blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2153884

EP2153884 - Gas delivery method and device [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  14.01.2011
Database last updated on 30.09.2024
Most recent event   Tooltip14.01.2011Application deemed to be withdrawnpublished on 16.02.2011  [2011/07]
Applicant(s)For all designated states
Air Products and Chemicals, Inc.
7201 Hamilton Boulevard
Allentown, PA 18195-1501 / US
[2010/07]
Inventor(s)01 / Tassel, Andrew Duncan
16 Overton Hill London Road
Overton, Hampshire RG25 3PD / GB
02 / Downie, Neil Alexander
Sunnyside Potbridge Road
Odiham, Hampshire RG29 1JN / GB
03 / Wiktorowicz, Richard
16 Nash Close Stoke Grange
Aylesbury, Buckinghampshire HP21 9YB / GB
 [2010/07]
Representative(s)Burford, Anthony Frederick
Beck Greener
Fulwood House
12 Fulwood Place
London
WC1V 6HR / GB
[N/P]
Former [2010/07]Burford, Anthony Frederick
Beck Greener Fulwood House 12 Fulwood Place London
WC1V 6HR / GB
Application number, filing date08162454.615.08.2008
[2010/07]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP2153884
Date:17.02.2010
Language:EN
[2010/07]
Search report(s)(Supplementary) European search report - dispatched on:EP28.01.2009
ClassificationIPC:B01F3/02
[2010/07]
CPC:
B01F23/10 (EP,US); B01F25/313 (EP,US); B01F25/31324 (EP,US);
Y10T137/0329 (EP,US); Y10T137/2514 (EP,US)
Designated contracting states(deleted) [2010/42]
Former [2010/07]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MT,  NL,  NO,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
TitleGerman:Gaslieferverfahren und Vorrichtung[2010/07]
English:Gas delivery method and device[2010/07]
French:Procédé et dispositif d'approvisionnement de gaz[2010/07]
Examination procedure18.08.2010Application deemed to be withdrawn, date of legal effect  [2011/07]
24.09.2010Despatch of communication that the application is deemed to be withdrawn, reason: examination fee not paid in time  [2011/07]
Fees paidPenalty fee
Additional fee for renewal fee
31.08.201003   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[X]CH563807  (BATTELLE MEMORIAL INSTITUTE) [X] 10-15 * column 5, line 46 - column 5, line 66; figure 2 *;
 [X]EP1586369  (SCHERRER INST PAUL [CH], et al) [X] 10-15 * paragraph [0018] - paragraph [0025]; figures 2,4 *;
 [A]DE19645695  (DEUTSCH ZENTR LUFT & RAUMFAHRT [DE]) [A] 1-15 * abstract *;
 [A]WO02070116  (PARSONS AUSTRALIA PTY LTD [AU], et al) [A] 1-15 * abstract *;
 [DA]EP0028209  (SMIDAK EMIL F) [DA] 1-15 * abstract *
by applicantEP0028209
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.