blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2252833

EP2252833 - GAS LIGHTER AND METHOD FOR MANUFACTURING SAME [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  30.12.2018
Database last updated on 03.08.2024
FormerThe patent has been granted
Status updated on  19.01.2018
FormerGrant of patent is intended
Status updated on  03.10.2017
FormerExamination is in progress
Status updated on  03.01.2017
Most recent event   Tooltip10.07.2020Lapse of the patent in a contracting state
New state(s): IS
published on 12.08.2020  [2020/33]
Applicant(s)For all designated states
Société BIC
14, rue Jeanne d'Asnières
92110 Clichy / FR
[2010/47]
Inventor(s)01 / BICH, François
c/o Société BIC 14
rue Jeanne d'Asnières
F-92110 Clichy / FR
02 / DOUCET, Michel
La Croix Verte
F-35600 Bains Sur Oust / FR
 [2018/08]
Former [2010/47]01 / BICH, François
c/o Société BIC 14 rue Jeanne d'Asnières
F-92110 Clichy / FR
02 / DOUCET, Michel
La Croix Verte
F-35600 Bains Sur Oust / FR
Representative(s)Plasseraud IP
104 Rue de Richelieu
CS92104
75080 Paris Cedex 02 / FR
[N/P]
Former [2018/08]Cabinet Plasseraud
66, rue de la Chaussée d'Antin
75440 Paris Cedex 09 / FR
Former [2010/47]Cabinet Plasseraud
52, rue de la Victoire
75440 Paris Cedex 09 / FR
Application number, filing date08763198.210.03.2008
[2010/47]
WO2008IB52196
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2009112892
Date:17.09.2009
Language:EN
[2009/38]
Type: A1 Application with search report 
No.:EP2252833
Date:24.11.2010
Language:EN
The application published by WIPO in one of the EPO official languages on 17.09.2009 takes the place of the publication of the European patent application.
[2010/47]
Type: B1 Patent specification 
No.:EP2252833
Date:21.02.2018
Language:EN
[2018/08]
Search report(s)International search report - published on:EP17.09.2009
ClassificationIPC:F23Q2/16
[2010/47]
CPC:
F23Q2/163 (EP,US); Y10T137/7504 (EP,US); Y10T137/7668 (EP,US);
Y10T29/49826 (EP,US)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MT,   NL,   NO,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2018/08]
Former [2010/47]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MT,  NL,  NO,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
TitleGerman:GASFEUERZEUG UND HERSTELLUNGSVERFAHREN DAFÜR[2010/47]
English:GAS LIGHTER AND METHOD FOR MANUFACTURING SAME[2010/47]
French:BRIQUET À GAZ ET SON PROCÉDÉ DE FABRICATION[2010/47]
Entry into regional phase27.08.2010National basic fee paid 
27.08.2010Designation fee(s) paid 
27.08.2010Examination fee paid 
Examination procedure27.08.2010Examination requested  [2010/47]
29.08.2016Despatch of a communication from the examining division (Time limit: M04)
27.12.2016Reply to a communication from the examining division
04.10.2017Communication of intention to grant the patent
08.01.2018Fee for grant paid
08.01.2018Fee for publishing/printing paid
08.01.2018Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  29.08.2016
Opposition(s)22.11.2018No opposition filed within time limit [2019/05]
Fees paidRenewal fee
27.08.2010Renewal fee patent year 03
29.03.2011Renewal fee patent year 04
26.03.2012Renewal fee patent year 05
27.03.2013Renewal fee patent year 06
27.03.2014Renewal fee patent year 07
27.03.2015Renewal fee patent year 08
31.03.2016Renewal fee patent year 09
27.03.2017Renewal fee patent year 10
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU10.03.2008
AT21.02.2018
CY21.02.2018
CZ21.02.2018
DK21.02.2018
EE21.02.2018
FI21.02.2018
HR21.02.2018
IT21.02.2018
LT21.02.2018
LV21.02.2018
MC21.02.2018
NL21.02.2018
PL21.02.2018
PT21.02.2018
RO21.02.2018
SE21.02.2018
SI21.02.2018
SK21.02.2018
TR21.02.2018
IE10.03.2018
LU10.03.2018
MT10.03.2018
