * abstract *;
 [A]WO2006104107  (KYOCERA CORP [JP], et al) [A] 22-30 * abstract *;
 [PXDA]DE102006017622  (SCHOTT AG [DE]) [PXD] 17-19,22,29,30 * paragraph [0038]; figure 1 * [PA] 1-16;
 [X]  - HELMREICH ET AL., "Progress in ingot and foil casting of silicon", J.CRYSTAL GROWTH, The Netherlands, (1986), vol. 79, no. 1-3, pages 562 - 571, XP002475314 [X] 1,4 * page 562, column 2, line 29 - page 563, column 1, line 11 *

DOI:   http://dx.doi.org/10.1016/0022-0248(86)90521-X
 [A]  - RAVISHANKAR P S, "LIQUID ENCAPSULATED BRIDGMAN (LEB) METHOD FOR DIRECTIONAL SOLIDIFICATION OF SILICON USING CALCIUM CHLORIDE", JOURNAL OF CRYSTAL GROWTH, ELSEVIER, AMSTERDAM, NL, (198901), vol. 94, no. 1, ISSN 0022-0248, pages 62 - 68, XP000002403 [A] 1-15 * page 63, column 1, line 3 - line 8 *

DOI:   http://dx.doi.org/10.1016/0022-0248(89)90603-9
ExaminationUS6368403
 US2002112658
 US2009266396
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.