EP2003256 - Case for a water conveyance metering assembly [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 01.02.2019 Database last updated on 26.06.2024 | |
Former | The patent has been granted Status updated on 23.02.2018 | ||
Former | Grant of patent is intended Status updated on 17.10.2017 | Most recent event Tooltip | 10.07.2020 | Lapse of the patent in a contracting state New state(s): IS | published on 12.08.2020 [2020/33] | Applicant(s) | For all designated states SAINTE LIZAIGNE SA 47 Rue de l'Usine 36260 Sainte Lizaigne / FR | [2009/42] |
Former [2008/51] | For all designated states SAINTE LIZAIGNE SA 52 Rue d'Anjou 75008 PARIS / FR | Inventor(s) | 01 /
Verhee, Damien 4 Rue Saragosse 36100 Issoudun / FR | [2008/51] | Representative(s) | Jacobacci Coralis Harle 32, rue de l'Arcade 75008 Paris / FR | [2018/13] |
Former [2008/51] | Catherine, Alain, et al Cabinet Harlé & Phélip 7 rue de Madrid 75008 Paris / FR | Application number, filing date | 08305247.2 | 11.06.2008 | [2008/51] | Priority number, date | FR20070055748 | 13.06.2007 Original published format: FR 0755748 | [2008/51] | Filing language | FR | Procedural language | FR | Publication | Type: | A2 Application without search report | No.: | EP2003256 | Date: | 17.12.2008 | Language: | FR | [2008/51] | Type: | A3 Search report | No.: | EP2003256 | Date: | 26.12.2012 | Language: | FR | [2012/52] | Type: | B1 Patent specification | No.: | EP2003256 | Date: | 28.03.2018 | Language: | FR | [2018/13] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 26.11.2012 | Classification | IPC: | E03B7/07, G01F15/14, G01F15/18, H02B1/03, E03B9/08, E03B7/09 | [2012/52] | CPC: |
E03B7/072 (EP);
E03B7/095 (EP);
E03B9/08 (EP);
G01F15/14 (EP);
G01F15/18 (EP)
|
Former IPC [2008/51] | E03B7/07, G01F15/14, G01F15/18, H02B1/03 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2013/29] |
Former [2013/28] | AT, BE, BG, CH, CY, LI | ||
Former [2008/51] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR | Title | German: | Gehäuse für Zählereinheit der Wasserzuführung | [2008/51] | English: | Case for a water conveyance metering assembly | [2008/51] | French: | Boitier pour ensemble de comptage d'adduction d'eau | [2008/51] | Examination procedure | 28.05.2013 | Amendment by applicant (claims and/or description) | 28.05.2013 | Examination requested [2013/28] | 18.10.2017 | Communication of intention to grant the patent | 15.02.2018 | Fee for grant paid | 15.02.2018 | Fee for publishing/printing paid | 15.02.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 18.10.2017 | Opposition(s) | 03.01.2019 | No opposition filed within time limit [2019/10] | Fees paid | Renewal fee | 02.04.2010 | Renewal fee patent year 03 | 01.04.2011 | Renewal fee patent year 04 | 31.03.2012 | Renewal fee patent year 05 | 16.04.2013 | Renewal fee patent year 06 | 31.03.2014 | Renewal fee patent year 07 | 02.04.2015 | Renewal fee patent year 08 | 31.03.2016 | Renewal fee patent year 09 | 04.04.2017 | Renewal fee patent year 10 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 11.06.2008 | AT | 28.03.2018 | CY | 28.03.2018 | DK | 28.03.2018 | EE | 28.03.2018 | ES | 28.03.2018 | FI | 28.03.2018 | HR | 28.03.2018 | IT | 28.03.2018 | LT | 28.03.2018 | LV | 28.03.2018 | MC | 28.03.2018 | MT | 28.03.2018 | NL | 28.03.2018 | PL | 28.03.2018 | SE | 28.03.2018 | SI | 28.03.2018 | SK | 28.03.2018 | TR | 28.03.2018 | IE | 11.06.2018 | LU | 11.06.2018 | BG | 28.06.2018 | GB | 28.06.2018 | NO | 28.06.2018 | GR | 29.06.2018 | BE | 30.06.2018 | CH | 30.06.2018 | LI | 30.06.2018 | IS | 28.07.2018 | PT | 30.07.2018 | DE | 01.01.2019 | [2020/33] |
Former [2020/31] | HU | 11.06.2008 | |
AT | 28.03.2018 | ||
CY | 28.03.2018 | ||
DK | 28.03.2018 | ||
EE | 28.03.2018 | ||
ES | 28.03.2018 | ||
FI | 28.03.2018 | ||
HR | 28.03.2018 | ||
IT | 28.03.2018 | ||
LT | 28.03.2018 | ||
LV | 28.03.2018 | ||
MC | 28.03.2018 | ||
MT | 28.03.2018 | ||
NL | 28.03.2018 | ||
PL | 28.03.2018 | ||
SE | 28.03.2018 | ||
SI | 28.03.2018 | ||
SK | 28.03.2018 | ||
TR | 28.03.2018 | ||
IE | 11.06.2018 | ||
LU | 11.06.2018 | ||
BG | 28.06.2018 | ||
GB | 28.06.2018 | ||
NO | 28.06.2018 | ||
GR | 29.06.2018 | ||
BE | 30.06.2018 | ||
CH | 30.06.2018 | ||
LI | 30.06.2018 | ||
PT | 30.07.2018 | ||
DE | 01.01.2019 | ||
Former [2020/28] | HU | 11.06.2008 | |
AT | 28.03.2018 | ||
DK | 28.03.2018 | ||
EE | 28.03.2018 | ||
ES | 28.03.2018 | ||
FI | 28.03.2018 | ||
HR | 28.03.2018 | ||
IT | 28.03.2018 | ||
LT | 28.03.2018 | ||
LV | 28.03.2018 | ||
MC | 28.03.2018 | ||
MT | 28.03.2018 | ||
NL | 28.03.2018 | ||
PL | 28.03.2018 | ||
SE | 28.03.2018 | ||
SI | 28.03.2018 | ||
SK | 28.03.2018 | ||
TR | 28.03.2018 | ||
IE | 11.06.2018 | ||
LU | 11.06.2018 | ||
BG | 28.06.2018 | ||
GB | 28.06.2018 | ||
NO | 28.06.2018 | ||
GR | 29.06.2018 | ||
BE | 30.06.2018 | ||
CH | 30.06.2018 | ||
LI | 30.06.2018 | ||
PT | 30.07.2018 | ||
DE | 01.01.2019 | ||
Former [2020/16] | AT | 28.03.2018 | |
DK | 28.03.2018 | ||
EE | 28.03.2018 | ||
ES | 28.03.2018 | ||
FI | 28.03.2018 | ||
HR | 28.03.2018 | ||
IT | 28.03.2018 | ||
LT | 28.03.2018 | ||
LV | 28.03.2018 | ||
MC | 28.03.2018 | ||
MT | 28.03.2018 | ||
NL | 28.03.2018 | ||
PL | 28.03.2018 | ||
SE | 28.03.2018 | ||
SI | 28.03.2018 | ||
SK | 28.03.2018 | ||
TR | 28.03.2018 | ||
IE | 11.06.2018 | ||
LU | 11.06.2018 | ||
BG | 28.06.2018 | ||
GB | 28.06.2018 | ||
NO | 28.06.2018 | ||
GR | 29.06.2018 | ||
BE | 30.06.2018 | ||
CH | 30.06.2018 | ||
LI | 30.06.2018 | ||
PT | 30.07.2018 | ||
DE | 01.01.2019 | ||
Former [2019/26] | AT | 28.03.2018 | |
DK | 28.03.2018 | ||
EE | 28.03.2018 | ||
ES | 28.03.2018 | ||
FI | 28.03.2018 | ||
HR | 28.03.2018 | ||
IT | 28.03.2018 | ||
LT | 28.03.2018 | ||
LV | 28.03.2018 | ||
MC | 28.03.2018 | ||
MT | 28.03.2018 | ||
NL | 28.03.2018 | ||
PL | 28.03.2018 | ||
SE | 28.03.2018 | ||
SI | 28.03.2018 | ||
SK | 28.03.2018 | ||
IE | 11.06.2018 | ||
LU | 11.06.2018 | ||
BG | 28.06.2018 | ||
GB | 28.06.2018 | ||