BE31.03.2018
CH31.03.2018
LI31.03.2018
BG21.05.2018
NO21.05.2018
GR22.05.2018
IS21.06.2018
[2020/33]
Former [2020/27]HU10.03.2008
AT21.02.2018
CY21.02.2018
CZ21.02.2018
DK21.02.2018
EE21.02.2018
FI21.02.2018
HR21.02.2018
IT21.02.2018
LT21.02.2018
LV21.02.2018
MC21.02.2018
NL21.02.2018
PL21.02.2018
PT21.02.2018
RO21.02.2018
SE21.02.2018
SI21.02.2018
SK21.02.2018
TR21.02.2018
IE10.03.2018
LU10.03.2018
MT10.03.2018
BE31.03.2018
CH31.03.2018
LI31.03.2018
BG21.05.2018
NO21.05.2018
GR22.05.2018
Former [2020/16]AT21.02.2018
CY21.02.2018
CZ21.02.2018
DK21.02.2018
EE21.02.2018
FI21.02.2018
HR21.02.2018
IT21.02.2018
LT21.02.2018
LV21.02.2018
MC21.02.2018
NL21.02.2018
PL21.02.2018
RO21.02.2018
SE21.02.2018
SI21.02.2018
SK21.02.2018
TR21.02.2018
IE10.03.2018
LU10.03.2018
MT10.03.2018
BE31.03.2018
CH31.03.2018
LI31.03.2018
BG21.05.2018
NO21.05.2018
GR22.05.2018
Former [2020/08]AT21.02.2018
CY21.02.2018
CZ21.02.2018
DK21.02.2018
EE21.02.2018
FI21.02.2018
HR21.02.2018
IT21.02.2018
LT21.02.2018
LV21.02.2018
MC21.02.2018
NL21.02.2018
PL21.02.2018
RO21.02.2018
SE21.02.2018
SI21.02.2018
SK21.02.2018
IE10.03.2018
LU10.03.2018
MT10.03.2018
BE31.03.2018
CH31.03.2018
LI31.03.2018
BG21.05.2018
NO21.05.2018
GR22.05.2018
Former [2019/12]AT21.02.2018
CY21.02.2018
CZ21.02.2018
DK21.02.2018
EE21.02.2018
FI21.02.2018
HR21.02.2018
IT21.02.2018
LT21.02.2018
LV21.02.2018
MC21.02.2018
NL21.02.2018
PL21.02.2018
RO21.02.2018
SE21.02.2018
SI21.02.2018
SK21.02.2018
IE10.03.2018
LU10.03.2018
BE31.03.2018
CH31.03.2018
LI31.03.2018
BG21.05.2018
NO21.05.2018
GR22.05.2018
Former [2019/09]AT21.02.2018
CY21.02.2018
CZ21.02.2018
DK21.02.2018
EE21.02.2018
FI21.02.2018
HR21.02.2018
IT21.02.2018
LT21.02.2018
LV21.02.2018
MC21.02.2018
NL21.02.2018
PL21.02.2018
RO21.02.2018
SE21.02.2018
SK21.02.2018
IE10.03.2018
LU10.03.2018
BG21.05.2018
NO21.05.2018
GR22.05.2018
Former [2019/04]AT21.02.2018
CY21.02.2018
CZ21.02.2018
DK21.02.2018
EE21.02.2018
FI21.02.2018
HR21.02.2018
IT21.02.2018
LT21.02.2018
LV21.02.2018
MC21.02.2018
NL21.02.2018
PL21.02.2018
RO21.02.2018
SE21.02.2018
SK21.02.2018
LU10.03.2018
BG21.05.2018
NO21.05.2018
GR22.05.2018
Former [2018/52]AT21.02.2018
CY21.02.2018
CZ21.02.2018
DK21.02.2018
EE21.02.2018
FI21.02.2018
HR21.02.2018
IT21.02.2018
LT21.02.2018
LV21.02.2018
MC21.02.2018
NL21.02.2018
PL21.02.2018
RO21.02.2018
SE21.02.2018
SK21.02.2018
BG21.05.2018
NO21.05.2018
GR22.05.2018
Former [2018/51]AT21.02.2018
CY21.02.2018
CZ21.02.2018
DK21.02.2018
EE21.02.2018
FI21.02.2018
HR21.02.2018
IT21.02.2018
LT21.02.2018
LV21.02.2018
NL21.02.2018
PL21.02.2018
RO21.02.2018
SE21.02.2018
SK21.02.2018
BG21.05.2018
NO21.05.2018
GR22.05.2018
Former [2018/50]AT21.02.2018
CY21.02.2018
CZ21.02.2018
EE21.02.2018
FI21.02.2018
HR21.02.2018
IT21.02.2018
LT21.02.2018
LV21.02.2018
NL21.02.2018
PL21.02.2018
RO21.02.2018
SE21.02.2018
SK21.02.2018
BG21.05.2018
NO21.05.2018
GR22.05.2018
Former [2018/47]AT21.02.2018
CY21.02.2018
FI21.02.2018
HR21.02.2018
IT21.02.2018
LT21.02.2018
LV21.02.2018
NL21.02.2018
SE21.02.2018
BG21.05.2018
NO21.05.2018
GR22.05.2018
Former [2018/40]AT21.02.2018
CY21.02.2018
FI21.02.2018
HR21.02.2018
LT21.02.2018
LV21.02.2018
NL21.02.2018
SE21.02.2018
BG21.05.2018
NO21.05.2018
GR22.05.2018
Former [2018/37]CY21.02.2018
FI21.02.2018
HR21.02.2018
LT21.02.2018
NL21.02.2018
NO21.05.2018
GR22.05.2018
Former [2018/35]CY21.02.2018
FI21.02.2018
HR21.02.2018
LT21.02.2018
NL21.02.2018
NO21.05.2018
Cited inInternational search[X]FR2841634  (BIC SOC [FR]) [X] 1-5,7,12-15 * the whole document *;
 [A]US4153233  (NEYRET GUY) [A] 1 * abstract *;
 [A]GB1154553  (DEXTER LEONARD SHULMAN [CA]) [A] 1 * page 3, line 115 - line 129; figure 8 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.