EP2071095 - Beam comprising a light weight concrete boom and a partially embedded truss in this boom [Right-click to bookmark this link] | |||
Former [2009/25] | Beam comprising a concrete boom and a partially embedded trush in this boom | ||
[2018/13] | Status | No opposition filed within time limit Status updated on 14.06.2019 Database last updated on 04.06.2024 | |
Former | The patent has been granted Status updated on 06.07.2018 | ||
Former | Grant of patent is intended Status updated on 07.05.2018 | Most recent event Tooltip | 03.07.2020 | Lapse of the patent in a contracting state New state(s): CY | published on 05.08.2020 [2020/32] | Applicant(s) | For all designated states KP1 135, Avenue Pierre Semard MIN Bâtiment D 84000 Avignon / FR | [N/P] |
Former [2009/25] | For all designated states KP1 135, Avenue Pierre Semard, MIN Bâtiment D 84000 Avignon / FR | Inventor(s) | 01 /
Haour, Thierry Chemin des Saules 30650 Rochefort du Gard / FR | 02 /
Pacqueau, Christophe 365 rue Emile Zola 30290 Laudun / FR | 03 /
Rols, Sébastien Chemin de la Queirade 30390 Estezargues / FR | [2009/25] | Representative(s) | Beaudouin-Lafon, Emmanuel, et al Cabinet Boettcher 16, rue Médéric 75017 Paris / FR | [2018/32] |
Former [2009/25] | Beaudouin-Lafon, Emmanuel, et al Cabinet Boettcher 22, rue du Général Foy 75008 Paris / FR | Application number, filing date | 08291138.9 | 03.12.2008 | [2009/25] | Priority number, date | FR20070008679 | 13.12.2007 Original published format: FR 0708679 | [2009/25] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | EP2071095 | Date: | 17.06.2009 | Language: | FR | [2009/25] | Type: | B1 Patent specification | No.: | EP2071095 | Date: | 08.08.2018 | Language: | FR | [2018/32] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 04.03.2009 | Classification | IPC: | E04C3/294, E04C5/065 | [2009/25] | CPC: |
E04C3/294 (EP);
E04C5/0656 (EP)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2018/32] |
Former [2009/25] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR | Title | German: | Balken, der einen Betonuntergurt aus Leichtbeton umfasst und ein Fachwerkgitter, das teilweise in diesen Betonuntergurt eingelassen ist | [2018/13] | English: | Beam comprising a light weight concrete boom and a partially embedded truss in this boom | [2018/13] | French: | Poutre comprenant un talon en béton léger et un treillis partiellement enrobe dans ce talon | [2018/13] |
Former [2009/25] | Balken, der einen Betonuntergurt umfasst und ein Fachwerk, das teilweise in diesen Betonuntergurt eingelassen ist | ||
Former [2009/25] | Beam comprising a concrete boom and a partially embedded trush in this boom | ||
Former [2009/25] | Poutre comprenant un talon en beton et un treillis partiellement enrobe dans ce talon | Examination procedure | 23.11.2009 | Examination requested [2010/01] | 18.12.2009 | Despatch of a communication from the examining division (Time limit: M06) | 15.06.2010 | Reply to a communication from the examining division | 08.05.2018 | Communication of intention to grant the patent | 28.06.2018 | Fee for grant paid | 28.06.2018 | Fee for publishing/printing paid | 28.06.