EP2140046 - PROCESS FOR PRODUCING POLY-CRYSTALLINE OR MULTI-CRYSTALLINE SILICON [Right-click to bookmark this link] | |||
Former [2010/01] | DEVICE AND PROCESS FOR PRODUCING POLY-CRYSTALLINE OR MULTI-CRYSTALLINE SILICON; INGO AS WELL AS WAFER OF POLY-CRYSTALLINE OR MULTI-CRYSTALLINE... | ||
[2017/03] | Status | No opposition filed within time limit Status updated on 27.04.2018 Database last updated on 11.05.2024 | |
Former | The patent has been granted Status updated on 19.05.2017 | ||
Former | Grant of patent is intended Status updated on 08.01.2017 | Most recent event Tooltip | 29.05.2020 | Lapse of the patent in a contracting state New state(s): PT | published on 01.07.2020 [2020/27] | Applicant(s) | For all designated states Freiberger Compound Materials GmbH Am Junger Löwe Schacht 5 09599 Freiberg / DE | [2010/01] | Inventor(s) | 01 /
WEINERT, Berndt Turnerstrasse 9 09599 Freiberg / DE | 02 /
JURISCH, Manfred M.-A.-Nexö-Strasse 4 01217 Dresden / DE | 03 /
EICHLER, Stefan Hohe Strasse 133 01187 Dresden / DE | [2010/01] | Representative(s) | Prüfer & Partner mbB Patentanwälte · Rechtsanwälte Sohnckestraße 12 81479 München / DE | [2017/25] |
Former [2010/01] | Prüfer & Partner GbR European Patent Attorneys Sohnckestrasse 12 81479 München / DE | Application number, filing date | 07857085.0 | 21.12.2007 | [2010/01] | WO2007EP11378 | Priority number, date | DE20071020006 | 27.04.2007 Original published format: DE102007020006 | [2010/01] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2008131794 | Date: | 06.11.2008 | Language: | EN | [2008/45] | Type: | A1 Application with search report | No.: | EP2140046 | Date: | 06.01.2010 | Language: | EN | The application published by WIPO in one of the EPO official languages on 06.11.2008 takes the place of the publication of the European patent application. | [2010/01] | Type: | B1 Patent specification | No.: | EP2140046 | Date: | 21.06.2017 | Language: | EN | [2017/25] | Search report(s) | International search report - published on: | EP | 06.11.2008 | Classification | IPC: | C30B11/00, C30B11/06, C30B29/06, H01L31/18 | [2017/03] | CPC: |
C30B29/06 (EP,US);
C30B11/00 (US);
C30B11/002 (EP,US);
C30B11/003 (EP,US);
C30B11/006 (EP,US);
C30B11/06 (EP,US);
|
Former IPC [2010/01] | C30B29/06, C30B11/00, H01L31/00 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, PL, PT, RO, SE, SI, SK, TR [2017/25] |
Former [2010/01] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, PL, PT, RO, SE, SI, SK, TR | Title | German: | VERFAHREN ZUR HERSTELLUNG VON POLY- ODER MULTIKRISTALLINEM SILIZIUM | [2017/03] | English: | PROCESS FOR PRODUCING POLY-CRYSTALLINE OR MULTI-CRYSTALLINE SILICON | [2017/03] | French: | PROCÉDÉ DESTINÉ À PRODUIRE DU SILICIUM POLYCRISTALLIN OU MULTICRISTALLIN | [2017/03] |
