EP2043400 - METHOD AND APPARATUSES FOR CHANGING THE PHASE OF A PERIODIC SCAN [Right-click to bookmark this link] | |||
Former [2009/14] | Randomization of periodic channel scans background | ||
[2009/26] | Status | No opposition filed within time limit Status updated on 21.06.2019 Database last updated on 28.05.2024 | |
Former | The patent has been granted Status updated on 13.07.2018 | ||
Former | Grant of patent is intended Status updated on 06.04.2018 | ||
Former | Examination is in progress Status updated on 13.03.2018 | ||
Former | Grant of patent is intended Status updated on 07.12.2017 | ||
Former | Examination is in progress Status updated on 23.12.2016 | Most recent event Tooltip | 09.07.2021 | Lapse of the patent in a contracting state New state(s): HU | published on 11.08.2021 [2021/32] | Applicant(s) | For all designated states Qualcomm Incorporated 5775 Morehouse Drive San Diego, CA 92121-1714 / US | [2009/14] | Inventor(s) | 01 /
Jia, Zhanfeng c/o Qualcomm Incorporated 5775 Morehouse Drive San Diego California 92121-1714 / US | 02 /
Julian, David Jonathan c/o Qualcomm Incorporated 5775 Morehouse Drive San Diego California 92121-1714 / US | [2018/33] |
Former [2009/14] | 01 /
Jia, Zhanfeng c/o Qualcomm Incorporated 5775 Morehouse Drive San Diego California 92121-1714 / US | ||
02 /
Julian, David Jonathan c/o Qualcomm Incorporated 5775 Morehouse Drive San Diego California 92121-1714 / US | Representative(s) | Heselberger, Johannes Bardehle Pagenberg Partnerschaft mbB Patentanwälte, Rechtsanwälte Prinzregentenplatz 7 81675 München / DE | [2018/33] |
Former [2009/14] | Heselberger, Johannes Patent- und Rechtsanwälte Bardehle - Pagenberg - Dost Altenburg - Geissler Galileiplatz 1 81679 München / DE | Application number, filing date | 08006543.6 | 31.03.2008 | [2009/14] | Priority number, date | US20070864728 | 28.09.2007 Original published format: US 864728 | [2009/14] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP2043400 | Date: | 01.04.2009 | Language: | EN | [2009/14] | Type: | A3 Search report | No.: | EP2043400 | Date: | 24.06.2009 | [2009/26] | Type: | B1 Patent specification | No.: | EP2043400 | Date: | 15.08.2018 | Language: | EN | [2018/33] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 26.05.2009 | Classification | IPC: | H04W8/00, H04W48/16 | [2017/48] | CPC: |
H04W8/005 (EP,US);
H04W48/16 (EP,US)
|
Former IPC [2009/14] | H04W48/16 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2018/33] |
Former [2009/14] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR | Title | German: | VERFAHREN UND VORRICHTUNGEN FÜR DIE ÄNDERUNG DER PHASE EINES PERIODISCHEN SCANS | [2018/20] | English: | METHOD AND APPARATUSES FOR CHANGING THE PHASE OF A PERIODIC SCAN | [2018/20] | French: | PROCÉDÉ ET DISPOSITIFS POUR CHANGER LA PHASE D'UN BALAYAGE PÉRIODIQUE | [2018/20] |
Former [2009/14] | Randomisierung des periodischen Kanalabtastungshintergrunds | ||
Former [2009/14] | Randomization of periodic channel scans background | ||
Former [2009/14] | Sélection au hasard d'arrière plan de balayages de canal périodique | Examination procedure | 14.12.2009 | Amendment by applicant (claims and/or description) | 14.12.2009 | Examination requested [2010/04] | 23.12.2016 | Despatch of a communication from the examining division (Time limit: M04) | 23.03.2017 | Reply to a communication from the examining division | 27.11.2017 | Cancellation of oral proceeding that was planned for 13.03.2018 | 08.12.2017 | Communication of intention to grant the patent | 12.03.2018 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 12.03.2018 | Fee for grant paid | 12.03.2018 | Fee for publishing/printing paid | 13.03.2018 | Date of oral proceedings (cancelled) | 16.04.2018 | Communication of intention to grant the patent | 11.07.