EP2130277 - CIRCUIT AND METHOD FOR COMPENSATING CAPACITIVE EARTH CURRENTS IN NETWORKS [Right-click to bookmark this link] | |||
Former [2009/50] | METHOD OF IMPROVEMENT OF EARTH-FAULT PROTECTION RELIABILITY AND APPLICABLE WIRING DIAGRAM | ||
[2013/16] | Status | No opposition filed within time limit Status updated on 25.04.2014 Database last updated on 19.10.2024 | Most recent event Tooltip | 15.07.2016 | Lapse of the patent in a contracting state New state(s): TR | published on 17.08.2016 [2016/33] | Applicant(s) | For all designated states EGE, Spol. sr.o. Novohradská 34 370 08 Ceské Budejovice / CZ | [2009/50] | Inventor(s) | 01 /
ZÁK, Frantisek Dlouhá 274 373 67 Borek, Ceské Budejovice / CZ | [2009/50] | Representative(s) | Sedlák, Jirí Dukelskych hrdinu 12 170 00 Praha 7 / CZ | [N/P] |
Former [2013/25] | Sedlák, Jirí Kudrlicka & Sedlák, Husova 5 P.O. Box 1 370 01 Ceské Budejovice / CZ | ||
Former [2009/50] | Sedlák, Jirí Kudrlicka & Sedlák, Husova 5 P.O. Box 1 370 01 Ceské Budejovice / CZ | Application number, filing date | 08734293.7 | 21.03.2008 | [2009/50] | WO2008CZ00034 | Priority number, date | CZ20070000225 | 26.03.2007 Original published format: CZ 20070225 | [2009/50] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2008116428 | Date: | 02.10.2008 | Language: | EN | [2008/40] | Type: | A2 Application without search report | No.: | EP2130277 | Date: | 09.12.2009 | Language: | EN | The application published by WIPO in one of the EPO official languages on 02.10.2008 takes the place of the publication of the European patent application. | [2009/50] | Type: | B1 Patent specification | No.: | EP2130277 | Date: | 19.06.2013 | Language: | EN | [2013/25] | Search report(s) | International search report - published on: | EP | 19.02.2009 | Classification | IPC: | H02H9/08 | [2009/50] | CPC: |
H02H9/08 (EP);
H02H3/006 (EP)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2009/50] | Extension states | AL | Not yet paid | BA | Not yet paid | MK | Not yet paid | RS | Not yet paid | Title | German: | SCHALTUNG UND VERFAHREN ZUR KOMPENSATION KAPAZITIVER ERDSTRÖME IN NETZEN | [2013/17] | English: | CIRCUIT AND METHOD FOR COMPENSATING CAPACITIVE EARTH CURRENTS IN NETWORKS | [2013/16] | French: | CIRCUIT ET PROCÉDÉ DE COMPENSATION DE COURANTS À LA TERRE CAPACITIFS DANS DES RÉSEAUX | [2013/16] |
Former [2009/50] | VERFAHREN ZUR ERHÖHUNG DER ERDSCHLUSSSCHUTZVERLÄSSLICHKEIT UND ANWENDBARER SCHALTPLAN | ||
Former [2009/50] | METHOD OF IMPROVEMENT OF EARTH-FAULT PROTECTION RELIABILITY AND APPLICABLE WIRING DIAGRAM | ||
