blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1909505

EP1909505 - Motion compensation method, picture coding method and picture decoding method [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  25.04.2014
Database last updated on 02.09.2024
Most recent event   Tooltip17.07.2015Lapse of the patent in a contracting state
New state(s): HU, LU
published on 19.08.2015  [2015/34]
Applicant(s)For all designated states
Panasonic Corporation
1006, Oaza Kadoma
Kadoma-shi
Osaka 571-8501 / JP
[N/P]
Former [2008/47]For all designated states
Panasonic Corporation
1006, Oaza Kadoma Kadoma-shi
Osaka 571-8501 / JP
Former [2008/15]For all designated states
MATSUSHITA ELECTRIC INDUSTRIAL CO., LTD.
1006, Oaza Kadoma, Kadoma-shi
Osaka 571-8501 / JP
Inventor(s)01 / Kadono, Shinya@Matsushita Electric Industrial Co., Ltd.@IP Development Center
Intellectual Property Rights Operation Company
19F Matsushita IMP Building, 3-7, Shiromi
1-chome, Chuo-ku
Osaka, Osaka-shi 540-6319 / JP
02 / Abe, Kiyofumi@Matsushita Electric Industrial Co., Ltd.@IP Development Center
Intellectual Property Rights Operation Company
19F Matsushita IMP Building, 3-7, Shiromi
1-chome, Chuo-ku
Osaka, Osaka-shi 540-6319 / JP
03 / Kondo, Satoshi@Matsushita Electric Industrial Co., Ltd.@IP Development Center
Intellectual Property Rights Operation Company
19F Matsushita IMP Building, 3-7, Shiromi
1-chome, Chuo-ku
Osaka, Osaka-shi 540-6319 / JP
 [2013/25]
Former [2008/15]01 / Kadono, Shinya Matsushita Electric Industrial Co., Ltd. IP Development Center
Intellectual Property Rights Operation Company 19F Matsushita IMP Building, 3-7, Shiromi 1-chome, Chuo-ku
Osaka, Osaka-shi 540-6319 / JP
02 / Abe, Kiyofumi Matsushita Electric Industrial Co., Ltd. IP Development Center
Intellectual Property Rights Operation Company 19F Matsushita IMP Building, 3-7, Shiromi 1-chome, Chuo-ku
Osaka, Osaka-shi 540-6319 / JP
03 / Kondo, Satoshi Matsushita Electric Industrial Co., Ltd. IP Development Center
Intellectual Property Rights Operation Company 19F Matsushita IMP Building, 3-7, Shiromi 1-chome, Chuo-ku
Osaka, Osaka-shi 540-6319 / JP
Representative(s)Eisenführ Speiser
Patentanwälte Rechtsanwälte PartGmbB
Postfach 10 60 78
28060 Bremen / DE
[N/P]
Former [2013/25]Eisenführ, Speiser & Partner
Postfach 10 60 78
28060 Bremen / DE
Former [2008/40]Eisenführ, Speiser & Partner
Patentanwälte Rechtsanwälte Postfach 10 60 78
28060 Bremen / DE
Former [2008/15]Eisenführ, Speiser & Partner
Patentanwälte Rechtsanwälte Postfach 10 60 78
28060 Bremen / DE
Application number, filing date08100041.628.08.2003
[2008/15]
Priority number, dateJP2002034039025.11.2002         Original published format: JP 2002340390
[2008/15]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP1909505
Date:09.04.2008
Language:EN
[2008/15]
Type: A3 Search report 
No.:EP1909505
Date:21.07.2010
[2010/29]
Type: B1 Patent specification 
No.:EP1909505
Date:19.06.2013
Language:EN
[2013/25]
Search report(s)(Supplementary) European search report - dispatched on:EP22.06.2010
ClassificationIPC:H04N7/50
[2010/28]
CPC:
