EP2121499 - DISPLAY DEVICE AND COMMUNICATION METHOD FOR A LIFT SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 24.12.2021 Database last updated on 26.07.2024 | |
Former | The patent has been granted Status updated on 15.01.2021 | ||
Former | Grant of patent is intended Status updated on 26.10.2020 | ||
Former | Examination is in progress Status updated on 14.07.2017 | Most recent event Tooltip | 02.06.2023 | Lapse of the patent in a contracting state New state(s): HU | published on 05.07.2023 [2023/27] | Applicant(s) | For all designated states Inventio AG Seestrasse 55 6052 Hergiswil / CH | [2021/07] |
Former [2009/48] | For all designated states Inventio AG Seestrasse 55 Postfach 6052 Hergiswil / CH | Inventor(s) | 01 /
KOSTKA, Miroslav Flurhöhe 18 CH-6275 Ballwil / CH | [2009/48] | Representative(s) | (deleted) | [2010/17] |
Former [2009/48] | Blöchle, Hans, et al Inventio AG, Seestrasse 55 Postfach 6052 Hergiswil / CH | Application number, filing date | 08717862.0 | 14.03.2008 | [2009/48] | WO2008EP53122 | Priority number, date | EP20070104216 | 15.03.2007 Original published format: EP 07104216 | [2009/48] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2008110631 | Date: | 18.09.2008 | Language: | DE | [2008/38] | Type: | A1 Application with search report | No.: | EP2121499 | Date: | 25.11.2009 | Language: | DE | The application published by WIPO in one of the EPO official languages on 18.09.2008 takes the place of the publication of the European patent application. | [2009/48] | Type: | B1 Patent specification | No.: | EP2121499 | Date: | 17.02.2021 | Language: | DE | [2021/07] | Search report(s) | International search report - published on: | EP | 18.09.2008 | Classification | IPC: | B66B3/02 | [2009/48] | CPC: |
B66B3/02 (EP,KR,US)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2021/07] |
Former [2009/48] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR | Extension states | AL | 15.09.2009 | BA | 15.09.2009 | RS | 15.09.2009 | Title | German: | ANZEIGEVORRICHTUNG UND KOMMUNIKATIONSVERFAHREN FÜR EIN AUFZUGSYSTEM | [2009/48] | English: | DISPLAY DEVICE AND COMMUNICATION METHOD FOR A LIFT SYSTEM | [2009/48] | French: | DISPOSITIF D'AFFICHAGE ET PROCÉDÉ DE COMMUNICATION POUR UN SYSTÈME D'ASCENSEUR | [2009/48] | Entry into regional phase | 15.09.2009 | National basic fee paid | 15.09.2009 | Designation fee(s) paid | 15.09.2009 | Examination fee paid | Examination procedure | 22.10.2008 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 15.09.2009 | Examination requested [2009/48] | 17.07.2017 | Despatch of a communication from the examining division (Time limit: M03) | 25.10.2017 | Reply to a communication from the examining division | 27.10.2020 | Communication of intention to grant the patent | 11.01.2021 | Fee for grant paid | 11.01.2021 | Fee for publishing/printing paid | 11.01.2021 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 17.07.2017 | Opposition(s) | 18.11.2021 | No opposition filed within time limit [2022/04] | Fees paid | Renewal fee | 05.03.2010 | Renewal fee patent year 03 | 16.03.2011 | Renewal fee patent year 04 | 30.03.2012 | Renewal fee patent year 05 | 27.03.2013 | Renewal fee patent year 06 | 28.03.2014 | Renewal fee patent year 07 | 30.03.2015 | Renewal fee patent year 08 | 31.03.2016 | Renewal fee patent year 09 | 31.03.2017 | Renewal fee patent year 10 | 23.03.2018 | Renewal fee patent year 11 | 26.03.2019 | Renewal fee patent year 12 | 24.03.2020 | Renewal fee patent year 13 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 14.03.2008 | CY | 17.02.2021 | CZ | 17.02.2021 | DK | 17.02.2021 | EE | 17.02.2021 | ES | 17.02.2021 | FI | 17.02.2021 | HR | 17.02.2021 | IT | 17.02.2021 | LT | 17.02.2021 | LV | 17.02.2021 | MC | 17.02.2021 | NL | 17.02.2021 | PL | 17.02.2021 | RO | 17.02.2021 | SE | 17.02.2021 | SI | 17.02.2021 | SK | 17.02.2021 | AT | 14.03.2021 | IE | 14.03.2021 | LU | 14.03.2021 | BE | 31.03.2021 | BG | 17.05.2021 | NO | 17.05.2021 | GR | 18.05.2021 | IS | 17.06.2021 | PT | 17.06.2021 | [2023/27] |
Former [2023/24] | CY | 17.02.2021 | |
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
