blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2132476

EP2132476 - METHOD FOR FILLING A PRESSURISED RESERVOIR PROVIDED FOR A CRYOGENIC STORED MEDIUM IN PARTICULAR HYDROGEN [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  07.07.2017
Database last updated on 07.10.2024
FormerExamination is in progress
Status updated on  09.11.2016
Most recent event   Tooltip07.07.2017Application deemed to be withdrawnpublished on 09.08.2017  [2017/32]
Applicant(s)For all designated states
Bayerische Motoren Werke Aktiengesellschaft
Petuelring 130
80809 München / DE
[N/P]
Former [2014/28]For all designated states
Bayerische Motoren Werke Aktiengesellschaft
Petuelring 130
80809 München / DE
Former [2009/51]For all designated states
Bayerische Motoren Werke Aktiengesellschaft
Petuelring 130
80809 München / DE
Inventor(s)01 / BRUNNER, Tobias
Oskar von Millerstasse 25
82008 Unterhaching / DE
 [2009/51]
Application number, filing date08709217.726.02.2008
[2009/51]
WO2008EP52314
Priority number, dateDE2007101153009.03.2007         Original published format: DE102007011530
[2009/51]
Filing languageDE
Procedural languageDE
PublicationType: A2 Application without search report
No.:WO2008110453
Date:18.09.2008
Language:DE
[2008/38]
Type: A2 Application without search report 
No.:EP2132476
Date:16.12.2009
Language:DE
The application published by WIPO in one of the EPO official languages on 18.09.2008 takes the place of the publication of the European patent application.
[2009/51]
Search report(s)International search report - published on:EP06.11.2008
ClassificationIPC:F17C5/00, F17C5/06, F17C5/04, F17C5/02, F17C9/02
[2009/51]
CPC:
F17C5/007 (EP,US); F17C5/02 (EP,US); F17C5/04 (EP,US);
F17C5/06 (EP,US); F17C9/02 (EP,US); F17C2205/0364 (EP,US);
F17C2205/0367 (EP,US); F17C2221/012 (EP,US); F17C2223/0161 (EP,US);
F17C2223/033 (EP,US); F17C2225/0115 (EP,US); F17C2225/036 (EP,US);
F17C2227/0135 (EP,US); F17C2227/0339 (EP,US); F17C2227/0374 (EP,US);
F17C2260/031 (EP,US); F17C2265/031 (EP,US); F17C2265/032 (EP,US);
F17C2270/0139 (EP,US); F17C2270/0168 (EP,US); Y02E60/32 (EP,US) (-)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MT,   NL,   NO,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2009/51]
TitleGerman:VERFAHREN ZUM BEFÜLLEN EINES FÜR EIN KRYOGENES SPEICHERMEDIUM, INSBESONDERE WASSERSTOFF, VORGESEHENEN DRUCKSPEICHERS[2009/51]
English:METHOD FOR FILLING A PRESSURISED RESERVOIR PROVIDED FOR A CRYOGENIC STORED MEDIUM IN PARTICULAR HYDROGEN[2009/51]
French:PROCÉDÉ DE REMPLISSAGE D'UN RÉSERVOIR SOUS PRESSION PRÉVU POUR UN FLUIDE À STOCKER CRYOGÉNIQUE, NOTAMMENT DE L'HYDROGÈNE[2009/51]
Entry into regional phase07.07.2009National basic fee paid 
07.07.2009Designation fee(s) paid 
07.07.2009Examination fee paid 
Examination procedure07.07.2009Amendment by applicant (claims and/or description)
07.07.2009Examination requested  [2009/51]
10.02.2011Invitation to provide information on prior art
18.02.2011Reply to the invitation to provide information on prior art
28.10.2016Despatch of a communication from the examining division (Time limit: M04)
08.03.2017Application deemed to be withdrawn, date of legal effect  [2017/32]
04.04.2017Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time  [2017/32]
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  28.10.2016
Fees paidRenewal fee
12.02.2010Renewal fee patent year 03
18.02.2011Renewal fee patent year 04
16.02.2012Renewal fee patent year 05
21.02.2013Renewal fee patent year 06
10.02.2014Renewal fee patent year 07
13.02.2015Renewal fee patent year 08
29.02.2016Renewal fee patent year 09
Penalty fee
Additional fee for renewal fee
28.02.201710   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[X]EP1683999  (AIR PROD & CHEM [US]) [X] 1-3,6 * the whole document *;
 [A]WO2004081441  (CONVERSION GAS IMP S L P [US], et al);
 [DA]DE4129020  (DEUTSCHE FORSCH LUFT RAUMFAHRT [DE]);
 [A]CA2362844  (WESTPORT RES INC [CA])
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.