Former [2010/01] | VORRICHTUNG UND VERFAHREN ZUR HERSTELLUNG VON POLY- ODER MULTIKRISTALLINEM SILIZIUM, DADURCH HERGESTELLTER MASSEBLOCK (INGOT) SOWIE WAFER AUS POLY- ODER MULTIKRISTALLINEM SILIZIUM, UND VERWENDUNG ZUR HERSTELLUNG VON SOLARZELLEN | ||
Former [2010/01] | DEVICE AND PROCESS FOR PRODUCING POLY-CRYSTALLINE OR MULTI-CRYSTALLINE SILICON; INGO AS WELL AS WAFER OF POLY-CRYSTALLINE OR MULTI-CRYSTALLINE... | ||
Former [2010/01] | DISPOSITIF ET PROCÉDÉ DESTINÉS À PRODUIRE DU SILICIUM POLYCRISTALLIN OU MULTICRISTALLIN; LINGOT ET TRANCHE DE SILICIUM POLYCRISTALLIN OU MULTICRISTALLIN | Entry into regional phase | 14.10.2009 | National basic fee paid | 14.10.2009 | Designation fee(s) paid | 14.10.2009 | Examination fee paid | Examination procedure | 14.10.2009 | Amendment by applicant (claims and/or description) | 14.10.2009 | Examination requested [2010/01] | 13.12.2010 | Despatch of a communication from the examining division (Time limit: M06) | 15.06.2011 | Reply to a communication from the examining division | 29.07.2014 | Despatch of a communication from the examining division (Time limit: M02) | 17.09.2014 | Reply to a communication from the examining division | 15.07.2015 | Despatch of a communication from the examining division (Time limit: M04) | 17.11.2015 | Reply to a communication from the examining division | 15.02.2016 | Despatch of a communication from the examining division (Time limit: M04) | 10.06.2016 | Reply to a communication from the examining division | 07.12.2016 | Date of oral proceedings | 03.01.2017 | Minutes of oral proceedings despatched | 09.01.2017 | Communication of intention to grant the patent | 03.05.2017 | Fee for grant paid | 03.05.2017 | Fee for publishing/printing paid | 03.05.2017 | Receipt of the translation of the claim(s) | Divisional application(s) | EP17151493.8 / EP3176290 | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 13.12.2010 | Opposition(s) | 22.03.2018 | No opposition filed within time limit [2018/22] | Fees paid | Renewal fee | 14.10.2009 | Renewal fee patent year 03 | 29.12.2010 | Renewal fee patent year 04 | 30.12.2011 | Renewal fee patent year 05 | 28.12.2012 | Renewal fee patent year 06 | 30.12.2013 | Renewal fee patent year 07 | 30.12.2014 | Renewal fee patent year 08 | 29.12.2015 | Renewal fee patent year 09 | 28.12.2016 | Renewal fee patent year 10 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.12.2007 | AT | 21.06.2017 | CY | 21.06.2017 | CZ | 21.06.2017 | DK | 21.06.2017 | EE | 21.06.2017 | ES | 21.06.2017 | FI | 21.06.2017 | IT | 21.06.2017 | LT | 21.06.2017 | LV | 21.06.2017 | MC | 21.06.2017 | NL | 21.06.2017 | PL | 21.06.2017 | PT | 21.06.2017 | RO | 21.06.2017 | SE | 21.06.2017 | SI | 21.06.2017 | SK | 21.06.2017 | TR | 21.06.2017 | BG | 21.09.2017 | GR | 22.09.2017 | IS | 21.10.2017 | IE | 21.12.2017 | LU | 21.12.2017 | MT | 21.12.2017 | BE | 31.12.2017 | CH | 31.12.2017 | LI | 31.12.2017 | [2020/27] |
Former [2020/15] | HU | 21.12.2007 | |
AT | 21.06.2017 | ||
CY | 21.06.2017 | ||
CZ | 21.06.2017 | ||
DK | 21.06.2017 | ||
EE | 21.06.2017 | ||
ES | 21.06.2017 | ||
FI | 21.06.2017 | ||
IT | 21.06.2017 | ||
LT | 21.06.2017 | ||
LV | 21.06.2017 | ||
MC | 21.06.2017 | ||
NL | 21.06.2017 | ||
PL | 21.06.2017 | ||
RO | 21.06.2017 | ||
SE | 21.06.2017 | ||
SI | 21.06.2017 | ||
SK | 21.06.2017 | ||
TR | 21.06.2017 | ||
BG | 21.09.2017 | ||
GR | 22.09.2017 | ||
IS | 21.10.2017 | ||
IE | 21.12.2017 | ||
LU | 21.12.2017 | ||
MT | 21.12.2017 | ||
BE | 31.12.2017 | ||
CH | 31.12.2017 | ||
LI | 31.12.2017 | ||
Former [2019/46] | HU | 21.12.2007 | |
AT | 21.06.2017 | ||
CY | 21.06.2017 | ||
CZ | 21.06.2017 | ||
DK | 21.06.2017 | ||
EE | 21.06.2017 | ||
ES | 21.06.2017 | ||
FI | 21.06.2017 | ||
IT | 21.06.2017 | ||
LT | 21.06.2017 | ||
LV | 21.06.2017 | ||
MC | 21.06.2017 | ||
NL | 21.06.2017 | ||
PL | 21.06.2017 | ||
RO | 21.06.2017 | ||
SE | 21.06.2017 | ||
SI | 21.06.2017 | ||
SK | 21.06.2017 | ||
BG | 21.09.2017 | ||
GR | 22.09.2017 | ||
IS | 21.10.2017 | ||
IE | 21.12.2017 | ||
LU | 21.12.2017 | ||
MT | 21.12.2017 | ||
BE | 31.12.2017 | ||
CH | 31.12.2017 | ||
LI | 31.12.2017 | ||
Former [2019/31] | HU | 21.12.2007 | |
AT | 21.06.2017 | ||
CZ | 21.06.2017 | ||
DK | 21.06.2017 | ||
EE | 21.06.2017 | ||
ES | 21.06.2017 | ||
FI | 21.06.2017 | ||
IT | 21.06.2017 | ||
LT | 21.06.2017 | ||
LV | 21.06.2017 | ||
MC | 21.06.2017 | ||
NL | 21.06.2017 | ||
PL | 21.06.2017 | ||
RO | 21.06.2017 | ||
SE | 21.06.2017 | ||
SI | 21.06.2017 | ||
SK | 21.06.2017 | ||
BG | 21.09.2017 | ||
GR | 22.09.2017 | ||
IS | 21.10.2017 | ||
IE | 21.12.2017 | ||
LU | 21.12.2017 | ||
MT | 21.12.2017 | ||
BE | 31.12.2017 | ||
CH | 31.12.2017 | ||
LI | 31.12.2017 | ||
Former [2019/30] | AT | 21.06.2017 | |
CZ | 21.06.2017 | ||
DK | 21.06.2017 | ||
EE | 21.06.2017 | ||
ES | 21.06.2017 | ||
FI | 21.06.2017 | ||
IT | 21.06.2017 | ||
LT | 21.06.2017 | ||
LV | 21.06.2017 | ||
MC | 21.06.2017 | ||
NL | 21.06.2017 | ||
PL | 21.06.2017 | ||
RO | 21.06.2017 | ||
SE | 21.06.2017 | ||
SI | 21.06.2017 | ||
SK | 21.06.2017 | ||
BG | 21.09.2017 | ||
GR | 22.09.2017 | ||
IS | 21.10.2017 | ||
IE | 21.12.2017 | ||