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 23.12.2016 | Opposition(s) | 16.05.2019 | No opposition filed within time limit [2019/30] | Fees paid | Renewal fee | 08.03.2010 | Renewal fee patent year 03 | 10.03.2011 | Renewal fee patent year 04 | 07.03.2012 | Renewal fee patent year 05 | 08.03.2013 | Renewal fee patent year 06 | 10.03.2014 | Renewal fee patent year 07 | 06.03.2015 | Renewal fee patent year 08 | 08.03.2016 | Renewal fee patent year 09 | 07.03.2017 | Renewal fee patent year 10 | 07.03.2018 | Renewal fee patent year 11 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 31.03.2008 | AT | 15.08.2018 | CY | 15.08.2018 | CZ | 15.08.2018 | DK | 15.08.2018 | EE | 15.08.2018 | ES | 15.08.2018 | FI | 15.08.2018 | HR | 15.08.2018 | IT | 15.08.2018 | LT | 15.08.2018 | LV | 15.08.2018 | MC | 15.08.2018 | NL | 15.08.2018 | PL | 15.08.2018 | RO | 15.08.2018 | SE | 15.08.2018 | SI | 15.08.2018 | SK | 15.08.2018 | TR | 15.08.2018 | BG | 15.11.2018 | NO | 15.11.2018 | GR | 16.11.2018 | IS | 15.12.2018 | PT | 15.12.2018 | BE | 31.03.2019 | CH | 31.03.2019 | FR | 31.03.2019 | GB | 31.03.2019 | IE | 31.03.2019 | LI | 31.03.2019 | LU | 31.03.2019 | MT | 31.03.2019 | [2021/32] |
Former [2021/26] | AT | 15.08.2018 | |
CY | 15.08.2018 | ||
CZ | 15.08.2018 | ||
DK | 15.08.2018 | ||
EE | 15.08.2018 | ||
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
IT | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
MC | 15.08.2018 | ||
NL | 15.08.2018 | ||
PL | 15.08.2018 | ||
RO | 15.08.2018 | ||
SE | 15.08.2018 | ||
SI | 15.08.2018 | ||
SK | 15.08.2018 | ||
TR | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
PT | 15.12.2018 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
FR | 31.03.2019 | ||
GB | 31.03.2019 | ||
IE | 31.03.2019 | ||
LI | 31.03.2019 | ||
LU | 31.03.2019 | ||
MT | 31.03.2019 | ||
Former [2020/29] | AT | 15.08.2018 | |
CZ | 15.08.2018 | ||
DK | 15.08.2018 | ||
EE | 15.08.2018 | ||
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
IT | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
MC | 15.08.2018 | ||
NL | 15.08.2018 | ||
PL | 15.08.2018 | ||
RO | 15.08.2018 | ||
SE | 15.08.2018 | ||
SI | 15.08.2018 | ||
SK | 15.08.2018 | ||
TR | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
PT | 15.12.2018 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
FR | 31.03.2019 | ||
GB | 31.03.2019 | ||
IE | 31.03.2019 | ||
LI | 31.03.2019 | ||
LU | 31.03.2019 | ||
MT | 31.03.2019 | ||
Former [2020/16] | AT | 15.08.2018 | |
CZ | 15.08.2018 | ||
DK | 15.08.2018 | ||
EE | 15.08.2018 | ||
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
IT | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
MC | 15.08.2018 | ||
NL | 15.08.2018 | ||
PL | 15.08.2018 | ||
RO | 15.08.2018 | ||
SE | 15.08.2018 | ||
SI | 15.08.2018 | ||
SK | 15.08.2018 | ||
TR | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
FR | 31.03.2019 | ||
GB | 31.03.2019 | ||
IE | 31.03.2019 | ||
LI | 31.03.2019 | ||
LU | 31.03.2019 | ||
Former [2020/11] | AT | 15.08.2018 | |
CZ | 15.08.2018 | ||
DK | 15.08.2018 | ||
EE | 15.08.2018 | ||
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
IT | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
MC | 15.08.2018 | ||
NL | 15.08.2018 | ||
PL | 15.08.2018 | ||
RO | 15.08.2018 | ||
SE | 15.08.2018 | ||
SI | 15.08.2018 | ||
SK | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
FR | 31.03.2019 | ||
GB | 31.03.2019 | ||
IE | 31.03.2019 | ||
LI | 31.03.2019 | ||
LU | 31.03.2019 | ||
Former [2020/09] | AT | 15.08.2018 | |
CZ | 15.08.2018 | ||
DK | 15.08.2018 | ||
EE | 15.08.2018 | ||
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
IT | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
MC | 15.08.2018 | ||
NL | 15.08.2018 | ||
PL | 15.08.2018 | ||
RO | 15.08.2018 | ||
SE | 15.08.2018 | ||
SI | 15.08.2018 | ||
SK | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
IE | 31.03.2019 | ||
LU | 31.03.2019 | ||
Former [2020/01] | AT | 15.08.2018 | |
CZ | 15.08.2018 | ||
DK | 15.08.2018 | ||
EE | 15.08.2018 | ||
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
