blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2176020

EP2176020 - CUTTING TOOL AND TOOL BODY [Right-click to bookmark this link]
Former [2010/16]CUTTING TOOL, TOOL BODY AND CUTTING INSERT THEREFOR
[2011/30]
StatusNo opposition filed within time limit
Status updated on  08.02.2013
Database last updated on 09.07.2024
Most recent event   Tooltip18.07.2014Lapse of the patent in a contracting state
New state(s): HU
published on 20.08.2014  [2014/34]
Applicant(s)For all designated states
Iscar Ltd.
P.O. Box 11
24959 Tefen / IL
[2010/16]
Inventor(s)01 / HECHT, Gil
30/18 Ahad Ha'am Street
22443 Nahariya / IL
02 / KERTSMAN, Oleg
5a Machteret Street
29063 Kiryat Yam / IL
 [2010/16]
Representative(s)Vossius & Partner Patentanwälte Rechtsanwälte mbB
Siebertstrasse 3
81675 München / DE
[N/P]
Former [2012/14]Vossius & Partner
Siebertstrasse 4
81675 München / DE
Former [2010/16]Vossius & Partner
Siebertstraße 4
81675 München / DE
Application number, filing date08776588.909.07.2008
[2010/16]
WO2008IL00939
Priority number, dateIL2007018504705.08.2007         Original published format: IL 18504707
[2010/16]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2009019677
Date:12.02.2009
Language:EN
[2009/07]
Type: A1 Application with search report 
No.:EP2176020
Date:21.04.2010
Language:EN
The application published by WIPO in one of the EPO official languages on 12.02.2009 takes the place of the publication of the European patent application.
[2010/16]
Type: B1 Patent specification 
No.:EP2176020
Date:04.04.2012
Language:EN
[2012/14]
Search report(s)International search report - published on:EP12.02.2009
ClassificationIPC:B23B27/04, B23B29/04
[2010/16]
CPC:
B23B29/043 (EP,US); B23B27/007 (EP,US); B23B27/1622 (EP,US);
B23B29/046 (EP,US); B23B2200/165 (EP,US); B23B2220/126 (EP,US);
B23B2260/072 (EP,US); B23B2260/112 (EP,US); Y10T407/2272 (EP,US);
Y10T407/2276 (EP,US); Y10T407/23 (EP,US) (-)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MT,   NL,   NO,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2010/16]
TitleGerman:SCHNEIDWERKZEUG UND WERKZEUGKÖRPER[2011/30]
English:CUTTING TOOL AND TOOL BODY[2011/30]
French:OUTIL DE COUPE ET CORPS D'OUTIL[2011/30]
Former [2010/16]SCHNEIDWERKZEUG, WERKZEUGKÖRPER UND SCHNEIDEINSATZ DAFÜR
Former [2010/16]CUTTING TOOL, TOOL BODY AND CUTTING INSERT THEREFOR
Former [2010/16]OUTIL DE COUPE, CORPS D'OUTIL ET INSERT DE COUPE POUR CELUI-CI
Entry into regional phase03.02.2010National basic fee paid 
03.02.2010Designation fee(s) paid 
03.02.2010Examination fee paid 
Examination procedure03.02.2010Examination requested  [2010/16]
01.06.2010Despatch of a communication from the examining division (Time limit: M04)
11.10.2010Reply to a communication from the examining division
11.11.2010Despatch of a communication from the examining division (Time limit: M06)
23.05.2011Reply to a communication from the examining division
04.10.2011Communication of intention to grant the patent
10.02.2012Fee for grant paid
10.02.2012Fee for publishing/printing paid
Divisional application(s)EP11190032.0  / EP2428296
EP12162909.1  / EP2502690
The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  01.06.2010
Opposition(s)07.01.2013No opposition filed within time limit [2013/11]
Fees paidRenewal fee
20.05.2010Renewal fee patent year 03
27.05.2011Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU09.07.2008