Former [2009/50] | PROCÉDÉ D'AMÉLIORATION D'UNE FIABILITÉ DE PROTECTION CONTRE LE DÉFAUT À LA MASSE ET DIAGRAMME DE CÂBLAGE APPLICABLE | Entry into regional phase | 09.09.2009 | National basic fee paid | 09.09.2009 | Designation fee(s) paid | 09.09.2009 | Examination fee paid | Examination procedure | 11.09.2009 | Examination requested [2009/50] | 10.04.2012 | Despatch of a communication from the examining division (Time limit: M04) | 18.07.2012 | Reply to a communication from the examining division | 07.12.2012 | Despatch of a communication from the examining division (Time limit: M04) | 04.02.2013 | Reply to a communication from the examining division | 26.03.2013 | Communication of intention to grant the patent | 18.04.2013 | Fee for grant paid | 18.04.2013 | Fee for publishing/printing paid | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 10.04.2012 | Opposition(s) | 20.03.2014 | No opposition filed within time limit [2014/22] | Fees paid | Renewal fee | 03.03.2010 | Renewal fee patent year 03 | 23.02.2011 | Renewal fee patent year 04 | 12.01.2012 | Renewal fee patent year 05 | 19.03.2013 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.03.2008 | BE | 19.06.2013 | CY | 19.06.2013 | DK | 19.06.2013 | EE | 19.06.2013 | FI | 19.06.2013 | IT | 19.06.2013 | LT | 19.06.2013 | LV | 19.06.2013 | MC | 19.06.2013 | MT | 19.06.2013 | NL | 19.06.2013 | RO | 19.06.2013 | SE | 19.06.2013 | SI | 19.06.2013 | TR | 19.06.2013 | BG | 19.09.2013 | NO | 19.09.2013 | GR | 20.09.2013 | ES | 30.09.2013 | IS | 19.10.2013 | PT | 21.10.2013 | [2016/33] |
Former [2016/32] | HU | 21.03.2008 | |
BE | 19.06.2013 | ||
CY | 19.06.2013 | ||
DK | 19.06.2013 | ||
EE | 19.06.2013 | ||
FI | 19.06.2013 | ||
IT | 19.06.2013 | ||
LT | 19.06.2013 | ||
LV | 19.06.2013 | ||
MC | 19.06.2013 | ||
MT | 19.06.2013 | ||
NL | 19.06.2013 | ||
RO | 19.06.2013 | ||
SE | 19.06.2013 | ||
SI | 19.06.2013 | ||
BG | 19.09.2013 | ||
NO | 19.09.2013 | ||
GR | 20.09.2013 | ||
ES | 30.09.2013 | ||
IS | 19.10.2013 | ||
PT | 21.10.2013 | ||
Former [2016/27] | BE | 19.06.2013 | |
CY | 19.06.2013 | ||
DK | 19.06.2013 | ||
EE | 19.06.2013 | ||
FI | 19.06.2013 | ||
IT | 19.06.2013 | ||
LT | 19.06.2013 | ||
LV | 19.06.2013 | ||
MC | 19.06.2013 | ||
MT | 19.06.2013 | ||
NL | 19.06.2013 | ||
RO | 19.06.2013 | ||
SE | 19.06.2013 | ||
SI | 19.06.2013 | ||
BG | 19.09.2013 | ||
NO | 19.09.2013 | ||
GR | 20.09.2013 | ||
ES | 30.09.2013 | ||
IS | 19.10.2013 | ||
PT | 21.10.2013 | ||
Former [2016/12] | BE | 19.06.2013 | |
CY | 19.06.2013 | ||
DK | 19.06.2013 | ||
EE | 19.06.2013 | ||
FI | 19.06.2013 | ||
IT | 19.06.2013 | ||
LT | 19.06.2013 | ||
LV | 19.06.2013 | ||
MT | 19.06.2013 | ||
NL | 19.06.2013 | ||
RO | 19.06.2013 | ||
SE | 19.06.2013 | ||
SI | 19.06.2013 | ||
BG | 19.09.2013 | ||
NO | 19.09.2013 | ||
GR | 20.09.2013 | ||
ES | 30.09.2013 | ||
IS | 19.10.2013 | ||
PT | 21.10.2013 | ||
Former [2014/24] | BE | 19.06.2013 | |
CY | 19.06.2013 | ||
DK | 19.06.2013 | ||
EE | 19.06.2013 | ||
FI | 19.06.2013 | ||
IT | 19.06.2013 | ||
LT | 19.06.2013 | ||
LV | 19.06.2013 | ||
NL | 19.06.2013 | ||
RO | 19.06.2013 | ||
SE | 19.06.2013 | ||
SI | 19.06.2013 | ||
BG | 19.09.2013 | ||
NO | 19.09.2013 | ||
GR | 20.09.2013 | ||
ES | 30.09.2013 | ||
