EP2042134 - Fixed-bearing knee prosthesis having interchangeable components [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 04.03.2016 Database last updated on 13.07.2024 | Most recent event Tooltip | 13.10.2017 | Lapse of the patent in a contracting state New state(s): BG, CY, HU, SE, TR | published on 15.11.2017 [2017/46] | Applicant(s) | For all designated states DePuy (Ireland) Loughbeg Ringaskiddy Co Cork / IE | [2013/35] |
Former [2009/14] | For all designated states DePuy Products, Inc. 700 Orthopaedic Drive Warsaw, IN 46581 / US | Inventor(s) | 01 /
Hazebrouck, Stephen A. 2504 Orchard Drive Winona Lake IN 46590 / US | 02 /
Deffenbaugh, Daren L. 1408 Winchester Court Winona Lake IN 46590 / US | 03 /
Heldreth, Mark A. 7140 North 900 East Mentone IN 46539 / US | 04 /
Bryant, Jack T. 3178 North 200 West Warsaw IN 46582 / US | 05 /
Meier, Rusty T. 54 EMS C-31 Lane Warsaw IN 46582 / US | [2013/30] |
Former [2009/14] | 01 /
Hazebrouck, Stephen A. 2504 Orchard Drive Winona Lake IN 46590 / US | ||
02 /
Deffenbaugh, Daren L. 1408 Winchester Court Winona Lake IN 46590 / US | |||
03 /
Heldreth, Mark A. 7140 North 900 East Mentone IN 46539 / US | |||
04 /
Bryant, Jack T. 3178 North 200 West Warsaw IN 46582 / US | |||
05 /
Meier, Rusty T. 54 EMS C-31 Lane Warsaw in 46582 / US | Representative(s) | Tunstall, Christopher Stephen, et al Carpmaels & Ransford LLP One Southampton Row London WC1B 5HA / GB | [2015/18] |
Former [2009/14] | Tunstall, Christopher Stephen, et al Carpmaels & Ransford 43-45 Bloomsbury Square London WC1A 2RA / GB | Application number, filing date | 08253140.1 | 26.09.2008 | [2009/14] | Priority number, date | US20070863318 | 28.09.2007 Original published format: US 863318 | [2009/14] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2042134 | Date: | 01.04.2009 | Language: | EN | [2009/14] | Type: | B1 Patent specification | No.: | EP2042134 | Date: | 29.04.2015 | Language: | EN | [2015/18] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 23.12.2008 | Classification | IPC: | A61F2/38 | [2009/14] | CPC: |
A61F2/389 (EP,US);
A61F2002/30172 (EP,US);
A61F2002/30181 (EP,US);
A61F2002/30329 (EP,US);
A61F2002/305 (EP,US);
A61F2002/30616 (EP,US);
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2015/18] |
Former [2009/14] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR | Title | German: | Festlagerknieprothese mit austauschbaren Komponenten | [2009/14] | English: | Fixed-bearing knee prosthesis having interchangeable components | [2009/14] | French: | Prothèse de genou à roulement fixe doté de composants interchangeables | [2009/14] | Examination procedure | 30.09.2009 | Examination requested [2009/46] | 13.11.2009 | Despatch of a communication from the examining division (Time limit: M06) | 29.06.2010 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time | 13.08.2010 | Reply to a communication from the examining division | 15.04.2011 | Despatch of a communication from the examining division (Time limit: M04) | 27.06.2011 | Reply to a communication from the examining division | 26.06.2013 | Communication of intention to grant the patent | 05.11.2013 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 14.11.2014 | Communication of intention to grant the patent | 23.03.2015 | Fee for grant paid | 23.03.2015 | Fee for publishing/printing paid | 23.03.2015 | Receipt of the translation of the claim(s) | Divisional application(s) | EP11190339.9 / EP2428188 | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 13.11.2009 | Opposition(s) | 01.02.2016 | No opposition filed within time limit [2016/14] | Request for further processing for: | The application is deemed to be withdrawn due to failure to reply to the examination report | 13.08.2010 | Request for further processing filed | 13.08.2010 | Full payment received (date of receipt of payment) | Fees paid | Renewal fee | 14.09.2010 | Renewal fee patent year 03 | 29.09.2011 | Renewal fee patent year 04 | 12.09.2012 | Renewal fee patent year 05 | 12.09.2013 | Renewal fee patent year 06 | 12.09.2014 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 26.09.2008 | AT | 29.04.2015 | BG | 29.04.2015 | CY | 29.04.2015 | CZ | 29.04.2015 | DK | 29.04.2015 | EE | 29.04.2015 | FI | 29.04.2015 | HR | 29.04.2015 | LT | 29.04.2015 | LV | 29.04.2015 | MC | 29.04.2015 | MT | 29.04.2015 | PL | 29.04.2015 | RO | 29.04.2015 | SE | 29.04.2015 | SI | 29.04.2015 | SK | 29.04.2015 | TR | 29.04.2015 | NO | 29.07.2015 | GR | 30.07.2015 | IS | 29.08.2015 | PT | 31.08.2015 | LU | 26.09.2015 | [2017/39] |
