EP2125359 - MATERIALS FOR THERMAL PROTECTION AND METHODS OF MANUFACTURING SAME [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 02.06.2017 Database last updated on 14.05.2024 | Most recent event Tooltip | 06.03.2020 | Lapse of the patent in a contracting state New state(s): TR | published on 08.04.2020 [2020/15] | Applicant(s) | For all designated states Nanocomp Technologies, Inc. 162 Pembroke Road Concord, NH 03301 / US | [2009/49] | Inventor(s) | 01 /
LASHMORE, David, S. 60 Farr Road Lebanon, NH 03766 / US | [2009/49] | Representative(s) | HGF 1 City Walk Leeds LS11 9DX / GB | [N/P] |
Former [2016/30] | Atkinson, Jonathan David Mark HGF Limited 1 City Walk Leeds LS11 9DX / GB | ||
Former [2009/49] | Atkinson, Jonathan David Mark Harrison Goddard Foote Belgrave Hall Belgrave Street Leeds LS2 8DD / GB | Application number, filing date | 08726128.5 | 27.02.2008 | [2009/49] | WO2008US02548 | Priority number, date | US20070903767P | 27.02.2007 Original published format: US 903767 P | [2009/49] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2008106143 | Date: | 04.09.2008 | Language: | EN | [2008/36] | Type: | A2 Application without search report | No.: | EP2125359 | Date: | 02.12.2009 | Language: | EN | The application published by WIPO in one of the EPO official languages on 04.09.2008 takes the place of the publication of the European patent application. | [2009/49] | Type: | B1 Patent specification | No.: | EP2125359 | Date: | 27.07.2016 | Language: | EN | [2016/30] | Search report(s) | International search report - published on: | US | 06.11.2008 | (Supplementary) European search report - dispatched on: | EP | 21.08.2012 | Classification | IPC: | B32B5/02, B82Y30/00, B32B33/00 | [2012/38] | CPC: |
B32B33/00 (EP,US);
B82Y30/00 (EP,US);
B32B2305/20 (EP,US);
B32B2305/28 (EP,US);
B32B2307/306 (EP,US);
B32B2309/105 (EP,US);
B32B2311/00 (EP,US);
B32B37/12 (EP,US);
Y10T428/27 (EP,US);
Y10T428/28 (EP,US)
(-)
|
Former IPC [2009/49] | B32B5/02 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2016/30] |
Former [2009/49] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR | Extension states | AL | Not yet paid | BA | Not yet paid | MK | Not yet paid | RS | Not yet paid | Title | German: | THERMALSCHUTZMATERIALIEN UND VERFAHREN ZU IHRER HERSTELLUNG | [2009/49] | English: | MATERIALS FOR THERMAL PROTECTION AND METHODS OF MANUFACTURING SAME | [2009/49] | French: | MATÉRIAUX POUR PROTECTION THERMIQUE ET PROCÉDÉS DE FABRICATION DE CEUX-CI | [2009/49] | Entry into regional phase | 26.08.2009 | National basic fee paid | 26.08.2009 | Search fee paid | 26.08.2009 | Designation fee(s) paid | 26.08.2009 | Examination fee paid | Examination procedure | 26.08.2009 | Examination requested [2009/49] | 05.03.2013 | Amendment by applicant (claims and/or description) | 08.04.2013 | Despatch of a communication from the examining division (Time limit: M04) | 08.08.2013 | Reply to a communication from the examining division | 12.05.2014 | Despatch of a communication from the examining division (Time limit: M04) | 17.09.2014 | Reply to a communication from the examining division | 16.03.2015 | Despatch of a communication from the examining division (Time limit: M04) | 16.07.2015 | Reply to a communication from the examining division | 26.02.2016 | Communication of intention to grant the patent | 14.06.2016 | Fee for grant paid | 14.06.2016 | Fee for publishing/printing paid | 14.06.2016 | Receipt of the translation of the claim(s) | Divisional application(s) | EP15178317.2 / EP2962986 | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 08.04.2013 | Opposition(s) | 02.05.2017 | No opposition filed within time limit [2017/27] | Fees paid | Renewal fee | 16.02.2010 | Renewal fee patent year 03 | 15.02.2011 | Renewal fee patent year 04 | 24.02.2012 | Renewal fee patent year 05 | 27.03.2013 | Renewal fee patent year 06 | 27.02.2014 | Renewal fee patent year 07 | 26.02.2015 | Renewal fee patent year 08 | 26.02.2016 | Renewal fee patent year 09 | Penalty fee | Additional fee for renewal fee | 28.02.2013 | 06   M06   Fee paid on   27.03.2013 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 27.02.2008 | AT | 27.07.2016 | BE | 27.07.2016 | CY | 27.07.2016 | CZ | 27.07.2016 | DK | 27.07.2016 | EE | 27.07.2016 | ES | 27.07.2016 | FI | 27.07.2016 | HR | 27.07.2016 | IT | 27.07.2016 | LT | 27.07.2016 | LV | 27.07.2016 | MC | 27.07.2016 | PL | 27.07.2016 | RO | 27.07.2016 | SE | 27.07.2016 | SI | 27.07.2016 | SK | 27.07.2016 | TR | 27.07.2016 | BG | 27.10.2016 | NO | 27.10.2016 | GR | 28.10.2016 | IS | 27.11.2016 | PT | 28.11.2016 | IE | 27.02.2017 | LU | 27.02.2017 | MT | 27.02.2017 | CH | 28.02.2017 | LI | 28.02.2017 | [2020/15] |
Former [2019/46] | HU | 27.02.2008 | |
AT | 27.07.2016 | ||
BE | 27.07.2016 | ||
CY | 27.07.2016 | ||
CZ | 27.07.2016 | ||
DK | 27.07.2016 | ||
EE | 27.07.2016 | ||
ES | 27.07.2016 | ||
FI | 27.07.2016 | ||
HR | 27.07.2016 | ||
IT | 27.07.2016 | ||
LT | 27.07.2016 | ||
LV | 27.07.2016 | ||
MC | 27.07.2016 | ||
PL | 27.07.2016 | ||
RO | 27.07.2016 | ||
SE | 27.07.2016 | ||
SI | 27.07.2016 | ||
SK | 27.07.2016 | ||
BG | 27.10.2016 | ||
NO | 27.10.2016 | ||
GR | 28.10.2016 | ||
IS | 27.11.2016 | ||
PT | 28.11.2016 | ||
IE | 27.02.2017 | ||
LU | 27.02.2017 | ||
MT | 27.02.2017 | ||
CH | 28.02.2017 | ||
LI | 28.02.2017 | ||
Former [2019/31] | HU | 27.02.2008 | |
AT | 27.07.2016 | ||
BE | 27.07.2016 | ||
CZ | 27.07.2016 | ||
DK | 27.07.2016 | ||