BE04.04.2012
CY04.04.2012
DK04.04.2012
EE04.04.2012
FI04.04.2012
HR04.04.2012
LT04.04.2012
LV04.04.2012
MT04.04.2012
NL04.04.2012
RO04.04.2012
SI04.04.2012
SK04.04.2012
BG04.07.2012
NO04.07.2012
GR05.07.2012
IE09.07.2012
LU09.07.2012
CH31.07.2012
LI31.07.2012
MC31.07.2012
IS04.08.2012
[2014/34]
Former [2014/27]BE04.04.2012
CY04.04.2012
DK04.04.2012
EE04.04.2012
FI04.04.2012
HR04.04.2012
LT04.04.2012
LV04.04.2012
MT04.04.2012
NL04.04.2012
RO04.04.2012
SI04.04.2012
SK04.04.2012
BG04.07.2012
NO04.07.2012
GR05.07.2012
IE09.07.2012
LU09.07.2012
CH31.07.2012
LI31.07.2012
MC31.07.2012
IS04.08.2012
Former [2013/34]BE04.04.2012
CY04.04.2012
DK04.04.2012
EE04.04.2012
FI04.04.2012
HR04.04.2012
LT04.04.2012
LV04.04.2012
MT04.04.2012
NL04.04.2012
RO04.04.2012
SI04.04.2012
SK04.04.2012
BG04.07.2012
NO04.07.2012
GR05.07.2012
IE09.07.2012
CH31.07.2012
LI31.07.2012
MC31.07.2012
IS04.08.2012
Former [2013/33]BE04.04.2012
CY04.04.2012
DK04.04.2012
EE04.04.2012
FI04.04.2012
HR04.04.2012
LT04.04.2012
LV04.04.2012
NL04.04.2012
RO04.04.2012
SI04.04.2012
SK04.04.2012
NO04.07.2012
GR05.07.2012
IE09.07.2012
CH31.07.2012
LI31.07.2012
MC31.07.2012
IS04.08.2012
Former [2013/20]BE04.04.2012
CY04.04.2012
DK04.04.2012
EE04.04.2012
FI04.04.2012
HR04.04.2012
LT04.04.2012
LV04.04.2012
NL04.04.2012
RO04.04.2012
SI04.04.2012
SK04.04.2012
NO04.07.2012
GR05.07.2012
CH31.07.2012
LI31.07.2012
MC31.07.2012
IS04.08.2012
Former [2013/11]BE04.04.2012
CY04.04.2012
DK04.04.2012
EE04.04.2012
FI04.04.2012
HR04.04.2012
LT04.04.2012
LV04.04.2012
NL04.04.2012
RO04.04.2012
SI04.04.2012
SK04.04.2012
NO04.07.2012
GR05.07.2012
MC31.07.2012
IS04.08.2012
Former [2013/10]BE04.04.2012
CY04.04.2012
DK04.04.2012
EE04.04.2012
FI04.04.2012
HR04.04.2012
LT04.04.2012
LV04.04.2012
NL04.04.2012
RO04.04.2012
SI04.04.2012
SK04.04.2012
NO04.07.2012
GR05.07.2012
IS04.08.2012
Former [2013/09]BE04.04.2012
CY04.04.2012
DK04.04.2012
EE04.04.2012
FI04.04.2012
HR04.04.2012
LT04.04.2012
LV04.04.2012
NL04.04.2012
SI04.04.2012
NO04.07.2012
GR05.07.2012
IS04.08.2012
Former [2013/08]BE04.04.2012
CY04.04.2012
DK04.04.2012
FI04.04.2012
HR04.04.2012
LT04.04.2012
LV04.04.2012
NL04.04.2012
SI04.04.2012
NO04.07.2012
GR05.07.2012
IS04.08.2012
Former [2013/04]BE04.04.2012
CY04.04.2012
FI04.04.2012
HR04.04.2012
LT04.04.2012
LV04.04.2012
SI04.04.2012
NO04.07.2012
GR05.07.2012
IS04.08.2012
Former [2012/50]CY04.04.2012
FI04.04.2012
HR04.04.2012
LT04.04.2012
LV04.04.2012
SI04.04.2012
NO04.07.2012
GR05.07.2012
IS04.08.2012
Former [2012/49]CY04.04.2012
FI04.04.2012
LT04.04.2012
SI04.04.2012
NO04.07.2012
IS04.08.2012
Former [2012/48]FI04.04.2012
LT04.04.2012
NO04.07.2012
Former [2012/47]LT04.04.2012
NO04.07.2012
Cited inInternational search[AD]US5159863  (SIMPSON III VANDELL E [US]);
 [A]WO9711806  (SANDVIK AB [SE], et al) [A] 1,8,14 * page 3 *;
 [AD]US5709508  (BARAZANI GIDEON [IL], et al);
 [X]US5820310  (BOIANJIU GIDEON [IL]) [X] 8,10-12 * the whole document *;
 [AD]US6244789  (TSUDA YUUICHI [JP]) [AD] 1,8,14 * the whole document *;
 [A]DE202005016610U  (OTTO DIETERLE SPEZIALWERKZEUGE [DE]);
 [XA]EP1657012  (APPLITEC MOUTIER S A [CH]) [X] 8,10-12,14,16,17 * the whole document * [A] 1,8;
 [A]JP2007175843  (KYOCERA CORP)
ExaminationUS5702210
 US6126366
 US6152658
 US2002131829
 US2006120812
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.