EP2139760 - SYSTEM FOR TRANSPORTATION OF GOODS IN A LOADING SPACE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 18.10.2019 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 09.11.2018 | ||
Former | Grant of patent is intended Status updated on 03.07.2018 | ||
Former | Examination is in progress Status updated on 28.11.2016 | Most recent event Tooltip | 09.07.2021 | Lapse of the patent in a contracting state New state(s): HU | published on 11.08.2021 [2021/32] | Applicant(s) | For all designated states Telair International AB Porfyrvägen 14 224 78 Lund / SE | [2018/50] |
Former [2014/17] | For all designated states Telair International AB Porfyrvägen 14 224 78 Lund / SE | ||
Former [2010/01] | For all designated states Crossborder Aero Technologies AB Löddesnäsvägen 3 237 41 Bjärred / SE | Inventor(s) | 01 /
NORDSTRÖM, Claes Mäster Eriks väg 4A S-224 67 Lund / SE | [2010/01] | Representative(s) | Kuhnen & Wacker Patent- und Rechtsanwaltsbüro PartG mbB Prinz-Ludwig-Straße 40A 85354 Freising / DE | [2018/50] |
Former [2010/20] | Valea AB Anna Lindhs Plats 4 211 19 Malmö / SE | ||
Former [2010/01] | Nikolopoulou, Sofia Zacco Sweden AB Patent Department P.O. Box 23101 104 35 Stockholm / SE | Application number, filing date | 08724255.8 | 19.03.2008 | [2010/01] | WO2008SE50308 | Priority number, date | SE20070000776 | 27.03.2007 Original published format: SE 0700776 | [2010/01] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2008118076 | Date: | 02.10.2008 | Language: | EN | [2008/40] | Type: | A1 Application with search report | No.: | EP2139760 | Date: | 06.01.2010 | Language: | EN | The application published by WIPO in one of the EPO official languages on 02.10.2008 takes the place of the publication of the European patent application. | [2010/01] | Type: | B1 Patent specification | No.: | EP2139760 | Date: | 12.12.2018 | Language: | EN | [2018/50] | Search report(s) | International search report - published on: | SE | 02.10.2008 | (Supplementary) European search report - dispatched on: | EP | 09.08.2013 | Classification | IPC: | B64C1/22, B60P1/36, B64D9/00, B65G25/06, B60P1/38, B65G21/06, B65G21/14, B64F1/32, B65G47/88 | [2013/37] | CPC: |
B60P1/38 (EP,US);
B64F1/324 (EP,SE,US);
B60P1/365 (SE);
B64C1/22 (SE);
B64D9/00 (EP,SE,US);
B65G21/06 (EP,SE,US);
B65G21/14 (EP,SE,US);
B65G25/065 (SE);
B65G47/883 (EP,SE,US);
|
Former IPC [2010/01] | B64C1/22, B60P1/36, B64D9/00, B65G25/06 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2018/50] |
Former [2010/01] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR | Title | German: | SYSTEM ZUM TRANSPORT VON GÜTERN IN EINEM LADERAUM | [2010/01] | English: | SYSTEM FOR TRANSPORTATION OF GOODS IN A LOADING SPACE | [2010/01] | French: | SYSTÈME DE TRANSPORT DE MARCHANDISES DANS UN ESPACE DE CHARGEMENT | [2010/01] | Entry into regional phase | 08.10.2009 | National basic fee paid | 08.10.2009 | Search fee paid | 08.10.2009 | Designation fee(s) paid | 08.10.2009 | Examination fee paid | Examination procedure | 23.10.2008 | Request for preliminary examination filed International Preliminary Examining Authority: SE | 08.10.2009 | Examination requested [2010/01] | 06.02.2014 | Amendment by applicant (claims and/or description) | 12.09.2016 | Despatch of a communication from the examining division (Time limit: M04) | 23.11.2016 | Reply to a communication from the examining division | 16.05.2018 | Despatch of a communication from the examining division (Time limit: M02) | 18.05.2018 | Reply to a communication from the examining division | 04.07.2018 | Communication of intention to grant the patent | 31.10.2018 | Fee for grant paid | 31.10.2018 | Fee for publishing/printing paid | 31.10.