EE | 27.07.2016 | ||
ES | 27.07.2016 | ||
FI | 27.07.2016 | ||
HR | 27.07.2016 | ||
IT | 27.07.2016 | ||
LT | 27.07.2016 | ||
LV | 27.07.2016 | ||
MC | 27.07.2016 | ||
PL | 27.07.2016 | ||
RO | 27.07.2016 | ||
SE | 27.07.2016 | ||
SI | 27.07.2016 | ||
SK | 27.07.2016 | ||
BG | 27.10.2016 | ||
NO | 27.10.2016 | ||
GR | 28.10.2016 | ||
IS | 27.11.2016 | ||
PT | 28.11.2016 | ||
IE | 27.02.2017 | ||
LU | 27.02.2017 | ||
MT | 27.02.2017 | ||
CH | 28.02.2017 | ||
LI | 28.02.2017 | ||
Former [2018/43] | AT | 27.07.2016 | |
BE | 27.07.2016 | ||
CZ | 27.07.2016 | ||
DK | 27.07.2016 | ||
EE | 27.07.2016 | ||
ES | 27.07.2016 | ||
FI | 27.07.2016 | ||
HR | 27.07.2016 | ||
IT | 27.07.2016 | ||
LT | 27.07.2016 | ||
LV | 27.07.2016 | ||
MC | 27.07.2016 | ||
PL | 27.07.2016 | ||
RO | 27.07.2016 | ||
SE | 27.07.2016 | ||
SI | 27.07.2016 | ||
SK | 27.07.2016 | ||
BG | 27.10.2016 | ||
NO | 27.10.2016 | ||
GR | 28.10.2016 | ||
IS | 27.11.2016 | ||
PT | 28.11.2016 | ||
IE | 27.02.2017 | ||
LU | 27.02.2017 | ||
MT | 27.02.2017 | ||
CH | 28.02.2017 | ||
LI | 28.02.2017 | ||
Former [2018/13] | AT | 27.07.2016 | |
BE | 27.07.2016 | ||
CZ | 27.07.2016 | ||
DK | 27.07.2016 | ||
EE | 27.07.2016 | ||
ES | 27.07.2016 | ||
FI | 27.07.2016 | ||
HR | 27.07.2016 | ||
IT | 27.07.2016 | ||
LT | 27.07.2016 | ||
LV | 27.07.2016 | ||
MC | 27.07.2016 | ||
PL | 27.07.2016 | ||
RO | 27.07.2016 | ||
SE | 27.07.2016 | ||
SI | 27.07.2016 | ||
SK | 27.07.2016 | ||
BG | 27.10.2016 | ||
NO | 27.10.2016 | ||
GR | 28.10.2016 | ||
IS | 27.11.2016 | ||
PT | 28.11.2016 | ||
IE | 27.02.2017 | ||
LU | 27.02.2017 | ||
CH | 28.02.2017 | ||
LI | 28.02.2017 | ||
Former [2018/04] | AT | 27.07.2016 | |
BE | 27.07.2016 | ||
CZ | 27.07.2016 | ||
DK | 27.07.2016 | ||
EE | 27.07.2016 | ||
ES | 27.07.2016 | ||
FI | 27.07.2016 | ||
HR | 27.07.2016 | ||
IT | 27.07.2016 | ||
LT | 27.07.2016 | ||
LV | 27.07.2016 | ||
MC | 27.07.2016 | ||
PL | 27.07.2016 | ||
RO | 27.07.2016 | ||
SE | 27.07.2016 | ||
SI | 27.07.2016 | ||
SK | 27.07.2016 | ||
BG | 27.10.2016 | ||
NO | 27.10.2016 | ||
GR | 28.10.2016 | ||
IS | 27.11.2016 | ||
PT | 28.11.2016 | ||
LU | 27.02.2017 | ||
CH | 28.02.2017 | ||
LI | 28.02.2017 | ||
Former [2017/51] | AT | 27.07.2016 | |
BE | 27.07.2016 | ||
CZ | 27.07.2016 | ||
DK | 27.07.2016 | ||
EE | 27.07.2016 | ||
ES | 27.07.2016 | ||
FI | 27.07.2016 | ||
HR | 27.07.2016 | ||
IT | 27.07.2016 | ||
LT | 27.07.2016 | ||
LV | 27.07.2016 | ||
MC | 27.07.2016 | ||
PL | 27.07.2016 | ||
RO | 27.07.2016 | ||
SE | 27.07.2016 | ||
SI | 27.07.2016 | ||
SK | 27.07.2016 | ||
BG | 27.10.2016 | ||
NO | 27.10.2016 | ||
GR | 28.10.2016 | ||
IS | 27.11.2016 | ||
PT | 28.11.2016 | ||
CH | 28.02.2017 | ||
LI | 28.02.2017 | ||
Former [2017/45] | AT | 27.07.2016 | |
