EP2232722 - METHOD AND ARRANGEMENT FOR HANDLING A RADIO RECEIVER IN A WIRELESS COMMUNICATION NETWORK [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 27.04.2018 Database last updated on 26.07.2024 | |
Former | The patent has been granted Status updated on 19.05.2017 | ||
Former | Grant of patent is intended Status updated on 05.04.2017 | Most recent event Tooltip | 26.06.2020 | Lapse of the patent in a contracting state New state(s): CY | published on 29.07.2020 [2020/31] | Applicant(s) | For all designated states Telefonaktiebolaget LM Ericsson (publ) 164 83 Stockholm / SE | [2017/25] |
Former [2010/39] | For all designated states Telefonaktiebolaget LM Ericsson (publ) 164 83 Stockholm / SE | Inventor(s) | 01 /
KAZMI, Muhammad Svartviksslingan 110 3 tr S-SE-167 39 Bromma / SE | [2017/25] |
Former [2010/39] | 01 /
KAZMI, Muhammad Svartviksslingan 110 3 tr S-SE-167 39 Bromma / SE | Representative(s) | Ericsson Patent Development Torshamnsgatan 21-23 164 80 Stockholm / SE | [2017/25] |
Former [2010/39] | Kühn, Friedrich Heinrich, et al Ericsson AB Patent Unit LTE Torshamnsgatan 23 164 80 Stockholm / SE | Application number, filing date | 08705324.5 | 17.01.2008 | [2010/39] | WO2008SE50052 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2009091303 | Date: | 23.07.2009 | Language: | EN | [2009/30] | Type: | A1 Application with search report | No.: | EP2232722 | Date: | 29.09.2010 | Language: | EN | The application published by WIPO in one of the EPO official languages on 23.07.2009 takes the place of the publication of the European patent application. | [2010/39] | Type: | B1 Patent specification | No.: | EP2232722 | Date: | 21.06.2017 | Language: | EN | [2017/25] | Search report(s) | International search report - published on: | SE | 23.07.2009 | (Supplementary) European search report - dispatched on: | EP | 18.05.2015 | Classification | IPC: | H04W52/02, H04W76/04 | [2015/25] | CPC: |
H04W52/0261 (EP,US);
G08C17/00 (EP,US);
H04L1/00 (US);
H04W76/28 (EP,US);
Y02D30/70 (EP,US)
|
Former IPC [2010/49] | H04B7/005, H04B1/16, H04W88/02 | ||
Former IPC [2010/39] | H04B7/005, H04B1/16 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2017/25] |
Former [2010/39] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR | Title | German: | VERFAHREN UND ANORDNUNG ZUM UMGANG MIT EINEM FUNKEMPFÄNGER IN EINEM DRAHTLOSEN KOMMUNIKATIONSNETZ | [2010/39] | English: | METHOD AND ARRANGEMENT FOR HANDLING A RADIO RECEIVER IN A WIRELESS COMMUNICATION NETWORK | [2010/39] | French: | PROCÉDÉ ET AGENCEMENT POUR GÉRER UN RÉCEPTEUR RADIO DANS UN RÉSEAU DE COMMUNICATION SANS FIL | [2010/39] | Entry into regional phase | 14.07.2010 | National basic fee paid | 14.07.2010 | Search fee paid | 14.07.2010 | Designation fee(s) paid | 14.07.2010 | Examination fee paid | Examination procedure | 08.10.2009 | Request for preliminary examination filed International Preliminary Examining Authority: SE | 14.07.2010 | Examination requested [2010/39] | 13.11.2015 | Amendment by applicant (claims and/or description) | 06.04.2017 | Communication of intention to grant the patent | 15.05.2017 | Fee for grant paid | 15.05.2017 | Fee for publishing/printing paid | 15.05.2017 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 06.04.2017 | Opposition(s) | 22.03.2018 | No opposition filed within time limit [2018/22] | Fees paid | Renewal fee | 25.05.2010 | Renewal fee patent year 03 | 25.01.2011 | Renewal fee patent year 04 | 25.01.2012 | Renewal fee patent year 05 | 25.01.2013 | Renewal fee patent year 06 | 27.01.2014 | Renewal fee patent year 07 | 27.01.2015 | Renewal fee patent year 08 | 27.01.2016 | Renewal fee patent year 09 | 27.01.2017 | Renewal fee patent year 10 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 17.01.2008 | AT | 21.06.2017 | CY | 21.06.2017 | CZ | 21.06.2017 | DK | 21.06.2017 | EE | 21.06.2017 | ES | 21.06.2017 | FI | 21.06.2017 | HR | 21.06.2017 | IT | 21.06.2017 | LT | 21.06.2017 | LV | 21.06.2017 | MC | 21.06.2017 | PL | 21.06.2017 | PT | 21.06.2017 | RO | 21.06.2017 | SE | 21.06.2017 | SI | 21.06.2017 | SK | 21.06.2017 | TR | 21.06.2017 | BG | 21.09.2017 | NO | 21.09.2017 | GR | 22.09.2017 | IS | 21.10.2017 | IE | 17.01.2018 | LU | 17.01.2018 | MT | 17.01.2018 | BE | 31.01.2018 | CH | 31.01.2018 | FR | 31.01.2018 | LI | 31.01.2018 | [2020/31] |
Former [2020/27] | HU | 17.01.2008 | |
AT | 21.06.2017 | ||
CZ | 21.06.2017 | ||
DK | 21.06.2017 | ||
EE | 21.06.2017 | ||
ES | 21.06.2017 | ||
FI | 21.06.2017 | ||
HR | 21.06.2017 | ||
IT | 21.06.2017 | ||
LT | 21.06.2017 | ||
LV | 21.06.2017 | ||
MC | 21.06.2017 | ||
PL | 21.06.2017 | ||
PT | 21.06.2017 | ||
RO | 21.06.2017 | ||
SE | 21.06.2017 | ||
SI | 21.06.2017 | ||
SK | 21.06.2017 | ||
TR | 21.06.2017 | ||
BG | 21.09.2017 | ||
NO | 21.09.2017 | ||
GR | 22.09.2017 | ||
IS | 21.10.2017 | ||
IE | 17.01.2018 | ||
LU | 17.01.2018 | ||
MT | 17.01.2018 | ||
BE | 31.01.2018 | ||
CH | 31.01.2018 | ||
FR | 31.01.2018 | ||
LI | 31.01.2018 | ||
Former [2020/15] | AT | 21.06.2017 | |
CZ | 21.06.2017 | ||
DK | 21.06.2017 | ||
EE | 21.06.2017 | ||
ES | 21.06.2017 | ||
FI | 21.06.2017 | ||
HR | 21.06.2017 | ||
IT | 21.06.2017 | ||
LT | 21.06.2017 | ||
LV | 21.06.2017 | ||
MC | 21.06.2017 | ||
PL | 21.06.2017 | ||
RO | 21.06.2017 | ||
SE | 21.06.2017 | ||
SI | 21.06.2017 | ||
SK | 21.06.2017 | ||
TR | 21.06.2017 | ||
BG | 21.09.2017 | ||
NO | 21.09.2017 | ||
GR | 22.09.2017 | ||
IS | 21.10.2017 | ||
IE | 17.01.2018 | ||
LU | 17.01.2018 | ||
MT | 17.01.2018 | ||
BE | 31.01.2018 | ||
CH | 31.01.2018 | ||
FR | 31.01.2018 | ||
LI | 31.01.2018 | ||
