blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2071095

EP2071095 - Beam comprising a light weight concrete boom and a partially embedded truss in this boom [Right-click to bookmark this link]
Former [2009/25]Beam comprising a concrete boom and a partially embedded trush in this boom
[2018/13]
StatusNo opposition filed within time limit
Status updated on  14.06.2019
Database last updated on 04.06.2024
FormerThe patent has been granted
Status updated on  06.07.2018
FormerGrant of patent is intended
Status updated on  07.05.2018
Most recent event   Tooltip03.07.2020Lapse of the patent in a contracting state
New state(s): CY
published on 05.08.2020  [2020/32]
Applicant(s)For all designated states
KP1
135, Avenue Pierre Semard
MIN Bâtiment D
84000 Avignon / FR
[N/P]
Former [2009/25]For all designated states
KP1
135, Avenue Pierre Semard, MIN Bâtiment D
84000 Avignon / FR
Inventor(s)01 / Haour, Thierry
Chemin des Saules
30650 Rochefort du Gard / FR
02 / Pacqueau, Christophe
365 rue Emile Zola
30290 Laudun / FR
03 / Rols, Sébastien
Chemin de la Queirade
30390 Estezargues / FR
 [2009/25]
Representative(s)Beaudouin-Lafon, Emmanuel, et al
Cabinet Boettcher 16, rue Médéric
75017 Paris / FR
[2018/32]
Former [2009/25]Beaudouin-Lafon, Emmanuel, et al
Cabinet Boettcher 22, rue du Général Foy
75008 Paris / FR
Application number, filing date08291138.903.12.2008
[2009/25]
Priority number, dateFR2007000867913.12.2007         Original published format: FR 0708679
[2009/25]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report 
No.:EP2071095
Date:17.06.2009
Language:FR
[2009/25]
Type: B1 Patent specification 
No.:EP2071095
Date:08.08.2018
Language:FR
[2018/32]
Search report(s)(Supplementary) European search report - dispatched on:EP04.03.2009
ClassificationIPC:E04C3/294, E04C5/065
[2009/25]
CPC:
E04C3/294 (EP); E04C5/0656 (EP)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MT,   NL,   NO,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2018/32]
Former [2009/25]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MT,  NL,  NO,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
TitleGerman:Balken, der einen Betonuntergurt aus Leichtbeton umfasst und ein Fachwerkgitter, das teilweise in diesen Betonuntergurt eingelassen ist[2018/13]
English:Beam comprising a light weight concrete boom and a partially embedded truss in this boom[2018/13]
French:Poutre comprenant un talon en béton léger et un treillis partiellement enrobe dans ce talon[2018/13]
Former [2009/25]Balken, der einen Betonuntergurt umfasst und ein Fachwerk, das teilweise in diesen Betonuntergurt eingelassen ist
Former [2009/25]Beam comprising a concrete boom and a partially embedded trush in this boom
Former [2009/25]Poutre comprenant un talon en beton et un treillis partiellement enrobe dans ce talon
Examination procedure23.11.2009Examination requested  [2010/01]
18.12.2009Despatch of a communication from the examining division (Time limit: M06)
15.06.2010Reply to a communication from the examining division
08.05.2018Communication of intention to grant the patent
28.06.2018Fee for grant paid
28.06.2018Fee for publishing/printing paid
28.06.2018Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  18.12.2009
Opposition(s)09.05.2019No opposition filed within time limit [2019/29]
Fees paidRenewal fee
23.12.2010Renewal fee patent year 03
23.12.2011Renewal fee patent year 04
19.12.2012Renewal fee patent year 05
27.12.2013Renewal fee patent year 06
22.12.2014Renewal fee patent year 07
22.12.2015Renewal fee patent year 08
23.12.2016Renewal fee patent year 09
21.12.2017Renewal fee patent year 10
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU03.12.2008
AT08.08.2018
CY08.08.2018
CZ08.08.2018
DK08.08.2018
EE08.08.2018
FI08.08.2018
HR08.08.2018
LT08.08.2018
LV08.08.2018
MC08.08.2018
MT08.08.2018
PT08.08.2018
RO08.08.2018
SE08.08.2018
SI08.08.2018
SK08.08.2018
TR08.08.2018
BG08.11.2018
NO08.11.2018
GR09.11.2018
IE03.12.2018
IS08.12.2018