BE | 27.07.2016 | ||
CZ | 27.07.2016 | ||
DK | 27.07.2016 | ||
EE | 27.07.2016 | ||
ES | 27.07.2016 | ||
FI | 27.07.2016 | ||
HR | 27.07.2016 | ||
IT | 27.07.2016 | ||
LT | 27.07.2016 | ||
LV | 27.07.2016 | ||
MC | 27.07.2016 | ||
PL | 27.07.2016 | ||
RO | 27.07.2016 | ||
SE | 27.07.2016 | ||
SI | 27.07.2016 | ||
SK | 27.07.2016 | ||
BG | 27.10.2016 | ||
NO | 27.10.2016 | ||
GR | 28.10.2016 | ||
IS | 27.11.2016 | ||
PT | 28.11.2016 | ||
Former [2017/37] | AT | 27.07.2016 | |
BE | 27.07.2016 | ||
CZ | 27.07.2016 | ||
DK | 27.07.2016 | ||
EE | 27.07.2016 | ||
ES | 27.07.2016 | ||
FI | 27.07.2016 | ||
HR | 27.07.2016 | ||
IT | 27.07.2016 | ||
LT | 27.07.2016 | ||
LV | 27.07.2016 | ||
PL | 27.07.2016 | ||
RO | 27.07.2016 | ||
SE | 27.07.2016 | ||
SI | 27.07.2016 | ||
SK | 27.07.2016 | ||
BG | 27.10.2016 | ||
NO | 27.10.2016 | ||
GR | 28.10.2016 | ||
IS | 27.11.2016 | ||
PT | 28.11.2016 | ||
Former [2017/31] | AT | 27.07.2016 | |
BE | 27.07.2016 | ||
CZ | 27.07.2016 | ||
DK | 27.07.2016 | ||
EE | 27.07.2016 | ||
ES | 27.07.2016 | ||
FI | 27.07.2016 | ||
HR | 27.07.2016 | ||
IT | 27.07.2016 | ||
LT | 27.07.2016 | ||
LV | 27.07.2016 | ||
PL | 27.07.2016 | ||
RO | 27.07.2016 | ||
SE | 27.07.2016 | ||
SK | 27.07.2016 | ||
BG | 27.10.2016 | ||
NO | 27.10.2016 | ||
GR | 28.10.2016 | ||
IS | 27.11.2016 | ||
PT | 28.11.2016 | ||
Former [2017/13] | AT | 27.07.2016 | |
BE | 27.07.2016 | ||
ES | 27.07.2016 | ||
FI | 27.07.2016 | ||
HR | 27.07.2016 | ||
IT | 27.07.2016 | ||
LT | 27.07.2016 | ||
LV | 27.07.2016 | ||
PL | 27.07.2016 | ||
SE | 27.07.2016 | ||
NO | 27.10.2016 | ||
GR | 28.10.2016 | ||
IS | 27.11.2016 | ||
PT | 28.11.2016 | ||
Former [2017/11] | AT | 27.07.2016 | |
BE | 27.07.2016 | ||
ES | 27.07.2016 | ||
FI | 27.07.2016 | ||
HR | 27.07.2016 | ||
IT | 27.07.2016 | ||
LT | 27.07.2016 | ||
PL | 27.07.2016 | ||
SE | 27.07.2016 | ||
NO | 27.10.2016 | ||
GR | 28.10.2016 | ||
IS | 27.11.2016 | ||
PT | 28.11.2016 | ||
Former [2017/10] | BE | 27.07.2016 | |
FI | 27.07.2016 | ||
HR | 27.07.2016 | ||
IT | 27.07.2016 | ||
LT | 27.07.2016 | ||
PL | 27.07.2016 | ||
SE | 27.07.2016 | ||
NO | 27.10.2016 | ||
IS | 27.11.2016 | ||
Former [2017/09] | FI | 27.07.2016 | |
IT | 27.07.2016 | ||
LT | 27.07.2016 | ||
NO | 27.10.2016 | ||
Former [2017/07] | LT | 27.07.2016 | Documents cited: | Search | [XA]WO2006099156 (TAILORED MATERIALS CORP [US], et al) [X] 1,14-16 * pages 1,6,10; figures 1,2 * [A] 2; | [A]WO2007003879 (BAE SYSTEMS PLC [GB], et al) [A] 1,2,14-16 * paragraphs [0004] , [0051] - [0053]; figure 1 * | International search | [X]WO2006069007 (MERIDIAN RES & DEV [US], et al); | [Y]US2005281999 (HOFMANN RAY F [US], et al); | [Y]US2004235379 (AHLUWALIA YOUNGER [US], et al) | by applicant | WO2006099156 |