EP2167547 - METHOD FOR OPTIMIZING ENERGY EFFICIENCY IN A POLYMERIZATION PROCESS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 06.03.2015 Database last updated on 19.10.2024 | Most recent event Tooltip | 08.07.2016 | Lapse of the patent in a contracting state New state(s): HU | published on 10.08.2016 [2016/32] | Applicant(s) | For all designated states TOTAL RESEARCH & TECHNOLOGY FELUY Zone Industrielle C 7181 Seneffe / BE | [2012/35] |
Former [2010/13] | For all designated states Total Petrochemicals Research Feluy Zone Industrielle C 7181 Seneffe (Feluy) / BE | Inventor(s) | 01 /
VAN DER SCHRICK, Bernard Rue de la Cambre 161 B-1150 Bruxelles / BE | [2010/13] | Representative(s) | Bounaga, Sakina De Clercq & Partners cvba Edgard Gevaertdreef 10a 9830 Sint-Martens-Latem / BE | [2012/02] |
Former [2010/13] | Leyder, Francis Total Petrochemicals Research Feluy Zone Industrielle C 7181 Seneffe (Feluy) / BE | Application number, filing date | 08775105.3 | 15.07.2008 | [2010/13] | WO2008EP59248 | Priority number, date | EP20070112523 | 16.07.2007 Original published format: EP 07112523 | [2014/18] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2009010514 | Date: | 22.01.2009 | Language: | EN | [2009/04] | Type: | A1 Application with search report | No.: | EP2167547 | Date: | 31.03.2010 | Language: | EN | The application published by WIPO in one of the EPO official languages on 22.01.2009 takes the place of the publication of the European patent application. | [2010/13] | Type: | B1 Patent specification | No.: | EP2167547 | Date: | 30.04.2014 | Language: | EN | [2014/18] | Search report(s) | International search report - published on: | EP | 22.01.2009 | Classification | IPC: | C08F10/00, C08F2/14, C08F2/00, F01K25/10, F22B1/16 | [2013/26] | CPC: |
C08F10/00 (EP,US);
F01K25/10 (EP,US);
F22B1/16 (EP,US);
C08F110/02 (EP,US);
Y02B30/52 (EP,US);
Y02P20/10 (EP,US);
Y10S526/92 (EP,US)
(-)
| C-Set: |
C08F10/00, C08F2/00 (US,EP);
C08F10/00, C08F2/14 (EP,US) |
Former IPC [2012/29] | F01K25/10, F22B1/16 | ||
Former IPC [2010/13] | C08F2/00, C08F2/14, C08F10/00 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2010/13] | Title | German: | VERFAHREN ZUR OPTIMIERUNG DER ENERGIEEFFIZIENZ BEI EINEM POLYMERISATIONSPROZESS | [2010/13] | English: | METHOD FOR OPTIMIZING ENERGY EFFICIENCY IN A POLYMERIZATION PROCESS | [2010/13] | French: | PROCÉDÉ PERMETTANT D'OPTIMISER LE RENDEMENT ÉNERGÉTIQUE DANS UN PROCESSUS DE POLYMÉRISATION | [2010/13] | Entry into regional phase | 15.01.2010 | National basic fee paid | 15.01.2010 | Designation fee(s) paid | 15.01.2010 | Examination fee paid | Examination procedure | 15.01.2010 | Examination requested [2010/13] | 26.07.2010 | Despatch of a communication from the examining division (Time limit: M04) | 25.11.2010 | Reply to a communication from the examining division | 29.01.2013 | Date of oral proceedings | 07.02.2013 | Despatch of a communication from the examining division (Time limit: M02) | 07.02.2013 | Minutes of oral proceedings despatched | 10.04.2013 | Reply to a communication from the