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 18.12.2009 | Opposition(s) | 09.05.2019 | No opposition filed within time limit [2019/29] | Fees paid | Renewal fee | 23.12.2010 | Renewal fee patent year 03 | 23.12.2011 | Renewal fee patent year 04 | 19.12.2012 | Renewal fee patent year 05 | 27.12.2013 | Renewal fee patent year 06 | 22.12.2014 | Renewal fee patent year 07 | 22.12.2015 | Renewal fee patent year 08 | 23.12.2016 | Renewal fee patent year 09 | 21.12.2017 | Renewal fee patent year 10 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 03.12.2008 | AT | 08.08.2018 | CY | 08.08.2018 | CZ | 08.08.2018 | DK | 08.08.2018 | EE | 08.08.2018 | FI | 08.08.2018 | HR | 08.08.2018 | LT | 08.08.2018 | LV | 08.08.2018 | MC | 08.08.2018 | MT | 08.08.2018 | PT | 08.08.2018 | RO | 08.08.2018 | SE | 08.08.2018 | SI | 08.08.2018 | SK | 08.08.2018 | TR | 08.08.2018 | BG | 08.11.2018 | NO | 08.11.2018 | GR | 09.11.2018 | IE | 03.12.2018 | IS | 08.12.2018 | CH | 31.12.2018 | LI | 31.12.2018 | [2020/32] |
Former [2020/30] | HU | 03.12.2008 | |
AT | 08.08.2018 | ||
CZ | 08.08.2018 | ||
DK | 08.08.2018 | ||
EE | 08.08.2018 | ||
FI | 08.08.2018 | ||
HR | 08.08.2018 | ||
LT | 08.08.2018 | ||
LV | 08.08.2018 | ||
MC | 08.08.2018 | ||
MT | 08.08.2018 | ||
PT | 08.08.2018 | ||
RO | 08.08.2018 | ||
SE | 08.08.2018 | ||
SI | 08.08.2018 | ||
SK | 08.08.2018 | ||
TR | 08.08.2018 | ||
BG | 08.11.2018 | ||
NO | 08.11.2018 | ||
GR | 09.11.2018 | ||
IE | 03.12.2018 | ||
IS | 08.12.2018 | ||
CH | 31.12.2018 | ||
LI | 31.12.2018 | ||
Former [2020/27] | AT | 08.08.2018 | |
CZ | 08.08.2018 | ||
DK | 08.08.2018 | ||
EE | 08.08.2018 | ||
FI | 08.08.2018 | ||
HR | 08.08.2018 | ||
LT | 08.08.2018 | ||
LV | 08.08.2018 | ||
MC | 08.08.2018 | ||
MT | 08.08.2018 | ||
PT | 08.08.2018 | ||
RO | 08.08.2018 | ||
SE | 08.08.2018 | ||
SI | 08.08.2018 | ||
SK | 08.08.2018 | ||
TR | 08.08.2018 | ||
BG | 08.11.2018 | ||
NO | 08.11.2018 | ||
GR | 09.11.2018 | ||
IE | 03.12.2018 | ||
IS | 08.12.2018 | ||
CH | 31.12.2018 | ||
LI | 31.12.2018 | ||
Former [2020/16] | AT | 08.08.2018 | |
CZ | 08.08.2018 | ||
DK | 08.08.2018 | ||
EE | 08.08.2018 | ||
FI | 08.08.2018 | ||
HR | 08.08.2018 | ||
LT | 08.08.2018 | ||
LV | 08.08.2018 | ||
MC | 08.08.2018 | ||
MT | 08.08.2018 | ||
RO | 08.08.2018 | ||
SE | 08.08.2018 | ||
SI | 08.08.2018 | ||
SK | 08.08.2018 | ||
TR | 08.08.2018 | ||
BG | 08.11.2018 | ||
NO | 08.11.2018 | ||
GR | 09.11.2018 | ||
IE | 03.12.2018 | ||
IS | 08.12.2018 | ||
CH | 31.12.2018 | ||
LI | 31.12.2018 | ||
Former [2020/08] | AT | 08.08.2018 | |
CZ | 08.08.2018 | ||
DK | 08.08.2018 | ||
EE | 08.08.2018 | ||
FI | 08.08.2018 | ||
HR | 08.08.2018 | ||
LT | 08.08.2018 | ||
LV | 08.08.2018 | ||
MC | 08.08.2018 | ||
MT | 08.08.2018 | ||
RO | 08.08.2018 | ||
SE | 08.08.2018 | ||
SI | 08.08.2018 | ||
SK | 08.08.2018 | ||
BG | 08.11.2018 | ||
NO | 08.11.2018 | ||
GR | 09.11.2018 | ||
IE | 03.12.2018 | ||
IS | 08.12.2018 | ||
CH | 31.12.2018 | ||
LI | 31.12.2018 | ||
Former [2020/04] | AT | 08.08.2018 | |
CZ | 08.08.2018 | ||
DK | 08.08.2018 | ||
EE | 08.08.2018 | ||
FI | 08.08.2018 | ||
HR | 08.08.2018 | ||
LT | 08.08.2018 | ||
LV | 08.08.2018 | ||
MC | 08.08.2018 | ||
RO | 08.08.2018 | ||
SE | 08.08.2018 | ||
SI | 08.08.2018 | ||
SK | 08.08.2018 | ||
BG | 08.11.2018 | ||
NO | 08.11.2018 | ||
GR | 09.11.2018 | ||
IE | 03.12.2018 | ||
IS | 08.12.2018 | ||
CH | 31.12.2018 | ||
LI | 31.12.2018 | ||
Former [2019/48] | AT | 08.08.2018 | |
CZ | 08.08.2018 | ||
DK | 08.08.2018 | ||