IT | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
SE | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
AT | 14.03.2021 | ||
IE | 14.03.2021 | ||
LU | 14.03.2021 | ||
BE | 31.03.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2022/36] | CZ | 17.02.2021 | |
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
IT | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
SE | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
AT | 14.03.2021 | ||
IE | 14.03.2021 | ||
LU | 14.03.2021 | ||
BE | 31.03.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2022/34] | CZ | 17.02.2021 | |
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
IT | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
SE | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
IE | 14.03.2021 | ||
LU | 14.03.2021 | ||
BE | 31.03.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2022/23] | CZ | 17.02.2021 | |
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
IT | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
SE | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
IE | 14.03.2021 | ||
LU | 14.03.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2022/13] | CZ | 17.02.2021 | |
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
SE | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
IE | 14.03.2021 | ||
LU | 14.03.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
PT | 17.06.2021 | ||
Former [2022/10] | CZ | 17.02.2021 | |
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
SE | 17.02.2021 | ||
SK | 17.02.2021 | ||
IE | 14.03.2021 | ||
LU | 14.03.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
PT | 17.06.2021 | ||
Former [2022/09] | CZ | 17.02.2021 | |
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
SE | 17.02.2021 | ||
SK | 17.02.2021 | ||
IE | 14.03.2021 | ||
LU | 14.03.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2022/07] | CZ | 17.02.2021 | |
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
SE | 17.02.2021 | ||
SK | 17.02.2021 | ||
IE | 14.03.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2021/51] | CZ | 17.02.2021 | |
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
SE | 17.02.2021 | ||
SK | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2021/50] | CZ | 17.02.2021 | |
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
SE | 17.02.2021 | ||
SK | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2021/49] | CZ | 17.02.2021 | |
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
SE | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2021/48] | CZ | 17.02.2021 | |
EE | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
SE | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2021/42] | FI | 17.02.2021 | |
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
SE | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2021/39] | FI | 17.02.2021 | |
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
SE | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
PT | 17.06.2021 | ||
Former [2021/38] | FI | 17.02.2021 | |
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
SE | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
PT | 17.06.2021 | ||
Former [2021/37] | FI | 17.02.2021 | |
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
PT | 17.06.2021 | ||
Former [2021/36] | FI | 17.02.2021 | |
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
PT | 17.06.2021 | ||
Former [2021/35] | FI | 17.02.2021 | |
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
NO | 17.05.2021 | ||
PT | 17.06.2021 | ||
Former [2021/33] | FI | 17.02.2021 | |
LT | 17.02.2021 | ||
NO | 17.05.2021 | ||
PT | 17.06.2021 | Cited in | International search | [A]US4064971 (IWASAKA TATSUO, et al) [A] 1,10 * abstract *; | [X]JPS62116484 (KOITO MFG CO LTD) [X] 1-16 * figures 1-5 *; | [X]JPS63202577 (HITACHI LTD) [X] 1-16 * figures 1,2 *; | [A]GB2203568 (HITACHI LTD) [A] 1,10 * abstract *; | [X]WO9737922 (INVENTIO AG [CH], et al) [X] 1-16 * abstract *; | [X]JP2000272850 (MITSUBISHI ELECTRIC CORP) [X] 1-16 * figures 2a,2b *; | [A]JP2005047648 (TOSHIBA ELEVATOR CO LTD) [A] 1-16* figure 16 * |