H04N19/52 (EP,US); H04N19/139 (BR,US); H04N19/137 (KR,US);
H04N19/513 (BR,US); H04N19/122 (US); H04N19/169 (US);
H04N19/172 (US); H04N19/176 (US); H04N19/51 (KR,US);
H04N19/521 (US); H04N19/557 (EP,US); H04N19/56 (US);
H04N19/57 (US); H04N19/577 (EP,US); H04N19/583 (US);
H04N19/593 (US); H04N19/61 (US) (-)
Former IPC [2008/15]H04N7/36
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IT,   LI,   LU,   MC,   NL,   PT,   RO,   SE,   SI,   SK,   TR [2008/15]
Extension statesAL21.01.2011
LT21.01.2011
LV21.01.2011
MK21.01.2011
TitleGerman:Bewegungskompensationsverfahren, Verfahren zur Bildkodierung und Verfahren zur Bilddekodierung[2008/15]
English:Motion compensation method, picture coding method and picture decoding method[2008/15]
French:Procédé de compensation du mouvement, procédé de codage d'images et procédé de décodage d'images[2008/15]
Examination procedure26.11.2010Amendment by applicant (claims and/or description)
21.01.2011Examination requested  [2011/09]
08.03.2011Despatch of a communication from the examining division (Time limit: M04)
28.06.2011Reply to a communication from the examining division
11.01.2013Cancellation of oral proceeding that was planned for 22.01.2013
22.01.2013Date of oral proceedings (cancelled)
29.01.2013Communication of intention to grant the patent
03.04.2013Fee for grant paid
03.04.2013Fee for publishing/printing paid
Parent application(s)   TooltipEP03811870.9  / EP1569460
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued (EP20030811870) is  08.10.2007
Opposition(s)20.03.2014No opposition filed within time limit [2014/22]
Fees paidRenewal fee
06.05.2008Renewal fee patent year 03
06.05.2008Renewal fee patent year 04
06.05.2008Renewal fee patent year 05
19.03.2008Renewal fee patent year 06
31.08.2009Renewal fee patent year 07
31.08.2010Renewal fee patent year 08
31.08.2011Renewal fee patent year 09
31.08.2012Renewal fee patent year 10
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU28.08.2003
AT19.06.2013
BE19.06.2013
CY19.06.2013
CZ19.06.2013
DK19.06.2013
EE19.06.2013
FI19.06.2013
MC19.06.2013
RO19.06.2013
SE19.06.2013
SI19.06.2013
SK19.06.2013
TR19.06.2013
IE28.08.2013
LU28.08.2013
CH31.08.2013
LI31.08.2013
BG19.09.2013
GR20.09.2013
ES30.09.2013
PT21.10.2013
[2015/34]
Former [2015/32]AT19.06.2013
BE19.06.2013
CY19.06.2013
CZ19.06.2013
DK19.06.2013
EE19.06.2013
FI19.06.2013
MC19.06.2013
RO19.06.2013
SE19.06.2013
SI19.06.2013
SK19.06.2013
TR19.06.2013
IE28.08.2013
CH31.08.2013
LI31.08.2013
BG19.09.2013
GR20.09.2013
ES30.09.2013
PT21.10.2013
Former [2014/33]AT19.06.2013
BE19.06.2013
CY19.06.2013
CZ19.06.2013
DK19.06.2013
EE19.06.2013
FI19.06.2013
MC19.06.2013
RO19.06.2013
SE19.06.2013
SI19.06.2013
SK19.06.2013
IE28.08.2013
CH31.08.2013
LI31.08.2013
BG19.09.2013
GR20.09.2013
ES30.09.2013
PT21.10.2013
Former [2014/21]AT19.06.2013
BE19.06.2013
CY19.06.2013
CZ19.06.2013
DK19.06.2013
EE19.06.2013
FI19.06.2013
MC19.06.2013
RO19.06.2013
SE19.06.2013
SI19.06.2013
SK19.06.2013
CH31.08.2013
LI31.08.2013
BG19.09.2013
GR20.09.2013
ES30.09.2013
PT21.10.2013
Former [2014/20]AT19.06.2013
BE19.06.2013
CY19.06.2013
CZ19.06.2013