CH31.12.2018
LI31.12.2018
[2020/32]
Former [2020/30]HU03.12.2008
AT08.08.2018
CZ08.08.2018
DK08.08.2018
EE08.08.2018
FI08.08.2018
HR08.08.2018
LT08.08.2018
LV08.08.2018
MC08.08.2018
MT08.08.2018
PT08.08.2018
RO08.08.2018
SE08.08.2018
SI08.08.2018
SK08.08.2018
TR08.08.2018
BG08.11.2018
NO08.11.2018
GR09.11.2018
IE03.12.2018
IS08.12.2018
CH31.12.2018
LI31.12.2018
Former [2020/27]AT08.08.2018
CZ08.08.2018
DK08.08.2018
EE08.08.2018
FI08.08.2018
HR08.08.2018
LT08.08.2018
LV08.08.2018
MC08.08.2018
MT08.08.2018
PT08.08.2018
RO08.08.2018
SE08.08.2018
SI08.08.2018
SK08.08.2018
TR08.08.2018
BG08.11.2018
NO08.11.2018
GR09.11.2018
IE03.12.2018
IS08.12.2018
CH31.12.2018
LI31.12.2018
Former [2020/16]AT08.08.2018
CZ08.08.2018
DK08.08.2018
EE08.08.2018
FI08.08.2018
HR08.08.2018
LT08.08.2018
LV08.08.2018
MC08.08.2018
MT08.08.2018
RO08.08.2018
SE08.08.2018
SI08.08.2018
SK08.08.2018
TR08.08.2018
BG08.11.2018
NO08.11.2018
GR09.11.2018
IE03.12.2018
IS08.12.2018
CH31.12.2018
LI31.12.2018
Former [2020/08]AT08.08.2018
CZ08.08.2018
DK08.08.2018
EE08.08.2018
FI08.08.2018
HR08.08.2018
LT08.08.2018
LV08.08.2018
MC08.08.2018
MT08.08.2018
RO08.08.2018
SE08.08.2018
SI08.08.2018
SK08.08.2018
BG08.11.2018
NO08.11.2018
GR09.11.2018
IE03.12.2018
IS08.12.2018
CH31.12.2018
LI31.12.2018
Former [2020/04]AT08.08.2018
CZ08.08.2018
DK08.08.2018
EE08.08.2018
FI08.08.2018
HR08.08.2018
LT08.08.2018
LV08.08.2018
MC08.08.2018
RO08.08.2018
SE08.08.2018
SI08.08.2018
SK08.08.2018
BG08.11.2018
NO08.11.2018
GR09.11.2018
IE03.12.2018
IS08.12.2018
CH31.12.2018
LI31.12.2018
Former [2019/48]AT08.08.2018
CZ08.08.2018
DK08.08.2018
EE08.08.2018
FI08.08.2018
HR08.08.2018
LT08.08.2018
LV08.08.2018
MC08.08.2018
RO08.08.2018
SE08.08.2018
SI08.08.2018
SK08.08.2018
BG08.11.2018
NO08.11.2018
GR09.11.2018
IE03.12.2018
IS08.12.2018
Former [2019/40]AT08.08.2018
CZ08.08.2018
DK08.08.2018
EE08.08.2018
FI08.08.2018
HR08.08.2018
LT08.08.2018
LV08.08.2018
MC08.08.2018
RO08.08.2018
SE08.08.2018
SI08.08.2018
SK08.08.2018
BG08.11.2018
NO08.11.2018
GR09.11.2018
IS08.12.2018
Former [2019/37]AT08.08.2018
CZ08.08.2018
DK08.08.2018
EE08.08.2018
FI08.08.2018
HR08.08.2018
LT08.08.2018
LV08.08.2018
RO08.08.2018
SE08.08.2018
SI08.08.2018
SK08.08.2018
BG08.11.2018
NO08.11.2018
GR09.11.2018
IS08.12.2018
Former [2019/26]AT08.08.2018
CZ08.08.2018
DK08.08.2018
EE08.08.2018
FI08.08.2018
HR08.08.2018
LT08.08.2018
LV08.08.2018
RO08.08.2018
SE08.08.2018
SK08.08.2018
BG08.11.2018
NO08.11.2018
GR09.11.2018
IS08.12.2018
Former [2019/24]AT08.08.2018
CZ08.08.2018
EE08.08.2018
FI08.08.2018
HR08.08.2018
LT08.08.2018
LV08.08.2018
RO08.08.2018
SE08.08.2018
SK08.08.2018
BG08.11.2018
NO08.11.2018
GR09.11.2018
IS08.12.2018
Former [2019/22]AT08.08.2018
CZ08.08.2018
FI08.08.2018
HR08.08.2018
LT08.08.2018
LV08.08.2018
RO08.08.2018
SE08.08.2018
BG08.11.2018
NO08.11.2018
GR09.11.2018
IS08.12.2018
Former [2019/12]AT08.08.2018
FI08.08.2018
HR08.08.2018
LT08.08.2018
LV08.08.2018
SE08.08.2018
BG08.11.2018
NO08.11.2018
GR09.11.2018
IS08.12.2018
Former [2019/11]AT08.08.2018
FI08.08.2018
HR08.08.2018
LT08.08.2018
SE08.08.2018
BG08.11.2018
NO08.11.2018
GR09.11.2018
IS08.12.2018
Former [2019/10]AT08.08.2018
FI08.08.2018
LT08.08.2018
SE08.08.2018
BG08.11.2018
NO08.11.2018
GR09.11.2018
IS08.12.2018
Former [2019/08]FI08.08.2018
LT08.08.2018
NO08.11.2018
IS08.12.2018
Former [2019/07]LT08.08.2018
Documents cited:Search[X]FR2540540  (PERRAZ GUY [FR]) [X] 1,3,6 * page 2, line 23 - line 32 * * page 3, line 36 - page 4, line 2 * * page 4, line 11 - line 15 * * page 4, line 21 - line 29; figures 1-3; claims 1,2 *;
 [X]EP0011555  (CERIB [FR]) [X] 1,3,6 * page 3, line 14 - line 30 * * page 4, line 13 - line 24; figures 1-3; claims 1-6 *;
 [X]FR2534298  (JOANNES ANDRE [FR]) [X] 1,3,6 * the whole document *;
 [A]DE1193224  (RHEINBAU GMBH) [A] 1-7 * the whole document *;
 [A]FR2761389  (CALZIA RENE [FR]) [A] 1-7 * the whole document *
ExaminationEP0136213
by applicantFR2862994
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.