IT | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
MC | 15.08.2018 | ||
NL | 15.08.2018 | ||
PL | 15.08.2018 | ||
RO | 15.08.2018 | ||
SE | 15.08.2018 | ||
SI | 15.08.2018 | ||
SK | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
LU | 31.03.2019 | ||
Former [2019/46] | AT | 15.08.2018 | |
CZ | 15.08.2018 | ||
DK | 15.08.2018 | ||
EE | 15.08.2018 | ||
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
IT | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
MC | 15.08.2018 | ||
NL | 15.08.2018 | ||
PL | 15.08.2018 | ||
RO | 15.08.2018 | ||
SE | 15.08.2018 | ||
SI | 15.08.2018 | ||
SK | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/37] | AT | 15.08.2018 | |
CZ | 15.08.2018 | ||
DK | 15.08.2018 | ||
EE | 15.08.2018 | ||
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
IT | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
NL | 15.08.2018 | ||
PL | 15.08.2018 | ||
RO | 15.08.2018 | ||
SE | 15.08.2018 | ||
SI | 15.08.2018 | ||
SK | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/26] | AT | 15.08.2018 | |
CZ | 15.08.2018 | ||
DK | 15.08.2018 | ||
EE | 15.08.2018 | ||
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
IT | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
NL | 15.08.2018 | ||
PL | 15.08.2018 | ||
RO | 15.08.2018 | ||
SE | 15.08.2018 | ||
SK | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/24] | AT | 15.08.2018 | |
CZ | 15.08.2018 | ||
EE | 15.08.2018 | ||
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
IT | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
NL | 15.08.2018 | ||
PL | 15.08.2018 | ||
RO | 15.08.2018 | ||
SE | 15.08.2018 | ||
SK | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/22] | AT | 15.08.2018 | |
CZ | 15.08.2018 | ||
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
IT | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
NL | 15.08.2018 | ||
PL | 15.08.2018 | ||
RO | 15.08.2018 | ||
SE | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/21] | AT | 15.08.2018 | |
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
IT | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
NL | 15.08.2018 | ||
SE | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/12] | AT | 15.08.2018 | |
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
NL | 15.08.2018 | ||
SE | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/11] | AT | 15.08.2018 | |
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
LT | 15.08.2018 | ||
NL | 15.08.2018 | ||
SE | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/10] | AT | 15.08.2018 | |
FI | 15.08.2018 | ||
LT | 15.08.2018 | ||
NL | 15.08.2018 | ||
SE | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/09] | FI | 15.08.2018 | |
LT | 15.08.2018 | ||
NL | 15.08.2018 | ||
NO | 15.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/08] | FI | 15.08.2018 | |
LT | 15.08.2018 | ||
NO | 15.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/07] | LT | 15.08.2018 | Documents cited: | Search | [A]US2002059434 (KARAOGUZ JEYHAN [US], et al) [A] 1-37 * abstract * * paragraph [0064] - paragraph [0065] * * paragraph [0082] - paragraph [0083] ** figures 7-10,12 *; | [A]US2003027526 (HILLYARD JASON [US]) [A] 1-37 * abstract * * paragraph [0011] * * paragraph [0016] * * paragraph [0042] - paragraph [0046] * * paragraph [0049] - paragraph [0052] * * figures 4-6 *; | [A]US2006114841 (DATE MASAAKI [JP], et al) [A] 1-37 * abstract * * paragraph [0008] - paragraph [0014] * * paragraph [0034] - paragraph [0038] * * paragraph [0063] - paragraph [0070] * * paragraph [0147] * * figures 2,3,7 *; | [X] - BLUETOOTH SIG, "Bluetooth Specification Version 1.1 Inquiry Procedures", BLUETOOTH SPECIFICATION VERSION 1.1, (20010508), pages 105 - 109, XP002208576 [X] 1-37 * page 105, line 3 - line 10 * * page 105, line 14 - line 16 * * page 105, line 23 - line 24 * * page 106, line 35 - line 36 * * page 107, line 7 - line 8 * * page 108, line 9 - line 11 * * page 108, line 15 - line 24 * |