LU | 21.12.2017 | ||
MT | 21.12.2017 | ||
BE | 31.12.2017 | ||
CH | 31.12.2017 | ||
LI | 31.12.2017 | ||
Former [2018/52] | AT | 21.06.2017 | |
CZ | 21.06.2017 | ||
DK | 21.06.2017 | ||
EE | 21.06.2017 | ||
ES | 21.06.2017 | ||
FI | 21.06.2017 | ||
IT | 21.06.2017 | ||
LT | 21.06.2017 | ||
LV | 21.06.2017 | ||
NL | 21.06.2017 | ||
PL | 21.06.2017 | ||
RO | 21.06.2017 | ||
SE | 21.06.2017 | ||
SI | 21.06.2017 | ||
SK | 21.06.2017 | ||
BG | 21.09.2017 | ||
GR | 22.09.2017 | ||
IS | 21.10.2017 | ||
IE | 21.12.2017 | ||
LU | 21.12.2017 | ||
MT | 21.12.2017 | ||
BE | 31.12.2017 | ||
CH | 31.12.2017 | ||
LI | 31.12.2017 | ||
Former [2018/50] | AT | 21.06.2017 | |
CZ | 21.06.2017 | ||
DK | 21.06.2017 | ||
EE | 21.06.2017 | ||
ES | 21.06.2017 | ||
FI | 21.06.2017 | ||
IT | 21.06.2017 | ||
LT | 21.06.2017 | ||
LV | 21.06.2017 | ||
NL | 21.06.2017 | ||
PL | 21.06.2017 | ||
RO | 21.06.2017 | ||
SE | 21.06.2017 | ||
SI | 21.06.2017 | ||
SK | 21.06.2017 | ||
BG | 21.09.2017 | ||
GR | 22.09.2017 | ||
IS | 21.10.2017 | ||
IE | 21.12.2017 | ||
LU | 21.12.2017 | ||
MT | 21.12.2017 | ||
BE | 31.12.2017 | ||
Former [2018/45] | AT | 21.06.2017 | |
CZ | 21.06.2017 | ||
DK | 21.06.2017 | ||
EE | 21.06.2017 | ||
ES | 21.06.2017 | ||
FI | 21.06.2017 | ||
IT | 21.06.2017 | ||
LT | 21.06.2017 | ||
LV | 21.06.2017 | ||
NL | 21.06.2017 | ||
PL | 21.06.2017 | ||
RO | 21.06.2017 | ||
SE | 21.06.2017 | ||
SI | 21.06.2017 | ||
SK | 21.06.2017 | ||
BG | 21.09.2017 | ||
GR | 22.09.2017 | ||
IS | 21.10.2017 | ||
IE | 21.12.2017 | ||
LU | 21.12.2017 | ||
MT | 21.12.2017 | ||
Former [2018/43] | AT | 21.06.2017 | |
CZ | 21.06.2017 | ||
DK | 21.06.2017 | ||
EE | 21.06.2017 | ||
ES | 21.06.2017 | ||
FI | 21.06.2017 | ||
IT | 21.06.2017 | ||
LT | 21.06.2017 | ||
LV | 21.06.2017 | ||
NL | 21.06.2017 | ||
PL | 21.06.2017 | ||
RO | 21.06.2017 | ||
SE | 21.06.2017 | ||
SI | 21.06.2017 | ||
SK | 21.06.2017 | ||
BG | 21.09.2017 | ||
GR | 22.09.2017 | ||
IS | 21.10.2017 | ||
LU | 21.12.2017 | ||
MT | 21.12.2017 | ||
Former [2018/39] | AT | 21.06.2017 | |
CZ | 21.06.2017 | ||
DK | 21.06.2017 | ||
EE | 21.06.2017 | ||
ES | 21.06.2017 | ||
FI | 21.06.2017 | ||
IT | 21.06.2017 | ||
LT | 21.06.2017 | ||
LV | 21.06.2017 | ||
NL | 21.06.2017 | ||
PL | 21.06.2017 | ||
RO | 21.06.2017 | ||
SE | 21.06.2017 | ||
SI | 21.06.2017 | ||
SK | 21.06.2017 | ||
BG | 21.09.2017 | ||
GR | 22.09.2017 | ||
IS | 21.10.2017 | ||
Former [2018/21] | AT | 21.06.2017 | |
CZ | 21.06.2017 | ||
DK | 21.06.2017 | ||
EE | 21.06.2017 | ||
ES | 21.06.2017 | ||
FI | 21.06.2017 | ||
IT | 21.06.2017 | ||
LT | 21.06.2017 | ||
LV | 21.06.2017 | ||
NL | 21.06.2017 | ||