examining division | 26.06.2013 | Communication of intention to grant the patent | 25.10.2013 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 25.10.2013 | Fee for grant paid | 25.10.2013 | Fee for publishing/printing paid | 08.11.2013 | Communication of intention to grant the patent | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 26.07.2010 | Opposition(s) | 02.02.2015 | No opposition filed within time limit [2015/15] | Fees paid | Renewal fee | 15.07.2010 | Renewal fee patent year 03 | 08.07.2011 | Renewal fee patent year 04 | 13.07.2012 | Renewal fee patent year 05 | 12.07.2013 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 15.07.2008 | CY | 30.04.2014 | CZ | 30.04.2014 | DK | 30.04.2014 | EE | 30.04.2014 | HR | 30.04.2014 | IT | 30.04.2014 | LT | 30.04.2014 | LV | 30.04.2014 | MC | 30.04.2014 | MT | 30.04.2014 | PL | 30.04.2014 | RO | 30.04.2014 | SI | 30.04.2014 | SK | 30.04.2014 | IE | 15.07.2014 | LU | 15.07.2014 | BG | 30.07.2014 | NO | 30.07.2014 | CH | 31.07.2014 | GR | 31.07.2014 | LI | 31.07.2014 | IS | 30.08.2014 | PT | 01.09.2014 | [2016/32] |
Former [2016/28] | CY | 30.04.2014 | |
CZ | 30.04.2014 | ||
DK | 30.04.2014 | ||
EE | 30.04.2014 | ||
HR | 30.04.2014 | ||
IT | 30.04.2014 | ||
LT | 30.04.2014 | ||
LV | 30.04.2014 | ||
MC | 30.04.2014 | ||
MT | 30.04.2014 | ||
PL | 30.04.2014 | ||
RO | 30.04.2014 | ||
SI | 30.04.2014 | ||
SK | 30.04.2014 | ||
IE | 15.07.2014 | ||
LU | 15.07.2014 | ||
BG | 30.07.2014 | ||
NO | 30.07.2014 | ||
CH | 31.07.2014 | ||
GR | 31.07.2014 | ||
LI | 31.07.2014 | ||
IS | 30.08.2014 | ||
PT | 01.09.2014 | ||
Former [2016/21] | CY | 30.04.2014 | |
CZ | 30.04.2014 | ||
DK | 30.04.2014 | ||
EE | 30.04.2014 | ||
HR | 30.04.2014 | ||
IT | 30.04.2014 | ||
LT | 30.04.2014 | ||
LV | 30.04.2014 | ||
MC | 30.04.2014 | ||
PL | 30.04.2014 | ||
RO | 30.04.2014 | ||
SI | 30.04.2014 | ||
SK | 30.04.2014 | ||
IE | 15.07.2014 | ||
LU | 15.07.2014 | ||
BG | 30.07.2014 | ||
NO | 30.07.2014 | ||
CH | 31.07.2014 | ||
GR | 31.07.2014 | ||
LI | 31.07.2014 | ||
IS | 30.08.2014 | ||
PT | 01.09.2014 | ||
Former [2015/37] | CY | 30.04.2014 | |
CZ | 30.04.2014 | ||
DK | 30.04.2014 | ||
EE | 30.04.2014 | ||
HR | 30.04.2014 | ||
IT | 30.04.2014 | ||
LT | 30.04.2014 | ||
LV | 30.04.2014 | ||
PL | 30.04.2014 | ||
RO | 30.04.2014 | ||
SI | 30.04.2014 | ||
SK | 30.04.2014 | ||
IE | 15.07.2014 | ||
LU | 15.07.2014 | ||
BG | 30.07.2014 | ||
NO | 30.07.2014 | ||
CH | 31.07.2014 | ||
GR | 31.07.2014 | ||
LI | 31.07.2014 | ||
IS | 30.08.2014 | ||
PT | 01.09.2014 | ||
Former [2015/36] | CY | 30.04.2014 | |
CZ | 30.04.2014 | ||
DK | 30.04.2014 | ||
EE | 30.04.2014 | ||
HR | 30.04.2014 | ||
IT | 30.04.2014 | ||
LT | 30.04.2014 | ||
LV | 30.04.2014 | ||
PL | 30.04.2014 | ||
RO | 30.04.2014 | ||
SI | 30.04.2014 | ||
SK | 30.04.2014 | ||
LU | 15.07.2014 | ||
BG | 30.07.2014 | ||
NO | 30.07.2014 | ||
CH | 31.07.2014 | ||
GR | 31.07.2014 | ||
LI | 31.07.2014 | ||
IS | 30.08.2014 | ||
PT | 01.09.2014 | ||
Former [2015/20] | CY | 30.04.2014 | |
CZ | 30.04.2014 | ||
DK | 30.04.2014 | ||
EE | 30.04.2014 | ||