Former [2020/08] | AT | 21.06.2017 | |
CZ | 21.06.2017 | ||
DK | 21.06.2017 | ||
EE | 21.06.2017 | ||
ES | 21.06.2017 | ||
FI | 21.06.2017 | ||
HR | 21.06.2017 | ||
IT | 21.06.2017 | ||
LT | 21.06.2017 | ||
LV | 21.06.2017 | ||
MC | 21.06.2017 | ||
PL | 21.06.2017 | ||
RO | 21.06.2017 | ||
SE | 21.06.2017 | ||
SI | 21.06.2017 | ||
SK | 21.06.2017 | ||
BG | 21.09.2017 | ||
NO | 21.09.2017 | ||
GR | 22.09.2017 | ||
IS | 21.10.2017 | ||
IE | 17.01.2018 | ||
LU | 17.01.2018 | ||
MT | 17.01.2018 | ||
BE | 31.01.2018 | ||
CH | 31.01.2018 | ||
FR | 31.01.2018 | ||
LI | 31.01.2018 | ||
Former [2019/30] | AT | 21.06.2017 | |
CZ | 21.06.2017 | ||
DK | 21.06.2017 | ||
EE | 21.06.2017 | ||
ES | 21.06.2017 | ||
FI | 21.06.2017 | ||
HR | 21.06.2017 | ||
IT | 21.06.2017 | ||
LT | 21.06.2017 | ||
LV | 21.06.2017 | ||
MC | 21.06.2017 | ||
PL | 21.06.2017 | ||
RO | 21.06.2017 | ||
SE | 21.06.2017 | ||
SI | 21.06.2017 | ||
SK | 21.06.2017 | ||
BG | 21.09.2017 | ||
NO | 21.09.2017 | ||
GR | 22.09.2017 | ||
IS | 21.10.2017 | ||
IE | 17.01.2018 | ||
LU | 17.01.2018 | ||
BE | 31.01.2018 | ||
CH | 31.01.2018 | ||
FR | 31.01.2018 | ||
LI | 31.01.2018 | ||
Former [2019/09] | AT | 21.06.2017 | |
CZ | 21.06.2017 | ||
DK | 21.06.2017 | ||
EE | 21.06.2017 | ||
ES | 21.06.2017 | ||
FI | 21.06.2017 | ||
HR | 21.06.2017 | ||
IT | 21.06.2017 | ||
LT | 21.06.2017 | ||
LV | 21.06.2017 | ||
PL | 21.06.2017 | ||
RO | 21.06.2017 | ||
SE | 21.06.2017 | ||
SI | 21.06.2017 | ||
SK | 21.06.2017 | ||
BG | 21.09.2017 | ||
NO | 21.09.2017 | ||
GR | 22.09.2017 | ||
IS | 21.10.2017 | ||
IE | 17.01.2018 | ||
LU | 17.01.2018 | ||
BE | 31.01.2018 | ||
CH | 31.01.2018 | ||
FR | 31.01.2018 | ||
LI | 31.01.2018 | ||
Former [2018/52] | AT | 21.06.2017 | |
CZ | 21.06.2017 | ||
DK | 21.06.2017 | ||
EE | 21.06.2017 | ||
ES | 21.06.2017 | ||
FI | 21.06.2017 | ||
HR | 21.06.2017 | ||
IT | 21.06.2017 | ||
LT | 21.06.2017 | ||
LV | 21.06.2017 | ||
PL | 21.06.2017 | ||
RO | 21.06.2017 | ||
SE | 21.06.2017 | ||
SI | 21.06.2017 | ||
SK | 21.06.2017 | ||
BG | 21.09.2017 | ||
NO | 21.09.2017 | ||
GR | 22.09.2017 | ||
IS | 21.10.2017 | ||
LU | 17.01.2018 | ||
BE | 31.01.2018 | ||
CH | 31.01.2018 | ||
FR | 31.01.2018 | ||
LI | 31.01.2018 | ||
Former [2018/49] | AT | 21.06.2017 | |
CZ | 21.06.2017 | ||
DK | 21.06.2017 | ||
EE | 21.06.2017 | ||
ES | 21.06.2017 | ||
FI | 21.06.2017 | ||
HR | 21.06.2017 | ||
IT | 21.06.2017 | ||
LT | 21.06.2017 | ||
LV | 21.06.2017 | ||
PL | 21.06.2017 | ||
RO | 21.06.2017 | ||
SE | 21.06.2017 | ||
SI | 21.06.2017 | ||
SK | 21.06.2017 | ||
BG | 21.09.2017 | ||
NO | 21.09.2017 | ||
GR | 22.09.2017 | ||
IS | 21.10.2017 | ||
LU | 17.01.2018 | ||
BE | 31.01.2018 | ||
FR | 31.01.2018 | ||
Former [2018/47] | AT | 21.06.2017 | |
CZ | 21.06.2017 | ||
DK | 21.06.2017 | ||
EE | 21.06.2017 | ||
ES | 21.06.2017 | ||