EE | 08.08.2018 | ||
FI | 08.08.2018 | ||
HR | 08.08.2018 | ||
LT | 08.08.2018 | ||
LV | 08.08.2018 | ||
MC | 08.08.2018 | ||
RO | 08.08.2018 | ||
SE | 08.08.2018 | ||
SI | 08.08.2018 | ||
SK | 08.08.2018 | ||
BG | 08.11.2018 | ||
NO | 08.11.2018 | ||
GR | 09.11.2018 | ||
IE | 03.12.2018 | ||
IS | 08.12.2018 | ||
Former [2019/40] | AT | 08.08.2018 | |
CZ | 08.08.2018 | ||
DK | 08.08.2018 | ||
EE | 08.08.2018 | ||
FI | 08.08.2018 | ||
HR | 08.08.2018 | ||
LT | 08.08.2018 | ||
LV | 08.08.2018 | ||
MC | 08.08.2018 | ||
RO | 08.08.2018 | ||
SE | 08.08.2018 | ||
SI | 08.08.2018 | ||
SK | 08.08.2018 | ||
BG | 08.11.2018 | ||
NO | 08.11.2018 | ||
GR | 09.11.2018 | ||
IS | 08.12.2018 | ||
Former [2019/37] | AT | 08.08.2018 | |
CZ | 08.08.2018 | ||
DK | 08.08.2018 | ||
EE | 08.08.2018 | ||
FI | 08.08.2018 | ||
HR | 08.08.2018 | ||
LT | 08.08.2018 | ||
LV | 08.08.2018 | ||
RO | 08.08.2018 | ||
SE | 08.08.2018 | ||
SI | 08.08.2018 | ||
SK | 08.08.2018 | ||
BG | 08.11.2018 | ||
NO | 08.11.2018 | ||
GR | 09.11.2018 | ||
IS | 08.12.2018 | ||
Former [2019/26] | AT | 08.08.2018 | |
CZ | 08.08.2018 | ||
DK | 08.08.2018 | ||
EE | 08.08.2018 | ||
FI | 08.08.2018 | ||
HR | 08.08.2018 | ||
LT | 08.08.2018 | ||
LV | 08.08.2018 | ||
RO | 08.08.2018 | ||
SE | 08.08.2018 | ||
SK | 08.08.2018 | ||
BG | 08.11.2018 | ||
NO | 08.11.2018 | ||
GR | 09.11.2018 | ||
IS | 08.12.2018 | ||
Former [2019/24] | AT | 08.08.2018 | |
CZ | 08.08.2018 | ||
EE | 08.08.2018 | ||
FI | 08.08.2018 | ||
HR | 08.08.2018 | ||
LT | 08.08.2018 | ||
LV | 08.08.2018 | ||
RO | 08.08.2018 | ||
SE | 08.08.2018 | ||
SK | 08.08.2018 | ||
BG | 08.11.2018 | ||
NO | 08.11.2018 | ||
GR | 09.11.2018 | ||
IS | 08.12.2018 | ||
Former [2019/22] | AT | 08.08.2018 | |
CZ | 08.08.2018 | ||
FI | 08.08.2018 | ||
HR | 08.08.2018 | ||
LT | 08.08.2018 | ||
LV | 08.08.2018 | ||
RO | 08.08.2018 | ||
SE | 08.08.2018 | ||
BG | 08.11.2018 | ||
NO | 08.11.2018 | ||
GR | 09.11.2018 | ||
IS | 08.12.2018 | ||
Former [2019/12] | AT | 08.08.2018 | |
FI | 08.08.2018 | ||
HR | 08.08.2018 | ||
LT | 08.08.2018 | ||
LV | 08.08.2018 | ||
SE | 08.08.2018 | ||
BG | 08.11.2018 | ||
NO | 08.11.2018 | ||
GR | 09.11.2018 | ||
IS | 08.12.2018 | ||
Former [2019/11] | AT | 08.08.2018 | |
FI | 08.08.2018 | ||
HR | 08.08.2018 | ||
LT | 08.08.2018 | ||
SE | 08.08.2018 | ||
BG | 08.11.2018 | ||
NO | 08.11.2018 | ||
GR | 09.11.2018 | ||
IS | 08.12.2018 | ||
Former [2019/10] | AT | 08.08.2018 | |
FI | 08.08.2018 | ||
LT | 08.08.2018 | ||
SE | 08.08.2018 | ||
BG | 08.11.2018 | ||
NO | 08.11.2018 | ||
GR | 09.11.2018 | ||
IS | 08.12.2018 | ||
Former [2019/08] | FI | 08.08.2018 | |
LT | 08.08.2018 | ||
NO | 08.11.2018 | ||
IS | 08.12.2018 | ||
Former [2019/07] | LT | 08.08.2018 | Documents cited: | Search | [X]FR2540540 (PERRAZ GUY [FR]) [X] 1,3,6 * page 2, line 23 - line 32 * * page 3, line 36 - page 4, line 2 * * page 4, line 11 - line 15 * * page 4, line 21 - line 29; figures 1-3; claims 1,2 *; | [X]EP0011555 (CERIB [FR]) [X] 1,3,6 * page 3, line 14 - line 30 * * page 4, line 13 - line 24; figures 1-3; claims 1-6 *; | [X]FR2534298 (JOANNES ANDRE [FR]) [X] 1,3,6 * the whole document *; | [A]DE1193224 (RHEINBAU GMBH) [A] 1-7 * the whole document *; | [A]FR2761389 (CALZIA RENE [FR]) [A] 1-7 * the whole document * | Examination | EP0136213 | by applicant | FR2862994 |