EE19.06.2013
FI19.06.2013
MC19.06.2013
RO19.06.2013
SE19.06.2013
SI19.06.2013
SK19.06.2013
CH31.08.2013
LI31.08.2013
BG19.09.2013
GR20.09.2013
ES30.09.2013
PT21.10.2013
Former [2014/18]AT19.06.2013
BE19.06.2013
CY19.06.2013
CZ19.06.2013
EE19.06.2013
FI19.06.2013
RO19.06.2013
SE19.06.2013
SI19.06.2013
SK19.06.2013
BG19.09.2013
GR20.09.2013
ES30.09.2013
PT21.10.2013
Former [2014/11]AT19.06.2013
BE19.06.2013
CZ19.06.2013
EE19.06.2013
FI19.06.2013
RO19.06.2013
SE19.06.2013
SI19.06.2013
SK19.06.2013
CY03.07.2013
BG19.09.2013
GR20.09.2013
ES30.09.2013
PT21.10.2013
Former [2014/10]AT19.06.2013
BE19.06.2013
CZ19.06.2013
EE19.06.2013
FI19.06.2013
SE19.06.2013
SI19.06.2013
SK19.06.2013
CY03.07.2013
BG19.09.2013
GR20.09.2013
ES30.09.2013
PT21.10.2013
Former [2014/09]AT19.06.2013
BE19.06.2013
EE19.06.2013
FI19.06.2013
SE19.06.2013
SI19.06.2013
BG19.09.2013
GR20.09.2013
ES30.09.2013
PT21.10.2013
Former [2014/08]BE19.06.2013
FI19.06.2013
SE19.06.2013
SI19.06.2013
BG19.09.2013
GR20.09.2013
ES30.09.2013
PT21.10.2013
Former [2013/50]FI19.06.2013
SE19.06.2013
SI19.06.2013
BG19.09.2013
GR20.09.2013
ES30.09.2013
Former [2013/49]FI19.06.2013
SE19.06.2013
SI19.06.2013
GR20.09.2013
ES30.09.2013
Former [2013/48]ES30.09.2013
Documents cited:Search[I]  - ALEXIS MICHAEL TOURAPIS, FENG WU, AND SHIPENG LI, "Performance comparison of Temporal and Spatial Direct mode", JOINT VIDEO TEAM (JVT) OF ISO/IEC MPEG & ITU-T VCEG(ISO/IEC JTC1/SC29/WG11 AND ITU-T SG16 Q.6)5TH MEETING: GENEVA, SWITZERLAND, 9-17 OCTOBER, 2002, DOCUMENT JVT-E26, (20021009), XP002585703 [I] 1-5 * the whole document *
 [AD]  - "H.26L TEST MODEL LONG TERM NUMBER 8 (TML-8) DRAFT0", ITU-T TELECOMMUNICATION STANDARIZATION SECTOR OF ITU, GENEVA, CH, (20010402), pages 1 - 54, XP001089814 [AD] 1-5 * paragraph [7.2.1] *
 [A]  - KIM D-W ET AL, "Adaptive motion estimation based on spatio-temporal correlation", SIGNAL PROCESSING. IMAGE COMMUNICATION, ELSEVIER SCIENCE PUBLISHERS, AMSTERDAM, NL, (199808), vol. 13, no. 2, ISSN 0923-5965, pages 161 - 170, XP004129635 [A] 1-5 * the whole document *

DOI:   http://dx.doi.org/10.1016/S0923-5965(98)80013-1
 [A]  - CHEN M C ET AL, "Design and optimization of a differentially coded variable block size motion compensation system", PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON IMAGE PROCESSING (ICIP) LAUSANNE, SEPT. 16 - 19, 1996, NEW YORK, IEEE, US, (19960916), VOL. 1, ISBN 0-7803-3259-8, pages 259 - 262, XP010202380 [A] 1-5 * the whole document *

DOI:   http://dx.doi.org/10.1109/ICIP.1996.560437
Examination   - WINGER, "Reducing decoder peak bus bandwidth by >50%", 3. JVT MEETING; 60. MPEG MEETING; 06-05-2002 - 10-05-2002; FAIRFAX,US; (JOINT VIDEO TEAM OF ISO/IEC JTC1/SC29/WG11 AND ITU-T SG.16 ),, (20020510), no. JVT-C115r2-L, ISSN 0000-0442, XP030005226
    - TOURAPIS, "8x8 Block Restriction in Spatial Direct Mode", 6. JVT MEETING; 63. MPEG MEETING; 09-12-2002 - 13-12-2002; AWAJI, JP;(JOINT VIDEO TEAM OF ISO/IEC JTC1/SC29/WG11 AND ITU-T SG.16 ),, (20021213), no. JVT-F025, ISSN 0000-0428, XP030005595
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.