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 12.09.2016 | Opposition(s) | 13.09.2019 | No opposition filed within time limit [2019/47] | Fees paid | Renewal fee | 15.03.2010 | Renewal fee patent year 03 | 24.03.2011 | Renewal fee patent year 04 | 27.03.2012 | Renewal fee patent year 05 | 25.09.2013 | Renewal fee patent year 06 | 11.04.2014 | Renewal fee patent year 07 | 24.03.2015 | Renewal fee patent year 08 | 10.03.2016 | Renewal fee patent year 09 | 10.03.2017 | Renewal fee patent year 10 | 12.03.2018 | Renewal fee patent year 11 | Penalty fee | Additional fee for renewal fee | 31.03.2013 | 06   M06   Fee paid on   25.09.2013 | 31.03.2014 | 07   M06   Fee paid on   11.04.2014 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 19.03.2008 | AT | 12.12.2018 | CY | 12.12.2018 | CZ | 12.12.2018 | DK | 12.12.2018 | EE | 12.12.2018 | ES | 12.12.2018 | FI | 12.12.2018 | HR | 12.12.2018 | IT | 12.12.2018 | LT | 12.12.2018 | LV | 12.12.2018 | MC | 12.12.2018 | NL | 12.12.2018 | PL | 12.12.2018 | RO | 12.12.2018 | SI | 12.12.2018 | SK | 12.12.2018 | TR | 12.12.2018 | BG | 12.03.2019 | NO | 12.03.2019 | GR | 13.03.2019 | IE | 19.03.2019 | LU | 19.03.2019 | MT | 19.03.2019 | BE | 31.03.2019 | CH | 31.03.2019 | LI | 31.03.2019 | IS | 12.04.2019 | PT | 12.04.2019 | [2021/32] |
Former [2021/26] | AT | 12.12.2018 | |
CY | 12.12.2018 | ||
CZ | 12.12.2018 | ||
DK | 12.12.2018 | ||
EE | 12.12.2018 | ||
ES | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
IT | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
MC | 12.12.2018 | ||
NL | 12.12.2018 | ||
PL | 12.12.2018 | ||
RO | 12.12.2018 | ||
SI | 12.12.2018 | ||
SK | 12.12.2018 | ||
TR | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
IE | 19.03.2019 | ||
LU | 19.03.2019 | ||
MT | 19.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
IS | 12.04.2019 | ||
PT | 12.04.2019 | ||
Former [2020/29] | AT | 12.12.2018 | |
CZ | 12.12.2018 | ||
DK | 12.12.2018 | ||
EE | 12.12.2018 | ||
ES | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
IT | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
MC | 12.12.2018 | ||
NL | 12.12.2018 | ||
PL | 12.12.2018 | ||
RO | 12.12.2018 | ||
SI | 12.12.2018 | ||
SK | 12.12.2018 | ||
TR | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
IE | 19.03.2019 | ||
LU | 19.03.2019 | ||
MT | 19.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
IS | 12.04.2019 | ||
PT | 12.04.2019 | ||
Former [2020/17] | AT | 12.12.2018 | |
CZ | 12.12.2018 | ||
DK | 12.12.2018 | ||
EE | 12.12.2018 | ||
ES | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
IT | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
MC | 12.12.2018 | ||
NL | 12.12.2018 | ||
PL | 12.12.2018 | ||
RO | 12.12.2018 | ||
SI | 12.12.2018 | ||
SK | 12.12.2018 | ||
TR | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
IE | 19.03.2019 | ||
LU | 19.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
IS | 12.04.2019 | ||
PT | 12.04.2019 | ||
Former [2020/11] | AT | 12.12.2018 | |
CZ | 12.12.2018 | ||
DK | 12.12.2018 | ||
EE | 12.12.2018 | ||
ES | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
IT | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
MC | 12.12.2018 | ||
NL | 12.12.2018 | ||
PL | 12.12.2018 | ||
RO | 12.12.2018 | ||
SI | 12.12.2018 | ||
SK | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
IE | 19.03.2019 | ||
LU | 19.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
IS | 12.04.2019 | ||
PT | 12.04.2019 | ||
Former [2020/09] | AT | 12.12.2018 | |
CZ | 12.12.2018 | ||
DK | 12.12.2018 | ||
EE | 12.12.2018 | ||
ES | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
IT | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
MC | 12.12.2018 | ||
NL | 12.12.2018 | ||
PL | 12.12.2018 | ||
RO | 12.12.2018 | ||
SI | 12.12.2018 | ||
SK | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
IE | 19.03.2019 | ||
LU | 19.03.2019 | ||
IS | 12.04.2019 | ||
PT | 12.04.2019 | ||
Former [2020/01] | AT | 12.12.2018 | |
CZ | 12.12.2018 | ||
DK | 12.12.2018 | ||
EE | 12.12.2018 | ||
ES | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
IT | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
