blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2009270

EP2009270 - Gas turbine with multiple gas flow paths [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  10.03.2017
Database last updated on 29.07.2024
Most recent event   Tooltip10.03.2017No opposition filed within time limitpublished on 12.04.2017  [2017/15]
Applicant(s)For all designated states
United Technologies Corporation
10 Farm Springs Road
Farmington, CT 06032 / US
[2016/43]
Former [2016/18]For all designated states
United Technologies Corporation
United Technologies Building
1 Financial Plaza
Hartford, CT 06101 / US
Former [2009/01]For all designated states
United Technologies Corporation
United Technologies Building, 1 Financial Plaza
Hartford, CT 06101 / US
Inventor(s)01 / Kupratis, Daniel B.
12 Sunset Drive
Wallingford, CT 06492 / US
 [2009/01]
Representative(s)Leckey, David Herbert
Dehns
St Bride's House
10 Salisbury Square
London EC4Y 8JD / GB
[N/P]
Former [2016/18]Leckey, David Herbert
Dehns
St Bride's House
10 Salisbury Square
London
EC4Y 8JD / GB
Former [2009/01]Leckey, David Herbert
Frank B. Dehn & Co. St Bride's House 10 Salisbury Square London
EC4Y 8JD / GB
Application number, filing date08251269.031.03.2008
[2009/01]
Priority number, dateUS2007077000828.06.2007         Original published format: US 770008
[2009/01]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP2009270
Date:31.12.2008
Language:EN
[2009/01]
Type: A3 Search report 
No.:EP2009270
Date:04.04.2012
Language:EN
[2012/14]
Type: B1 Patent specification 
No.:EP2009270
Date:04.05.2016
Language:EN
[2016/18]
Search report(s)(Supplementary) European search report - dispatched on:EP06.03.2012
ClassificationIPC:F02K3/077, F02C3/06
[2009/01]
CPC:
F02K3/077 (EP,US); F02C3/064 (EP,US); F05D2260/4031 (EP,US)
Designated contracting statesDE,   GB [2012/50]
Former [2009/01]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MT,  NL,  NO,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
TitleGerman:Gasturbine mit mehreren Gasströmungspfaden[2009/01]
English:Gas turbine with multiple gas flow paths[2009/01]
French:Turbine à gaz dotée de multiples passages d'écoulement de gaz[2009/01]
Examination procedure02.10.2012Amendment by applicant (claims and/or description)
02.10.2012Examination requested  [2012/46]
05.10.2012Loss of particular rights, legal effect: designated state(s)
12.11.2012Despatch of communication of loss of particular rights: designated state(s) AT, BE, BG, CH, CY, CZ, DK, EE, ES, FI, FR, GR, HR, HU, IE, IS, IT, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR
24.07.2013Despatch of a communication from the examining division (Time limit: M06)
30.01.2014Reply to a communication from the examining division
04.02.2016Communication of intention to grant the patent
21.03.2016Fee for grant paid
21.03.2016Fee for publishing/printing paid
21.03.2016Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  24.07.2013
Opposition(s)07.02.2017No opposition filed within time limit [2017/15]
Fees paidRenewal fee
24.03.2010Renewal fee patent year 03
15.03.2011Renewal fee patent year 04
14.03.2012Renewal fee patent year 05
11.03.2013Renewal fee patent year 06
12.03.2014Renewal fee patent year 07
10.03.2015Renewal fee patent year 08
23.03.2016Renewal fee patent year 09
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[Y]US3282053  (WILLY MESSERSCHMITT) [Y] 13-15* column 1 - column 3, line 20; figure 2 *;
 [X]US4376375  (BOUDIGUES SERGE [FR]) [X] 1,8,9,12 * column 1 - column 4, line 12; figures 1,3 *;
 [Y]US4827712  (COPLIN JOHN F [GB]) [Y] 3,4 * column 1 - column 7, line 55; figure 1 *;
 [Y]EP0860593  (SNECMA [FR]) [Y] 5-7 * column 1 - column 2; figure 1 *;
 [XY]EP1510682  (GEN ELECTRIC [US]) [X] 1,8-12 * paragraph [0011] - paragraph [0028]; figures 1,4 * * paragraph [0031] - paragraph [0034] * * paragraph [0036] - paragraph [0038]; figures 6-7 * [Y] 5-7;
 [XYI]EP1624169  (GEN ELECTRIC [US]) [X] 1,8,12 * paragraph [0009] - paragraph [0020]; figures 1-2 * [Y] 3,4,13-15 [I] 2
ExaminationEP1653064
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.