HR | 30.04.2014 | ||
IT | 30.04.2014 | ||
LT | 30.04.2014 | ||
LV | 30.04.2014 | ||
PL | 30.04.2014 | ||
RO | 30.04.2014 | ||
SK | 30.04.2014 | ||
LU | 15.07.2014 | ||
BG | 30.07.2014 | ||
NO | 30.07.2014 | ||
CH | 31.07.2014 | ||
GR | 31.07.2014 | ||
LI | 31.07.2014 | ||
IS | 30.08.2014 | ||
PT | 01.09.2014 | ||
Former [2015/18] | CY | 30.04.2014 | |
CZ | 30.04.2014 | ||
DK | 30.04.2014 | ||
EE | 30.04.2014 | ||
HR | 30.04.2014 | ||
IT | 30.04.2014 | ||
LT | 30.04.2014 | ||
LV | 30.04.2014 | ||
PL | 30.04.2014 | ||
RO | 30.04.2014 | ||
SK | 30.04.2014 | ||
LU | 15.07.2014 | ||
BG | 30.07.2014 | ||
NO | 30.07.2014 | ||
GR | 31.07.2014 | ||
IS | 30.08.2014 | ||
PT | 01.09.2014 | ||
Former [2015/13] | CY | 30.04.2014 | |
CZ | 30.04.2014 | ||
DK | 30.04.2014 | ||
EE | 30.04.2014 | ||
HR | 30.04.2014 | ||
LT | 30.04.2014 | ||
LV | 30.04.2014 | ||
PL | 30.04.2014 | ||
RO | 30.04.2014 | ||
SK | 30.04.2014 | ||
LU | 15.07.2014 | ||
BG | 30.07.2014 | ||
NO | 30.07.2014 | ||
GR | 31.07.2014 | ||
IS | 30.08.2014 | ||
PT | 01.09.2014 | ||
Former [2015/11] | CY | 30.04.2014 | |
CZ | 30.04.2014 | ||
DK | 30.04.2014 | ||
EE | 30.04.2014 | ||
HR | 30.04.2014 | ||
LT | 30.04.2014 | ||
LV | 30.04.2014 | ||
PL | 30.04.2014 | ||
RO | 30.04.2014 | ||
SK | 30.04.2014 | ||
BG | 30.07.2014 | ||
NO | 30.07.2014 | ||
GR | 31.07.2014 | ||
IS | 30.08.2014 | ||
PT | 01.09.2014 | ||
Former [2015/10] | CY | 30.04.2014 | |
CZ | 30.04.2014 | ||
DK | 30.04.2014 | ||
EE | 30.04.2014 | ||
HR | 30.04.2014 | ||
LT | 30.04.2014 | ||
LV | 30.04.2014 | ||
PL | 30.04.2014 | ||
SK | 30.04.2014 | ||
BG | 30.07.2014 | ||
NO | 30.07.2014 | ||
GR | 31.07.2014 | ||
IS | 30.08.2014 | ||
PT | 01.09.2014 | ||
Former [2015/08] | CY | 30.04.2014 | |
DK | 30.04.2014 | ||
HR | 30.04.2014 | ||
LT | 30.04.2014 | ||
LV | 30.04.2014 | ||
PL | 30.04.2014 | ||
BG | 30.07.2014 | ||
NO | 30.07.2014 | ||
GR | 31.07.2014 | ||
IS | 30.08.2014 | ||
PT | 01.09.2014 | ||
Former [2015/02] | CY | 30.04.2014 | |
HR | 30.04.2014 | ||
LT | 30.04.2014 | ||
LV | 30.04.2014 | ||
PL | 30.04.2014 | ||
BG | 30.07.2014 | ||
NO | 30.07.2014 | ||
GR | 31.07.2014 | ||
IS | 30.08.2014 | ||
PT | 01.09.2014 | ||
Former [2014/50] | CY | 30.04.2014 | |
HR | 30.04.2014 | ||
LT | 30.04.2014 | ||
LV | 30.04.2014 | ||
PL | 30.04.2014 | ||
BG | 30.07.2014 | ||
NO | 30.07.2014 | ||
GR | 31.07.2014 | ||
IS | 30.08.2014 | ||
Former [2014/49] | CY | 30.04.2014 | |
LT | 30.04.2014 | ||
BG | 30.07.2014 | ||
NO | 30.07.2014 | ||
IS | 30.08.2014 | ||
Former [2014/48] | CY | 30.04.2014 | |
LT | 30.04.2014 | ||
BG | 30.07.2014 | ||
Former [2014/47] | CY | 30.04.2014 | Cited in | International search | [Y]WO2006026493 (CHEVRON PHILLIPS CHEMICAL CO [US]) [Y] 1-15 * page 45 - page 47; claim - *; | [DY] - HUNG T C ET AL, "A review of organic Rankine cycles (ORCs) for the recovery of low-grade waste heat", ENERGY, PERGAMON PRESS, OXFORD, GB, (1997), vol. 22, no. 7, ISSN 0360-5442, pages 661 - 667, XP002313247 [DY] 1-15 * page 661 - page 667 * DOI: http://dx.doi.org/10.1016/S0360-5442(96)00165-X | Examination | US3827243 | GB2095688 |