blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2063108

EP2063108 - System and method for optimizing wake interaction between wind turbines [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  14.09.2012
Database last updated on 02.09.2024
Most recent event   Tooltip14.09.2012Application deemed to be withdrawnpublished on 17.10.2012  [2012/42]
Applicant(s)For all designated states
General Electric Company
1 River Road
Schenectady, NY 12345 / US
[2009/22]
Inventor(s)01 / Vyas, Parag
Mitterwieserstr. 4
80797, Munich / DE
02 / Aalburg, Christian
Hesseloherstrasse 9
80802, Munich / DE
03 / Anbarasu, Arungalai
A104, Millenium Habitat Brookefields Kundalahalli
560037, Bangalore / IN
04 / Gujjar, Vineel Chandrakanth
No. 33, 1 B Main Road N R Layout Konena Agrahara, HAL
560017, Bangalore / IN
05 / Cardinal, Mark Edward
6020 Gardner Road
Altamont, NY 12009 / US
 [2009/22]
Representative(s)Bedford, Grant Richard
GPO Europe
GE International Inc. The Ark
201 Talgarth Road
Hammersmith
London W6 8BJ / GB
[N/P]
Former [2009/22]Bedford, Grant Richard
GE London Patent Operation 15 John Adam Street
London WC2N 6LU / GB
Application number, filing date08165452.730.09.2008
[2009/22]
Priority number, dateUS2007087276216.10.2007         Original published format: US 872762
[2009/22]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP2063108
Date:27.05.2009
Language:EN
[2009/22]
Type: A3 Search report 
No.:EP2063108
Date:07.12.2011
Language:EN
[2011/49]
Search report(s)(Supplementary) European search report - dispatched on:EP04.11.2011
ClassificationIPC:F03D7/00, F03D9/00, F03D7/04
[2011/49]
CPC:
F03D7/0292 (EP,US); F03D7/047 (EP,US); F03D7/048 (EP,US);
F05B2270/204 (EP); Y02E10/72 (EP,US)
Former IPC [2009/22]F03D7/00, F03D9/00
Designated contracting states(deleted) [2012/33]
Former [2009/22]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MT,  NL,  NO,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
TitleGerman:System und Verfahren zur Optimierung der Wirbelstrominteraktion zwischen Windturbine[2009/22]
English:System and method for optimizing wake interaction between wind turbines[2009/22]
French:Système et procédé d'optimisation d'interaction de sillage entre les éoliennes[2009/22]
Examination procedure03.04.2012Application deemed to be withdrawn, date of legal effect  [2012/42]
10.05.2012Despatch of communication that the application is deemed to be withdrawn, reason: renewal fee not paid in time  [2012/42]
Fees paidRenewal fee
30.09.2010Renewal fee patent year 03
Penalty fee
Additional fee for renewal fee
30.09.201104   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[XA]WO2004111446  (ENERGIEONDERZOEK CT NEDERLAND [NL], et al) [X] 1,4,5,7-9 * page 6, line 31 - page 7, line 15 * * page 5, line 19 - line 24 * * page 11, line 1 - line 24 * * figures 1,2 * [A] 2,3,6;
 [X]DE102004056254  (REPOWER SYSTEMS AG [DE]) [X] 1-9 * paragraphs [0006] , [0012] , [0014] , [0025] , [0044] , [0045] , [0047] * * figures 2,8 *;
 [X]EP1790851  (GEN ELECTRIC [US]) [X] 1-9 * paragraphs [0001] , [0007] , [0009] , [0010] , [0014] , [0017] , [0019] , [0021] , [0022] * * figures 1,2 *;
 [A]DE102005033229  (SIEMENS AG [DE]) [A] 1-9 * paragraphs [0001] , [0002] , [0003] , [0004] , [0007] , [0008] , [0011] , [0013] , [0029] * * figures 1,2,3 *;
 [A]  - MILBORROW D J, "THE PERFORMANCE OF ARRAYS OF WIND TURBINES", JOURNAL OF INDUSTRIAL AERODYNAMICS, ELSEVIER SCIENTIFIC PUBLISHING CO., AMSTERDAM, NL, (19800501), vol. 5, doi:10.1016/0167-6105(80)90044-6, ISSN 0304-3908, pages 403 - 430, XP008023145 [A] 1-9 * the whole document *

DOI:   http://dx.doi.org/10.1016/0167-6105(80)90044-6
 [A]  - STEINBUCH M ET AL, "OPTIMAL CONTROL OF WIND POWER PLANTS", JOURNAL OF WIND ENGINEERING AND INDUSTRIAL AERODYNAMICS, XX, XX, (19880101), vol. 27, doi:10.1016/0167-6105(88)90039-6, pages 237 - 246, XP008023141 [A] 1-9 * the whole document *

DOI:   http://dx.doi.org/10.1016/0167-6105(88)90039-6
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.