MC | 12.12.2018 | ||
NL | 12.12.2018 | ||
PL | 12.12.2018 | ||
RO | 12.12.2018 | ||
SI | 12.12.2018 | ||
SK | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
LU | 19.03.2019 | ||
IS | 12.04.2019 | ||
PT | 12.04.2019 | ||
Former [2019/49] | AT | 12.12.2018 | |
CZ | 12.12.2018 | ||
DK | 12.12.2018 | ||
EE | 12.12.2018 | ||
ES | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
IT | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
MC | 12.12.2018 | ||
NL | 12.12.2018 | ||
PL | 12.12.2018 | ||
RO | 12.12.2018 | ||
SI | 12.12.2018 | ||
SK | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
IS | 12.04.2019 | ||
PT | 12.04.2019 | ||
Former [2019/48] | AT | 12.12.2018 | |
CZ | 12.12.2018 | ||
DK | 12.12.2018 | ||
EE | 12.12.2018 | ||
ES | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
IT | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
MC | 12.12.2018 | ||
NL | 12.12.2018 | ||
PL | 12.12.2018 | ||
RO | 12.12.2018 | ||
SK | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
IS | 12.04.2019 | ||
PT | 12.04.2019 | ||
Former [2019/46] | AT | 12.12.2018 | |
CZ | 12.12.2018 | ||
EE | 12.12.2018 | ||
ES | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
IT | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
MC | 12.12.2018 | ||
NL | 12.12.2018 | ||
PL | 12.12.2018 | ||
RO | 12.12.2018 | ||
SK | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
IS | 12.04.2019 | ||
PT | 12.04.2019 | ||
Former [2019/39] | CZ | 12.12.2018 | |
EE | 12.12.2018 | ||
ES | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
IT | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
NL | 12.12.2018 | ||
PL | 12.12.2018 | ||
RO | 12.12.2018 | ||
SK | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
IS | 12.04.2019 | ||
PT | 12.04.2019 | ||
Former [2019/37] | CZ | 12.12.2018 | |
EE | 12.12.2018 | ||
ES | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
IT | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
NL | 12.12.2018 | ||
PL | 12.12.2018 | ||
RO | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
PT | 12.04.2019 | ||
Former [2019/35] | CZ | 12.12.2018 | |
ES | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
IT | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
NL | 12.12.2018 | ||
PL | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
PT | 12.04.2019 | ||
Former [2019/34] | ES | 12.12.2018 | |
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
IT | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
NL | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
PT | 12.04.2019 | ||
Former [2019/33] | ES | 12.12.2018 | |
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
NL | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
PT | 12.04.2019 | ||
Former [2019/30] | ES | 12.12.2018 | |
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
NL | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
Former [2019/24] | ES | 12.12.2018 | |
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
Former [2019/23] | ES | 12.12.2018 | |
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
Former [2019/22] | FI | 12.12.2018 | |
LT | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
Former [2019/21] | FI | 12.12.2018 | |
LT | 12.12.2018 | ||
NO | 12.03.2019 | ||
Former [2019/20] | LT | 12.12.2018 | |
NO | 12.03.2019 | Documents cited: | Search | [A]US3722717 (STRYCZEK L) [A] 1 * figures 1-7 *; | [A]US4162735 (LEWIS MILBURN [US]) [A] 1* figures 1-7 *; | [A]DE3413528 (MORI TOKITAKA) [A] 1 * figures 1-9 *; | [XI]DE3790247 (SCANDINAVIAN BELLYLOADING [SE]) [X] 1,12,17,18 * paragraph [0079] - paragraph [0145]; figures 1-43 * [I] 2-11,13-16 | International search | [A]FR613666 ; | [A]GB417246 (HARDY ET CIE SOC ETS); | [X]US4162735 (LEWIS MILBURN [US]); | [A]US4842471 (HODGETTS GRAHAM L [US]); | [Y]US5046690 (NORDSTROEM CLAES [SE]); | [A]DE20018339U (DANNER HANS [DE]); | [A]WO2005028248 (RUFLO B V [NL], et al) |