NO | 28.06.2018 | ||
GR | 29.06.2018 | ||
BE | 30.06.2018 | ||
CH | 30.06.2018 | ||
LI | 30.06.2018 | ||
PT | 30.07.2018 | ||
DE | 01.01.2019 | ||
Former [2019/24] | AT | 28.03.2018 | |
DK | 28.03.2018 | ||
EE | 28.03.2018 | ||
ES | 28.03.2018 | ||
FI | 28.03.2018 | ||
HR | 28.03.2018 | ||
IT | 28.03.2018 | ||
LT | 28.03.2018 | ||
LV | 28.03.2018 | ||
MC | 28.03.2018 | ||
MT | 28.03.2018 | ||
NL | 28.03.2018 | ||
PL | 28.03.2018 | ||
SE | 28.03.2018 | ||
SK | 28.03.2018 | ||
IE | 11.06.2018 | ||
LU | 11.06.2018 | ||
BG | 28.06.2018 | ||
GB | 28.06.2018 | ||
NO | 28.06.2018 | ||
GR | 29.06.2018 | ||
BE | 30.06.2018 | ||
CH | 30.06.2018 | ||
LI | 30.06.2018 | ||
PT | 30.07.2018 | ||
DE | 01.01.2019 | ||
Former [2019/21] | AT | 28.03.2018 | |
DK | 28.03.2018 | ||
EE | 28.03.2018 | ||
ES | 28.03.2018 | ||
FI | 28.03.2018 | ||
HR | 28.03.2018 | ||
IT | 28.03.2018 | ||
LT | 28.03.2018 | ||
LV | 28.03.2018 | ||
MC | 28.03.2018 | ||
MT | 28.03.2018 | ||
NL | 28.03.2018 | ||
PL | 28.03.2018 | ||
SE | 28.03.2018 | ||
SK | 28.03.2018 | ||
IE | 11.06.2018 | ||
LU | 11.06.2018 | ||
BG | 28.06.2018 | ||
GB | 28.06.2018 | ||
NO | 28.06.2018 | ||
GR | 29.06.2018 | ||
CH | 30.06.2018 | ||
LI | 30.06.2018 | ||
PT | 30.07.2018 | ||
DE | 01.01.2019 | ||
Former [2019/19] | AT | 28.03.2018 | |
DK | 28.03.2018 | ||
EE | 28.03.2018 | ||
ES | 28.03.2018 | ||
FI | 28.03.2018 | ||
HR | 28.03.2018 | ||
IT | 28.03.2018 | ||
LT | 28.03.2018 | ||
LV | 28.03.2018 | ||
MC | 28.03.2018 | ||
MT | 28.03.2018 | ||
NL | 28.03.2018 | ||
PL | 28.03.2018 | ||
SE | 28.03.2018 | ||
SK | 28.03.2018 | ||
IE | 11.06.2018 | ||
LU | 11.06.2018 | ||
BG | 28.06.2018 | ||
NO | 28.06.2018 | ||
GR | 29.06.2018 | ||
PT | 30.07.2018 | ||
Former [2019/17] | AT | 28.03.2018 | |
DK | 28.03.2018 | ||
EE | 28.03.2018 | ||
ES | 28.03.2018 | ||
FI | 28.03.2018 | ||
HR | 28.03.2018 | ||
IT | 28.03.2018 | ||
LT | 28.03.2018 | ||
LV | 28.03.2018 | ||
MC | 28.03.2018 | ||
MT | 28.03.2018 | ||
NL | 28.03.2018 | ||
PL | 28.03.2018 | ||
SE | 28.03.2018 | ||
SK | 28.03.2018 | ||
LU | 11.06.2018 | ||
BG | 28.06.2018 | ||
NO | 28.06.2018 | ||
GR | 29.06.2018 | ||
PT | 30.07.2018 | ||
Former [2019/15] | AT | 28.03.2018 | |
DK | 28.03.2018 | ||
EE | 28.03.2018 | ||
ES | 28.03.2018 | ||
FI | 28.03.2018 | ||
HR | 28.03.2018 | ||
IT | 28.03.2018 | ||
LT | 28.03.2018 | ||
LV | 28.03.2018 | ||
MC | 28.03.2018 | ||
MT | 28.03.2018 | ||
NL | 28.03.2018 | ||
PL | 28.03.2018 | ||
SE | 28.03.2018 | ||
SK | 28.03.2018 | ||
BG | 28.06.2018 | ||
NO | 28.06.2018 | ||
GR | 29.06.2018 | ||
PT | 30.07.2018 | ||
Former [2019/10] | AT | 28.03.2018 | |
DK | 28.03.2018 | ||
EE | 28.03.2018 | ||
ES | 28.03.2018 | ||
FI | 28.03.2018 | ||
HR | 28.03.2018 | ||
IT | 28.03.2018 | ||
LT | 28.03.2018 | ||
LV | 28.03.2018 | ||
MT | 28.03.2018 | ||
NL | 28.03.2018 | ||
PL | 28.03.2018 | ||
SE | 28.03.2018 | ||
SK | 28.03.2018 | ||
BG | 28.06.2018 | ||
NO | 28.06.2018 | ||
GR | 29.06.2018 | ||
PT | 30.07.2018 | ||