Former [2017/22] | AT | 29.04.2015 | |
CZ | 29.04.2015 | ||
DK | 29.04.2015 | ||
EE | 29.04.2015 | ||
FI | 29.04.2015 | ||
HR | 29.04.2015 | ||
LT | 29.04.2015 | ||
LV | 29.04.2015 | ||
MC | 29.04.2015 | ||
MT | 29.04.2015 | ||
PL | 29.04.2015 | ||
RO | 29.04.2015 | ||
SI | 29.04.2015 | ||
SK | 29.04.2015 | ||
NO | 29.07.2015 | ||
GR | 30.07.2015 | ||
IS | 29.08.2015 | ||
PT | 31.08.2015 | ||
LU | 26.09.2015 | ||
Former [2016/24] | AT | 29.04.2015 | |
CZ | 29.04.2015 | ||
DK | 29.04.2015 | ||
EE | 29.04.2015 | ||
FI | 29.04.2015 | ||
HR | 29.04.2015 | ||
LT | 29.04.2015 | ||
LV | 29.04.2015 | ||
MC | 29.04.2015 | ||
PL | 29.04.2015 | ||
RO | 29.04.2015 | ||
SI | 29.04.2015 | ||
SK | 29.04.2015 | ||
NO | 29.07.2015 | ||
GR | 30.07.2015 | ||
IS | 29.08.2015 | ||
PT | 31.08.2015 | ||
LU | 26.09.2015 | ||
Former [2016/23] | AT | 29.04.2015 | |
CZ | 29.04.2015 | ||
DK | 29.04.2015 | ||
EE | 29.04.2015 | ||
FI | 29.04.2015 | ||
HR | 29.04.2015 | ||
LT | 29.04.2015 | ||
LV | 29.04.2015 | ||
MC | 29.04.2015 | ||
PL | 29.04.2015 | ||
RO | 29.04.2015 | ||
SK | 29.04.2015 | ||
NO | 29.07.2015 | ||
GR | 30.07.2015 | ||
IS | 29.08.2015 | ||
PT | 31.08.2015 | ||
LU | 26.09.2015 | ||
Former [2016/21] | AT | 29.04.2015 | |
CZ | 29.04.2015 | ||
DK | 29.04.2015 | ||
EE | 29.04.2015 | ||
FI | 29.04.2015 | ||
HR | 29.04.2015 | ||
LT | 29.04.2015 | ||
LV | 29.04.2015 | ||
PL | 29.04.2015 | ||
RO | 29.04.2015 | ||
SK | 29.04.2015 | ||
NO | 29.07.2015 | ||
GR | 30.07.2015 | ||
IS | 29.08.2015 | ||
PT | 31.08.2015 | ||
LU | 26.09.2015 | ||
Former [2016/10] | AT | 29.04.2015 | |
CZ | 29.04.2015 | ||
DK | 29.04.2015 | ||
EE | 29.04.2015 | ||
FI | 29.04.2015 | ||
HR | 29.04.2015 | ||
LT | 29.04.2015 | ||
LV | 29.04.2015 | ||
PL | 29.04.2015 | ||
RO | 29.04.2015 | ||
SK | 29.04.2015 | ||
NO | 29.07.2015 | ||
GR | 30.07.2015 | ||
IS | 29.08.2015 | ||
PT | 31.08.2015 | ||
Former [2016/09] | AT | 29.04.2015 | |
DK | 29.04.2015 | ||
EE | 29.04.2015 | ||
FI | 29.04.2015 | ||
HR | 29.04.2015 | ||
LT | 29.04.2015 | ||
LV | 29.04.2015 | ||
NO | 29.07.2015 | ||
GR | 30.07.2015 | ||
IS | 29.08.2015 | ||
PT | 31.08.2015 | ||
Former [2016/07] | AT | 29.04.2015 | |
DK | 29.04.2015 | ||
FI | 29.04.2015 | ||
HR | 29.04.2015 | ||
LT | 29.04.2015 | ||
LV | 29.04.2015 | ||
NO | 29.07.2015 | ||
GR | 30.07.2015 | ||
IS | 29.08.2015 | ||
PT | 31.08.2015 | ||
Former [2015/51] | AT | 29.04.2015 | |
FI | 29.04.2015 | ||
HR | 29.04.2015 | ||
LT | 29.04.2015 | ||
LV | 29.04.2015 | ||
NO | 29.07.2015 | ||
GR | 30.07.2015 | ||
IS | 29.08.2015 | ||
PT | 31.08.2015 | ||
Former [2015/50] | FI | 29.04.2015 | |
HR | 29.04.2015 | ||
LT | 29.04.2015 | ||
LV | 29.04.2015 | ||
NO | 29.07.2015 | ||
GR | 30.07.2015 | ||
IS | 29.08.2015 | ||
PT | 31.08.2015 | ||
Former [2015/49] | FI | 29.04.2015 | |
HR | 29.04.2015 | ||
LT | 29.04.2015 | ||
LV | 29.04.2015 | ||
NO | 29.07.2015 | ||
GR | 30.07.2015 | ||
PT | 31.08.2015 | Documents cited: | Search | [A]US4822362 (WALKER PETER S [US], et al) [A] * abstract ** figure 1 *; | [Y]EP0636352 (BRISTOL MYERS SQUIBB CO [US]) [Y] 1,5,10,11 * column 2, line 43 - column 4, line 13 * * figures 1,2,5 *; | [Y]US6379388 (ENSIGN MICHAEL D [US], et al) [Y] 1,5,10,11 * column 4, line 20 - line 60 * * column 6, line 40 - column 8, line 28 * * figures 3,6,8 *; | [A]US2007203582 (CAMPBELL MICHAEL N [US]) [A] * abstract * * figure 1 * | by applicant | EP0636352 | US6379388 |