blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2093975

EP2093975 - Communications system, nodes, and method for releasing redundant connections [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  14.12.2018
Database last updated on 01.10.2024
FormerExamination is in progress
Status updated on  04.11.2016
Most recent event   Tooltip14.12.2018Application deemed to be withdrawnpublished on 16.01.2019  [2019/03]
Applicant(s)For all designated states
Fujitsu Limited
1-1, Kamikodanaka 4-chome Nakahara-ku
Kawasaki-shi, Kanagawa 211-8588 / JP
[2009/35]
Inventor(s)01 / WATANABE, Teruyoshi
c/o FUJITSU LIMITED 1-1, Kamikodanaka 4-chome, Nak
Kawasaki-shi, Kanagawa 211-8588 / JP
 [2009/35]
Representative(s)Haseltine Lake Kempner LLP
Cheapside House
138 Cheapside
London EC2V 6BJ / GB
[N/P]
Former [2009/35]Stebbing, Timothy Charles
Haseltine Lake LLP Lincoln House, 5th Floor 300 High Holborn
London WC1V 7JH / GB
Application number, filing date08170106.227.11.2008
[2009/35]
Priority number, dateJP2008003859520.02.2008         Original published format: JP 2008038595
[2009/35]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP2093975
Date:26.08.2009
Language:EN
[2009/35]
Search report(s)(Supplementary) European search report - dispatched on:EP06.07.2009
ClassificationIPC:H04L29/08, // H04L29/06
[2009/35]
CPC:
H04L69/22 (EP,US); H04L69/161 (EP,US); H04L69/326 (EP,US);
H04W92/20 (EP,US)
Designated contracting statesDE,   FR,   GB [2010/18]
Former [2009/35]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MT,  NL,  NO,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
TitleGerman:Kommunikationssystem, Knoten und Verfahren redundante Verbindungen zu trennen[2009/35]
English:Communications system, nodes, and method for releasing redundant connections[2009/35]
French:Système de communication, noeuds et procédé pour terminer des connexions redondantes[2009/35]
Examination procedure22.02.2010Examination requested  [2010/14]
26.02.2010Amendment by applicant (claims and/or description)
27.02.2010Loss of particular rights, legal effect: designated state(s)
08.04.2010Despatch of communication of loss of particular rights: designated state(s) AT, BE, BG, CH, CY, CZ, DK, EE, ES, FI, GR, HR, HU, IE, IS, IT, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR
16.07.2010Despatch of a communication from the examining division (Time limit: M04)
17.11.2010Reply to a communication from the examining division
07.11.2013Despatch of a communication from the examining division (Time limit: M06)
19.03.2014Reply to a communication from the examining division
19.02.2016Despatch of a communication from the examining division (Time limit: M04)
16.06.2016Reply to a communication from the examining division
25.10.2016Despatch of a communication from the examining division (Time limit: M04)
20.02.2017Reply to a communication from the examining division
04.06.2018Despatch of a communication from the examining division (Time limit: M02)
15.08.2018Application deemed to be withdrawn, date of legal effect  [2019/03]
07.09.2018Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time  [2019/03]
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  16.07.2010
Fees paidRenewal fee
30.11.2010Renewal fee patent year 03
29.11.2011Renewal fee patent year 04
04.09.2012Renewal fee patent year 05
02.09.2013Renewal fee patent year 06
05.09.2014Renewal fee patent year 07
04.09.2015Renewal fee patent year 08
02.09.2016Renewal fee patent year 09
27.10.2017Renewal fee patent year 10
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[X]  - BERNARD ABOBA, "IPsec-NAT Compatibility Requirements; draft-aboba-nat-ipsec-04.txt", INTERNET ENGINEERING TASK FORCE (IETF) DRAFT, (20010530), XP015009819 [X] 1,2,6,14 * page 3, lines 13-28 *
 [T]  - ALCATEL-LUCENT, "Crossing of X2 Setup Request", 3GPP DRAFT; R3-090100_SETUPPROC, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE, (20090209), XP050324886 [T] 1-14 * the whole document *
Examination   - FIELDING R ET AL, "Hypertext Transfer Protocol -- HTTP/1.1; RFC 2616", INTERNET ENGINEERING TASK FORCE, (19990601), XP015008399
    - Brian Totty ET AL, "Parallel Connections", HTTP: The Definitive Guide, O'Reilly Media, Inc., (20020901), ISBN 978-1-56592-509-0, XP055249511
    - NORTEL, "Text proposal for X2 Multiple SCTP association", 3GPP DRAFT; R3-080112_CR2_MULTIPLESCTPASSO_10.2.5_36.422_REV0, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20080205), vol. RAN WG3, no. Sorrento, Italy; 20080205, XP050163338
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.