Former [2019/08] | DK | 28.03.2018 | |
EE | 28.03.2018 | ||
ES | 28.03.2018 | ||
FI | 28.03.2018 | ||
HR | 28.03.2018 | ||
IT | 28.03.2018 | ||
LT | 28.03.2018 | ||
LV | 28.03.2018 | ||
MT | 28.03.2018 | ||
NL | 28.03.2018 | ||
PL | 28.03.2018 | ||
SE | 28.03.2018 | ||
SK | 28.03.2018 | ||
BG | 28.06.2018 | ||
NO | 28.06.2018 | ||
GR | 29.06.2018 | ||
PT | 30.07.2018 | ||
Former [2019/03] | EE | 28.03.2018 | |
ES | 28.03.2018 | ||
FI | 28.03.2018 | ||
HR | 28.03.2018 | ||
IT | 28.03.2018 | ||
LT | 28.03.2018 | ||
LV | 28.03.2018 | ||
MT | 28.03.2018 | ||
NL | 28.03.2018 | ||
PL | 28.03.2018 | ||
SE | 28.03.2018 | ||
SK | 28.03.2018 | ||
BG | 28.06.2018 | ||
NO | 28.06.2018 | ||
GR | 29.06.2018 | ||
PT | 30.07.2018 | ||
Former [2018/50] | EE | 28.03.2018 | |
ES | 28.03.2018 | ||
FI | 28.03.2018 | ||
HR | 28.03.2018 | ||
IT | 28.03.2018 | ||
LT | 28.03.2018 | ||
LV | 28.03.2018 | ||
MT | 28.03.2018 | ||
NL | 28.03.2018 | ||
PL | 28.03.2018 | ||
SE | 28.03.2018 | ||
SK | 28.03.2018 | ||
BG | 28.06.2018 | ||
NO | 28.06.2018 | ||
GR | 29.06.2018 | ||
Former [2018/49] | EE | 28.03.2018 | |
ES | 28.03.2018 | ||
FI | 28.03.2018 | ||
HR | 28.03.2018 | ||
IT | 28.03.2018 | ||
LT | 28.03.2018 | ||
LV | 28.03.2018 | ||
MT | 28.03.2018 | ||
NL | 28.03.2018 | ||
PL | 28.03.2018 | ||
SE | 28.03.2018 | ||
BG | 28.06.2018 | ||
NO | 28.06.2018 | ||
GR | 29.06.2018 | ||
Former [2018/47] | ES | 28.03.2018 | |
FI | 28.03.2018 | ||
HR | 28.03.2018 | ||
IT | 28.03.2018 | ||
LT | 28.03.2018 | ||
LV | 28.03.2018 | ||
MT | 28.03.2018 | ||
NL | 28.03.2018 | ||
SE | 28.03.2018 | ||
BG | 28.06.2018 | ||
NO | 28.06.2018 | ||
GR | 29.06.2018 | ||
Former [2018/45] | FI | 28.03.2018 | |
HR | 28.03.2018 | ||
LT | 28.03.2018 | ||
LV | 28.03.2018 | ||
MT | 28.03.2018 | ||
NL | 28.03.2018 | ||
SE | 28.03.2018 | ||
BG | 28.06.2018 | ||
NO | 28.06.2018 | ||
GR | 29.06.2018 | ||
Former [2018/43] | FI | 28.03.2018 | |
HR | 28.03.2018 | ||
LT | 28.03.2018 | ||
LV | 28.03.2018 | ||
MT | 28.03.2018 | ||
SE | 28.03.2018 | ||
BG | 28.06.2018 | ||
NO | 28.06.2018 | ||
GR | 29.06.2018 | ||
Former [2018/40] | FI | 28.03.2018 | |
HR | 28.03.2018 | ||
LT | 28.03.2018 | ||
LV | 28.03.2018 | ||
SE | 28.03.2018 | ||
BG | 28.06.2018 | ||
NO | 28.06.2018 | ||
GR | 29.06.2018 | ||
Former [2018/35] | FI | 28.03.2018 | |
HR | 28.03.2018 | ||
LT | 28.03.2018 | ||
NO | 28.06.2018 | Documents cited: | Search | [A]EP0653610 (ATLANTIC PLASTICS LTD [GB]) [A] 1 * column 2, line 33 - column 4, line 19 * * column 4, line 49 - line 50 * * column 5, line 7 - line 8 *; | [A]FR2800401 (SAINTE LIZAIGNE SA [FR]) [A] 1 * figures 3,12,13 * * page 6, line 32 * * page 7, line 10 *; | [A]FR2798182 (SAINTE LIZAIGNE SA [FR]) [A] 1 * figures 3,5-7 *; | [A]GB2244812 (EVANS GERALD J) [A] 1 * figures 1,3-6 * * page 1, line 20 - page 3, line 4 * * page 10, line 9 - line 12 * * page 12, line 4 - line 26 *; | [A]GB2354569 (BROWNING ALAN [GB]) [A] 1 * the whole document *; | [A]GB2186338 (SMITH DAVID TREVOR) [A] 1 * figure - * |