IS | 19.10.2013 | ||
PT | 21.10.2013 | ||
Former [2014/21] | BE | 19.06.2013 | |
CY | 19.06.2013 | ||
DK | 19.06.2013 | ||
EE | 19.06.2013 | ||
FI | 19.06.2013 | ||
LT | 19.06.2013 | ||
LV | 19.06.2013 | ||
NL | 19.06.2013 | ||
RO | 19.06.2013 | ||
SE | 19.06.2013 | ||
SI | 19.06.2013 | ||
BG | 19.09.2013 | ||
NO | 19.09.2013 | ||
GR | 20.09.2013 | ||
ES | 30.09.2013 | ||
IS | 19.10.2013 | ||
PT | 21.10.2013 | ||
Former [2014/18] | BE | 19.06.2013 | |
CY | 19.06.2013 | ||
EE | 19.06.2013 | ||
FI | 19.06.2013 | ||
LT | 19.06.2013 | ||
LV | 19.06.2013 | ||
NL | 19.06.2013 | ||
RO | 19.06.2013 | ||
SE | 19.06.2013 | ||
SI | 19.06.2013 | ||
BG | 19.09.2013 | ||
NO | 19.09.2013 | ||
GR | 20.09.2013 | ||
ES | 30.09.2013 | ||
IS | 19.10.2013 | ||
PT | 21.10.2013 | ||
Former [2014/14] | BE | 19.06.2013 | |
EE | 19.06.2013 | ||
FI | 19.06.2013 | ||
LT | 19.06.2013 | ||
LV | 19.06.2013 | ||
NL | 19.06.2013 | ||
RO | 19.06.2013 | ||
SE | 19.06.2013 | ||
SI | 19.06.2013 | ||
CY | 14.08.2013 | ||
BG | 19.09.2013 | ||
NO | 19.09.2013 | ||
GR | 20.09.2013 | ||
ES | 30.09.2013 | ||
IS | 19.10.2013 | ||
PT | 21.10.2013 | ||
Former [2014/11] | BE | 19.06.2013 | |
EE | 19.06.2013 | ||
FI | 19.06.2013 | ||
LT | 19.06.2013 | ||
LV | 19.06.2013 | ||
RO | 19.06.2013 | ||
SE | 19.06.2013 | ||
SI | 19.06.2013 | ||
CY | 14.08.2013 | ||
BG | 19.09.2013 | ||
NO | 19.09.2013 | ||
GR | 20.09.2013 | ||
ES | 30.09.2013 | ||
IS | 19.10.2013 | ||
PT | 21.10.2013 | ||
Former [2014/10] | BE | 19.06.2013 | |
EE | 19.06.2013 | ||
FI | 19.06.2013 | ||
LT | 19.06.2013 | ||
LV | 19.06.2013 | ||
SE | 19.06.2013 | ||
SI | 19.06.2013 | ||
CY | 14.08.2013 | ||
BG | 19.09.2013 | ||
NO | 19.09.2013 | ||
GR | 20.09.2013 | ||
ES | 30.09.2013 | ||
IS | 19.10.2013 | ||
PT | 21.10.2013 | ||
Former [2014/08] | BE | 19.06.2013 | |
FI | 19.06.2013 | ||
LT | 19.06.2013 | ||
LV | 19.06.2013 | ||
SE | 19.06.2013 | ||
SI | 19.06.2013 | ||
BG | 19.09.2013 | ||
NO | 19.09.2013 | ||
GR | 20.09.2013 | ||
ES | 30.09.2013 | ||
PT | 21.10.2013 | ||
Former [2014/02] | FI | 19.06.2013 | |
LT | 19.06.2013 | ||
LV | 19.06.2013 | ||
SE | 19.06.2013 | ||
SI | 19.06.2013 | ||
BG | 19.09.2013 | ||
NO | 19.09.2013 | ||
GR | 20.09.2013 | ||
ES | 30.09.2013 | ||
Former [2013/50] | FI | 19.06.2013 | |
LT | 19.06.2013 | ||
SE | 19.06.2013 | ||
SI | 19.06.2013 | ||
BG | 19.09.2013 | ||
NO | 19.09.2013 | ||
GR | 20.09.2013 | ||
ES | 30.09.2013 | ||
Former [2013/49] | FI | 19.06.2013 | |
LT | 19.06.2013 | ||
SE | 19.06.2013 | ||
SI | 19.06.2013 | ||
NO | 19.09.2013 | ||
GR | 20.09.2013 | ||
ES | 30.09.2013 | ||
Former [2013/48] | LT | 19.06.2013 | |
NO | 19.09.2013 | ||
ES | 30.09.2013 | ||
Former [2013/47] | LT | 19.06.2013 | |
NO | 19.09.2013 | Cited in | International search | [XA]DE2017867 (ELIN-UNION AG) [X] 1,2 * page 3, paragraph 1 - page 5, paragraph 1; figures 1,4 *[A] 3 | Examination | GB525334 | by applicant | GB525334 |