FI | 21.06.2017 | ||
HR | 21.06.2017 | ||
IT | 21.06.2017 | ||
LT | 21.06.2017 | ||
LV | 21.06.2017 | ||
PL | 21.06.2017 | ||
RO | 21.06.2017 | ||
SE | 21.06.2017 | ||
SI | 21.06.2017 | ||
SK | 21.06.2017 | ||
BG | 21.09.2017 | ||
NO | 21.09.2017 | ||
GR | 22.09.2017 | ||
IS | 21.10.2017 | ||
LU | 17.01.2018 | ||
Former [2018/39] | AT | 21.06.2017 | |
CZ | 21.06.2017 | ||
DK | 21.06.2017 | ||
EE | 21.06.2017 | ||
ES | 21.06.2017 | ||
FI | 21.06.2017 | ||
HR | 21.06.2017 | ||
IT | 21.06.2017 | ||
LT | 21.06.2017 | ||
LV | 21.06.2017 | ||
PL | 21.06.2017 | ||
RO | 21.06.2017 | ||
SE | 21.06.2017 | ||
SI | 21.06.2017 | ||
SK | 21.06.2017 | ||
BG | 21.09.2017 | ||
NO | 21.09.2017 | ||
GR | 22.09.2017 | ||
IS | 21.10.2017 | ||
Former [2018/21] | AT | 21.06.2017 | |
CZ | 21.06.2017 | ||
DK | 21.06.2017 | ||
EE | 21.06.2017 | ||
ES | 21.06.2017 | ||
FI | 21.06.2017 | ||
HR | 21.06.2017 | ||
IT | 21.06.2017 | ||
LT | 21.06.2017 | ||
LV | 21.06.2017 | ||
PL | 21.06.2017 | ||
RO | 21.06.2017 | ||
SE | 21.06.2017 | ||
SK | 21.06.2017 | ||
BG | 21.09.2017 | ||
NO | 21.09.2017 | ||
GR | 22.09.2017 | ||
IS | 21.10.2017 | ||
Former [2018/11] | AT | 21.06.2017 | |
CZ | 21.06.2017 | ||
EE | 21.06.2017 | ||
ES | 21.06.2017 | ||
FI | 21.06.2017 | ||
HR | 21.06.2017 | ||
IT | 21.06.2017 | ||
LT | 21.06.2017 | ||
LV | 21.06.2017 | ||
PL | 21.06.2017 | ||
RO | 21.06.2017 | ||
SE | 21.06.2017 | ||
SK | 21.06.2017 | ||
BG | 21.09.2017 | ||
NO | 21.09.2017 | ||
GR | 22.09.2017 | ||
IS | 21.10.2017 | ||
Former [2018/10] | AT | 21.06.2017 | |
CZ | 21.06.2017 | ||
EE | 21.06.2017 | ||
FI | 21.06.2017 | ||
HR | 21.06.2017 | ||
LT | 21.06.2017 | ||
LV | 21.06.2017 | ||
RO | 21.06.2017 | ||
SE | 21.06.2017 | ||
SK | 21.06.2017 | ||
BG | 21.09.2017 | ||
NO | 21.09.2017 | ||
GR | 22.09.2017 | ||
Former [2018/09] | EE | 21.06.2017 | |
FI | 21.06.2017 | ||
HR | 21.06.2017 | ||
LT | 21.06.2017 | ||
LV | 21.06.2017 | ||
SE | 21.06.2017 | ||
BG | 21.09.2017 | ||
NO | 21.09.2017 | ||
GR | 22.09.2017 | ||
Former [2017/50] | FI | 21.06.2017 | |
HR | 21.06.2017 | ||
LT | 21.06.2017 | ||
LV | 21.06.2017 | ||
SE | 21.06.2017 | ||
BG | 21.09.2017 | ||
NO | 21.09.2017 | ||
GR | 22.09.2017 | ||
Former [2017/49] | FI | 21.06.2017 | |
HR | 21.06.2017 | ||
LT | 21.06.2017 | ||
NO | 21.09.2017 | ||
GR | 22.09.2017 | Documents cited: | Search | [A]WO2004003715 (SONY ERICSSON MOBILE COMM AB [SE], et al) [A] 1,14,19* abstract *; | [A]WO2007149732 (INTEL CORP [US], et al) [A] 1-19 * abstract * * paragraphs [0019] - [0020] * | International search | [A]WO2006037377 (ERICSSON TELEFON AB L M [SE], et al); | [A]US2007064662 (BULTAN AYKUT [US], et al); | [X]WO2007149732 (INTEL CORP [US], et al); | [E]WO2008082347 (ERICSSON TELEFON AB L M [SE], et al); | [E]US2008181127 (TERRY STEPHEN E [US], et al) |