PL | 21.06.2017 | ||
RO | 21.06.2017 | ||
SE | 21.06.2017 | ||
SK | 21.06.2017 | ||
BG | 21.09.2017 | ||
GR | 22.09.2017 | ||
IS | 21.10.2017 | ||
Former [2018/11] | AT | 21.06.2017 | |
CZ | 21.06.2017 | ||
EE | 21.06.2017 | ||
ES | 21.06.2017 | ||
FI | 21.06.2017 | ||
IT | 21.06.2017 | ||
LT | 21.06.2017 | ||
LV | 21.06.2017 | ||
NL | 21.06.2017 | ||
PL | 21.06.2017 | ||
RO | 21.06.2017 | ||
SE | 21.06.2017 | ||
SK | 21.06.2017 | ||
BG | 21.09.2017 | ||
GR | 22.09.2017 | ||
IS | 21.10.2017 | ||
Former [2018/10] | AT | 21.06.2017 | |
CZ | 21.06.2017 | ||
EE | 21.06.2017 | ||
FI | 21.06.2017 | ||
LT | 21.06.2017 | ||
LV | 21.06.2017 | ||
NL | 21.06.2017 | ||
RO | 21.06.2017 | ||
SE | 21.06.2017 | ||
SK | 21.06.2017 | ||
BG | 21.09.2017 | ||
GR | 22.09.2017 | ||
Former [2018/09] | EE | 21.06.2017 | |
FI | 21.06.2017 | ||
LT | 21.06.2017 | ||
LV | 21.06.2017 | ||
NL | 21.06.2017 | ||
SE | 21.06.2017 | ||
BG | 21.09.2017 | ||
GR | 22.09.2017 | ||
Former [2017/52] | FI | 21.06.2017 | |
LT | 21.06.2017 | ||
LV | 21.06.2017 | ||
NL | 21.06.2017 | ||
SE | 21.06.2017 | ||
BG | 21.09.2017 | ||
GR | 22.09.2017 | ||
Former [2017/50] | FI | 21.06.2017 | |
LT | 21.06.2017 | ||
LV | 21.06.2017 | ||
SE | 21.06.2017 | ||
BG | 21.09.2017 | ||
GR | 22.09.2017 | ||
Former [2017/49] | FI | 21.06.2017 | |
LT | 21.06.2017 | ||
GR | 22.09.2017 | Cited in | International search | [AD]DE19810019 (BAYER AG [DE]); | [XA]EP0939146 (MITSUBISHI MATERIALS CORP [JP]) [X] 17-22,29,30 * paragraphs [0010] - [0017]; figures 3,4 * [A] 1-16; | [AD]US2002078992 (WODITSCH PETER [DE], et al); | [XA]US2002139297 (WAKITA SABURO [JP], et al) [X] 17-22,29,30 * paragraph [0028]; figure 1 * [A] 1-16,23-28; | [A]WO2006093099 (KYOCERA CORP [JP], et al) [A] 22-30 * abstract *; | [A]WO2006104107 (KYOCERA CORP [JP], et al) [A] 22-30 * abstract *; | [PXDA]DE102006017622 (SCHOTT AG [DE]) [PXD] 17-19,22,29,30 * paragraph [0038]; figure 1 * [PA] 1-16; | [X] - HELMREICH ET AL., "Progress in ingot and foil casting of silicon", J.CRYSTAL GROWTH, The Netherlands, (1986), vol. 79, no. 1-3, pages 562 - 571, XP002475314 [X] 1,4 * page 562, column 2, line 29 - page 563, column 1, line 11 * DOI: http://dx.doi.org/10.1016/0022-0248(86)90521-X | [A] - RAVISHANKAR P S, "LIQUID ENCAPSULATED BRIDGMAN (LEB) METHOD FOR DIRECTIONAL SOLIDIFICATION OF SILICON USING CALCIUM CHLORIDE", JOURNAL OF CRYSTAL GROWTH, ELSEVIER, AMSTERDAM, NL, (198901), vol. 94, no. 1, ISSN 0022-0248, pages 62 - 68, XP000002403 [A] 1-15 * page 63, column 1, line 3 - line 8 * DOI: http://dx.doi.org/10.1016/0022-0248(89)90603-9 | Examination | US6368403 | US2002112658 | US2009266396 |